Loading...
HomeMy WebLinkAboutPROSPECT INDUSTRIAL PARK, LOT 19 - PDP - 28-98E - SUBMITTAL DOCUMENTS - ROUND 1 - TRAFFIC STUDYSteve Olt -Lot 19, Prospect Industrial Par Page 1 j From: Eric Bracke To: Steve Olt Date: 01/02/2007 1:25:58 PM Subject: Lot 19, Prospect Industrial Park The Transportation Impact Study for the above -stated project has been waived. Kind Regards, Eric L. Bracke, P.E., P.T.O.E. City Traffic Engineer (970)224-6062 ebracke@fcgov.com CC: David Averill; eastpoint@frii.com; Sheri Langenberger