HomeMy WebLinkAbout401 WEST MOUNTAIN AVENUE - PDP - 29-98 - DECISION - FINDINGS, CONCLUSIONS & DECISION`ER f0 CIVIL
5 N
DIKE UCK,
CONTtXTION
JOINf5,ty
5fA\VAa7
CONCMTE MAK LINE MMEN
CaR CONCM9 CaOK5
5fAMPAW
CONCIFM
---------------
PLAN
1 "=10'
WALL AW CSATE,
mup To
AP,CHITECT5
PIKE ZACK,
,
fag■,
J.\■■l
�t
col■■■
FTI
�
CONT■■rid■■■
1�
/..O
9i1
=-
R
V
11-30-1998 13:04
970 224 1662
i
VAUGHT FRVE ARC'_TECTS
P.01
W A%6v5
is
yT
Z
a
5. The application meets all applicable Land Use and Development Standards of Article
IV of the Land Use Code for the Canyon Avenue Subdistrict.
6. The Project Development Plan is compatible with the neighborhood.
DECISION
Based upon the findings and conclusions, the applicant's request for Preliminary
Development Plan Approval for 401 Mountain Project #29-98 is approved with the
following conditions:
1. The applicant shall comply with all notes and conditions set forth on the applicant's
submittal sheets 1 through 4 as revised on 10/21 /98.
2. The location of the trash receptacle shall be as shown of the applicant's submittal dated
11 /30/1998.
Dated this 5th day of December, 1998, by authority granted by Section 2.1 of the Fort
Collins Land Use Code.
Steven Klausing, Hearing Offi er
ri
Based upon the fact that there are no protected views from the site the Director waived
the requirement of a view analysis (Section 3.5.1(H)(1)(a)(4)(b)(1) for this site. A
representative of the proposed building owners to the west testified that they did not
object to the proposal and the height of the building. There was no public testimony
opposing the project. Some members of the public had questions regarding design
specifics and these were adequately addressed by the applicant. The evidence is that the
building complies with the special review criteria of Section 3.5.1(1-1)(a)(4)(b)(1)
concerning light, shadows, privacy and neighborhood scale. The design of the building
will be enhanced by the proposed height.
RNM (0• ITITITO K0477111TIMM
A neighborhood meeting was held on May 28, 1998. Minutes of the meeting were
submitted at the hearing. Members of the public attended the hearing and inquired
regarding the location of the trash receptacle, the use of solar energy equipment and other
issues. The applicant has agreed to relocate the trash receptacle as reflected in the
applicant's submittal dated 11/30/1998. The relocation of the trash receptacle is noted by
the Hearing Officer and is hereby made a modification of the submittal and a condition of
the approval of the Project Development Plan. The proposed uses are consistent with the
land uses designated for the Canyon Avenue Subdistrict, and the uses are permitted within
the Canyon Avenue Subdistrict. The project complies with the Article III General
Development Standards and the Article IV Development Standards and therefore is
compatible with the neighborhood.
FINDINGS, CONCLUSIONS AND DECISION
FINDINGS AND CONCLUSION
After reviewing the staff report and recommendation, the applicant's submittal, hearing the
testimony and considering the record the Hearing Officer makes the following findings and
conclusions:
1. The applicant has submitted a Project Development Plan which complies with the
requirements of Article 2, Administration of the Land Use Code.
2. The property is located in the Canyon Avenue Subdistrict Downtown District and the
proposed uses, two family residential, retail and office, are permitted within this zoning
district.
3. The application meets all the relevant standards of Article 3 General Development
Standards.
4. The height of the building requires a shadow analysis. The result of the analysis
indicates that the building will not cast a shadow greater than a hypothetical 25 foot wall,
at the property line and accordingly the proposed height is permissible.
5
proposed Project Development Plan complies with the Land Use Standards of the Canyon
Ave. Subdistrict of the Downtown District as set forth in Section 4.12(D) of the Land Use
Code.
The applicant and the owner testified to the design, layout, materials, landscaping and
architectural details of the building. The evidence is that the building has been designed to
incorporate architectural and design elements of the surrounding uses and to be
compatible with architectural styles in use during periods as reflected in the surrounding
uses. The proposed streetseape creates a pedestrian friendly environment and will
encourage pedestrian access. The use of a variety of materials, colors and textures will
create a visually interesting building which will also break up the mass of the building.
While the building is larger than those in the immediate area the design and materials will
create an appearance which will be compatible with the neighborhood. The project
complies with all applicable Development Standards related to Building Design, Facades,
and Site Design of the Canyon Ave. Subdistrict of the Downtown District as set forth in
Section 4.12(E) of the Land Use Code.
The Project Development Plan must meet all applicable standards in Article 3, General
Development Standards, of the Land Use Code. The applicant presented evidence of
compliance with the standards. Compliance with the following standards is noted.
The planner testified that the Project Development Plan meets all of the applicable
standards of Article 3, General Development Standards. The planner and applicant
testified that the project would have 9 off street parking spaces and 17 on street parking
spaces. Pursuant to Section 3.2.2 of the Land Use Code a minimum of 4 and a maximum
of 60 parking spaces are allowed. The proposal is consistent with the code requirements.
This three story building is proposed to be 49 feet 10 inches high as measured at the
height of the penthouse. Rooftop elements exceed the 40 foot height limit therefore a
shadow analysis is required pursuant to Section 3.5. l (H)(1)(a)(4)(b)(1). A height analysis
was performed and presented at the hearing. The shadow analysis measures the shadow
created at 9 a.m., noon, and 3 p.m. on December 21 by a hypothetical 25 foot wall at the
property line and the proposed building. This analysis measures the maximum shadow
created during the year. The analysis reveals that no shadow will be cast upon any
adjacent structure to any greater extent than that created by the hypothetical wall at the
property line.
4
Citizens Providing Testimony
Michael Ehler
401 Mulberry
Fort Collins, CO 80525
The applicant's submittal materials and the staff report are a part of the record and are
incorporated herein by reference. The Hearing Officer takes official notice of the
drawings and visual aids used during the hearing.
N: NCM; Mountain Ave., existing single-family residential
NCB; Mountain Ave., Edwards House Bed and Breakfast
D(Canyon Ave.); Mountain Ave. Meldnxm St., Avery House, St. Josephs
Catholic Church and Elementary School
S: NCM; parking lot
D(Canyon Ave.); office retail building
W: NCM; office building, single family residential
E: D(Canyon Ave.); Meldrum Ave., office (Fort Collins Travel), supermarket
(Steele's)
This site is known as a portion of lots 7 and 8 of the original Plat of the City of Fort
Collins recorded on January 16, 1873.
Findings
The city planner testified that the proposed uses, two family residential, office and retail
are permitted within the Canyon Ave. Subdistrict of the Downtown District. Pursuant to
Section 4.12 (B)(2)(A) and (C) these uses are subject to Administrative Type 1 review.
The lot dimensions are 75 feet by 130 feet, the minimum lot width is 40 feet. There is no
minimum lot size in the Canyon Ave. Subdistrict. The maximum lot coverage is 75%, the
proposed building will cover 21 % of the gross lot area (45% of the net lot area). The
maximum front yard setback is 15 feet, the proposed setback is 0 to 3 feet. The rear yard
setback is 5 to 51 feet which exceeds the required 0 foot setback. The evidence is that the
3
SUMMARY OF RECOMMENDATION AND DECISION:
Approval
Approval with conditions
Canyon Avenue Subdistrict of the
Downtown District
The city planner testified that the
property was posted, legal notice
published and written notices mailed
as required by the code.
PUBLIC HEARING
The Hearing Officer, by appointment of the Director pursuant to The Fort Collins Land
Use Code, opened the hearing on November 30, 1998 at approximately 6:30 p.m. in the
conference room located at 281 N. College Ave. Fort Collins CO. The staff report and
recommendation and the applicant's submittals were entered into the record.
HEARING TESTIMONY, WRITTEN COMMENTS AND OTHER EVIDENCE
The following individuals testified at the hearing:
From the City:
Mike Ludwig, Project Planner
Fort Collins, CO
For the Applicant:
Linda Ripley
V-F Ripley Associates
113 Stoney Hill Drive
Fort Collins, CO 80525
Joe Frye, Architect
113 Stoney Hill Dr.
Fort Collins, CO 80525
Gregory Belcher
402 West Mountain Ave.
Fort Collins, Co 80525
2
I
ITEM NO.
MEETING DATE
STAFF
City of Fort Collins HEARING OFFICER
STAFF REPORT
HEARING OFFICER: Steven Klausing, Hearing Officer
Hearing Officer, Administrative Type 1
PROJECT NAME: 401 West Mountain
Project Development Plan
CASE NUMBER. #29-98
OWNER: Gregory Belcher
402 West Mountain Ave.
Fort Collins, CO 80521
APPLICANT Linda Ripley
V-F Ripley Associates
113 Stoney Hill Dr.
Fort Collins, CO 80525
PROJECT DESCRIPTION, This is a request for approval of a Project
Development Plan to construct a 14,494
square foot mixed use building (excluding a
3,476 square foot basement). The building
will consist of a 4,555 square foot first floor
for a proposed restaurant use, 4606 square
feet on the second floor as a proposed office
use and 5,333 square feet on the third floor
for two residential units and finally a loft area
of 770 square feet. The site is approximately
.47 acres and is located at the southwest
corner of Mountain Avenue and S. Meldrum
Street. The site is located in the Canyon
Avenue Subdistrict of the Downtown
District,
COMMUNITY PLANNING AND ENVIRONMENTAL SERVICES 281 N. College Ave. P.O. Box 580 Fort Collins, CO 80522-0580 (970) 221-6750
PLANNING DEPARTMENT