HomeMy WebLinkAboutFORT COLLINS LOVELAND WATER DISTRICT - PDP - 23-98 - SUBMITTAL DOCUMENTS - ROUND 1 - SUBMITTAL CHECKLISTPage Two
Project Development Plan (Continued) Citv of Fort CollA
❑ Other information Director may require.
_Natural area or environmental study
E]-�Copy of applicable conceptual letter and explanation of how issues have been addressed.
2' Legal description of the site (one copy on 8 1/2" x 11" sheet).
[a Name and address of each owner of property within the boundaries of the
development plan area.
G'List of names of all general and limited partners and/or officers involved as either
applicants or owners.
,'0�'`CDevelopment phasing schedule.
OL'txplanation of any variance request(s).
,C❑ Signed letters of intent indicated that all required off -site easements and off -site
rights -of -way can be negotiated in time for final development plan submittal.
evised 518197
-r�
Submittal Checklist
,
Project Development Plan
ITdT �s
c:roofFortcoUi
1 Pl
'di . �,.
�
The following information is required to be submitted, unless waived, with all applications.
Any item waived must be dated and initialed by a planner with the City of Fort Collins
Current Planni g Department.
El' Application form and filing fee (I
iQc s for each APO label).
'Three (3) lists of names and addresses of all owners of record of real property within
at least 500' of the property lines for the parcel of I -for which the project is
proposed, exclusive of public right-of-way. (Two,(2) lists typed on mailing labels (33
names per sheet) and the other list on a reproducible copy of those labels.)
CYCertification of Type I or Type II review.
C�Site plan drawings (30 copies). (Refer to the submittal requirements which outline
information to be presented on the site plan.) 24"x36" (folded)
[]''Subdivision Plat (23 copies). (folded)
[a Architectural elevations (6 copies). (folded)
Landscape Plan (20 copies). (Refer to the submittal requirements which outline
information to be presented on the landscape plan.) (folded)
G�'Statement of planning objectives (26 copies).
C2 'Transportation Impact Analysis (TIA) (6 copies).
I� Utility plans (existing and proposed utility systems) (12 copies). (unfolded)
Drainage and erosion control report (4 copies).
21§cils report (2 copies).
2' Context diagram (5 copies). (folded)
C�-�ighting Plan (5 copies). (folded)
Iazardous Materials Impact Analysis (4 copies).
% Street cross section schematics (if not included in the utility plans (8 copies). (folded)
' Revised 518197 Continued on the following page.