Loading...
HomeMy WebLinkAboutCIVIC CENTER PARKING STRUCTURE - PDP - 35-98 - SUBMITTAL DOCUMENTS - ROUND 1 - DRAINAGE REPORTFinal Drainage Report Civic Center Parking Structure NOLTE and ASSOCIATES, Inc. Engineers / Planners / Surveyors REFERENCES A. City of Fort Collins Storm Drainage Design Criteria and Construction Standards, City of Fort Collins Stormwater Utility, May 1984. B. Urban Storm Drainage Criteria Manual, Wright -McLaughlin Engineers, Inc., Denver Regional Council of Governments, Denver 1969. C. Old Town Drainage Basin Plan, City of Fort Collins, Resource Consultants and Engineers, Inc, January 1993. D. HEC-2 Commuter Program - Water Surface Profiles, U.S. Army Corp of Engineers Hydraulic Engineering Center, Davis, California, 1990. NOLTE and ASSOCIATES. Inc 10 N:\FC0053\civil\PKGStrDrainReport.doc OIL Final Drainage Report Civic Center Parking Structure NOLTE and ASSOCIATES, Inc. Engineers / Planners / Surveyors 5.2 DRAINAGE CONCEPT The drainage system is designed to control storm water discharges , protect surface water quality, and to safely convey runoff from the site in compliance with local regulations and consistent with current studies of the major drainageway basin. Nnl.TE and ASSOCIATES. Tnc. 9 N\FC0053\civil\PKGStrDrainRep66. 6i ' :u 1 WE r 'I Final Drainage Report F*4 -A- Civic Center Parking Structure NOLTE and ASSOCIATES, Inc. Engineers / Planners / Surveyors The HEC2 model was run with the area occupied by the parking structure blocked out. This area represents are small portion of the total conveyance available in the cross-section. The result is that the parking structure will have no impact on the Old Town floodplain. Output from of the analysis is summarized in Table 1. In reviewing the HEC2 model and floodplain limits developed in the Master Plan, it is apparent that this site is included in the floodplain because of a backwater condition. No part of the site except for approximately 20 feet adjacent to Laporte Avenue was modeled as providing conveyance for any flood discharges from the Old Town Basin. The site is still subject to flooding, however, and first floor elevations for the commercial space and parking structure have been set 1.5 feet above the 100-year flood elevation in Mason Street. 4.4 EROSION CONTROL AND WATER QUALITY Erosion control during construction of this project will consist of silt fence installed around the perimeter of the site. Once foundations are in place and floor slabs constructed, the potential for erosion will be minimized. The Grading and Erosion Control Plan in the construction drawings indicates the type and timing of proposed measures. Water quality of stormwater discharge from the site in the long-term will be controlled by a "Storm Ceptor" Manhole (Type 2400) to be installed within the site at the alley. The Storm Ceptor has been shown to be effective in the removal of sediment, oil and grease, and other pollutants of stormwater. 5.0 CONCLUSIONS/SUMMARY 5.1 COMPLIANCE WITH STANDARDS The proposed storm drainage design for the site complies with the intent of the following regulations, standards, and reports: ♦ City of Fort Collins Storm Drainage Design and Technical Criteria ♦ Old Town Master Drainage Plan for the City of Fort Collins, by Resource Consultants and Engineers, dated January 1993. N(nTTFanriACQ(1('TATRC Tnr. 9 NAFf'M15?\civil\PKGStrDrainRenort.doc MIT r ti W U) 00 1` W ti n W N Co r W N TABLE 1 PROFILE TABLE ucr_coc Pimn Imnnrteri P12 River Rn/FR-1 Reach: Reach-1 Ar11- - Reach ,rarer 4980.40 4980.72 4980.54 4980.75 0.000532 0.80 69.60 98.92. 108.73 233, 240,91 24322 851 R0341 04� 0.4� a 90.00 _ 160.00 4980.40 4980.84 4980.68 4980.89 0.000611 1.24 Reach-1 - 288000 200.00 4980.40 4980.88 4980.73 4980.94 0.000720 1.47 R each-1 2 - 300.00 4980.40 4980.95 4980.82 4981.04 0.001034 2.00 126.09 247.27 6 Reach-1 2800 370.00 4980.401 4981.02 4980.88 4981.13 0.001078 2.26 142.39 250.00 _ 0-58 2 �Reach-1 ch, 1 ch-1 1 reach--- 3170 3 3170 3170 170.00 240.00 370.00 4980.90 4980.90 4980.90'i 4981 95 4982.08 4982.26' 4981.95 4982.08 4982.26 4982.114 4982.27 4982.44 0.002095 0.001901 0.0018241 3.49 3.77 4.27 51 77' 75.24 121.05: 158 5.5; 5 214.941 309.51 0. p.83 0.811 0.83. ---+ each--1 --- I _70 31 _ � I 500.001 4980.90 4982.35 1 4982.35 4982.571 0.001886 4.63 149.73 341.52 0.85 ___-- Re h-1 13320_ 90.00 4982.001 4982.27 4982.32 0.002542 i 2.23 49.59' 310.04 0.801 Reach-1 each-1 13320 3320 _ i 170.00 240.00 4982.00 4982.00, 4982.38 4982.46 4982.44 4982.53, 0.001787' 0.001407 2.41I 2.48 88.621 125.29' 385.01 464.39 0.72' 0.66 each-1 13320 1 370.00 4982.00 4982.591 4982.66 0.001100 1 2.59 ; 191.72 ; 590.24 0.61 . - �each-1 � 13320 500.00 ; ' 4982.00, 4982.70 ; �1 4982.76 0.000855; 2.56 256.48 631.92 0.55 Reach-1 13580 I 90.00 4981.40 4982.51 4982.34 4982.5211 0.000343 i _ 1.12 j 114.78 , 434.79 0.32 Reach-1 )3586 170.00; 4981.40., 4982.631 4982.40 4982.66 0.0004461 1.511 159.26; 449.32 0.37' Reach-l- 3580 240.00; 4981.40 4982.71 4982.46 4982.74' 0.000520 1.79' 189.19� 457.23 0.41 Reach 1 - 35� 370.00 4981.40 ! 4982.83 4982.55'1 4982.87 0.000648: 2.25 232.94 � 468.52 0.48 Reach-1 �3580 500.001 4981.40 4982.911 4982.62 4982.981 0.000785, 2.671 266.141 476.87. 0.53! BEFORE PRO.1F[_T sla- 90.00 4980.401 4980.72 4980.54 4-980 75 0.000532' 0.80 69.60'' 233.85 i 0.34 : WW A 2800 eaci,t _ 160.00, 4980.401 4980.84 4980.68 4980:89 0.000611 1.241 98.92 240.91 0.41 'Reach-1 280 ;; j 200.00, 4980.40i 4980.88 4980.73 4980.94 0.000720 1.47 108,73 243.22 0.45 Reach-1 2800 � 300.00 4980.40! 4980.95, 4980.82 4981.04 0.001034 2.00 126.09 247.27 0.56 Reach-1 2800 _ 370.00 4980.401 4981.02 4980.88 4981.13 0.001078! 2.26 142.39 _250.00 Q Reach 1 3170 90.00 4980.901 4981.68 4981.68 4981. 3057' 3.55 25.98 0.92 each-1 _ 3170 170.00 4980.90 4981.94 4981.94 4982.14 0.002216,' 3.03 -- - 50.33 53.1 164.36 0.85 each-1 13170 240.00 4980.90: 4982.08 4982081 4982.27, 0.001949 3.84, 77.05 217.69 0-83 each-1 ---- 3170 370.001 4980.90 4982.25 4982.25 498244 ' . `04, .001999 4.44 120.84 306.3 0.86 'Reach-1 ..- 13170 500.00 4980.90' 4982.42 4982.42'1 4982.55 0.001497, 3.45' 180.66 384.63 0.73 _... _ Reach-1 3320 90.00 4982.00!4982.27 4982.32 0.002542 1 0.001735 2.23 _ 2.39 49.59 - 89.56 310.04 386.64 0.80 0.71 each3320 170.00 - 4982.00 4982.38' 4982.44 each-1 3320 240.00 4982.00, 4982.46 4982.531 0.001414 2.48 125.07 463.90 0.66 each-1 13320 370.00 4982.00! 4982.60 4982.66I 0.001046, _ 2.55 195.49 596.59 0.59 eacheach=l �3320 500.00. 4982.00.; 4982.67 4982.751 0.001039; 0.000269 2.75 0.96 240.24 128.55 623.29 429.63 0.60 0.28 Reach-1 3580 90.00: 4981.40 4982.49 4982.30I 4982.50 Reach-1 �3580 170.00: 4981.40'1 4982.60 4982.38 4982.621 0.0003401 126 179.77 446.29 0.32 Reach-1 43580 240.001 4981.401 4982.68 4982.41 4982.71 0.000381, 1. _ 215.82 454.30 0.35 Reach-1 3580 370.00i 4981.40 4982.80 4982.501 4982.83 0.000454 268.84 465.83 0.40 - �� Fran rani ea�� wni wcno no AQR2 A71 4982.941 0-0005291 310.40 474.67" 0.44; mom >.••W Fort Collins Old Town Existing River = RIVER-1 Reach = Reach-1 Section 78 IRS = 3320 .013- .013 - .013 Legend WS 500-Year WS 100-Year WS 25-Year 4987 WS 10-Year WS 5-Year Ground • Bank Sta 4986 4985 c 0 9 m W 4984 4983 MASON STREET PROFILE 4982; 0 200 400 600 800 Station (ft) 5 -11 A6" k!J I in Horiz. = 100 ft 1 in Vert. = 1 ft Fir1IRF No Text ' , Final Drainage Report ■ Civic Center Parking Structure NOLTE and ASSOCIATES, Inc. Engineers / Planners / Surveyors 1 4.0 DRAINAGE FACILITY DESIGN 4.1 GENERAL CONCEPT Runoff from the site will be collected on the top level of the parking structure at inlets and floor ' drains which are connected with the floor drains on lower levels. The structure drains will be connected to single outlet pipe on the east side of the building (Design Point 1 on the Drainage ' Exhibit). At this location, runoff will be routed through a Storm Ceptor manhole for water quality purposes before being discharged into the existing storm sewer system in the alley. 1 4.2 BASIN DESCRIPTION For the purpose of calculating runoff, the entire site is considered completely impervious. The site is comprised of a single basin, identified by the letter A, as shown on the Drainage Exhibit. Potential off -site discharges from the west will be conveyed in Laporte Avenue on the north side of the property. No off -site flows will be conveyed through the site. No analysis has been performed for landscaping which will occur within the right-of-way of Laporte Avenue and Mason Street. Basin A consists of the parking structure and commercial space within the boundary of the property. Discharges from the site into the storm sewer inlet will be conveyed by a 15" RCP. This storm sewer is designed for the minor event. Major event flows will be partially intercepted by the storm sewer, and the remainder will surcharge the inlet and discharge directly into the alley. 4.3 IMPACTS TO THE FLOODPLAIN The Old Town floodplain was delineated in the Master Plan using the HEC2 computer program (Reference D). Input and output files are listed in the Technical Addendum, Volume I, to the Master Plan. The HEC2 input file for Reach 6 was copied and run as part of this analysis to duplicate the results of the Master Plan, and to determine the affect this project will have on 1' existing flood elevations. The HEC2 input and output files from the Master Plan are included in the Appendix to this report. Two hydraulic cross -sections, numbered 77 and 78, define the flood elevations at this site. These cross -sections are illustrated in Figures 2 and 3 on the following pages. The parking structure will occupy a small area adjacent to Laporte Avenue in cross-section 77, but will not affect r section 78. The location of the parking structure is indicated in cross-section 77, Figure 2. NOLTE and ASSOCIATES, Inc. 4 N:\FC0053\civil\PKGStrDrainReportdoc .. ■, Final Drainage Report Civic Center Parking Structure NOLTE and ASSOCIATES, Inc. Engineers / Planners / Surveyors 1.0 GENERAL LOCATION AND DESCRIPTION 1.1 LOCATION The proposed civic center parking structure and commercial facility is located on the northwest quadrant of Block 21 in downtown Fort Collins. It is located in the northeast '/< of Section 11, Township 7 North South, Range 69 West of the Sixth Principal Meridian, see Figure 1, Vicinity Map. To the south of the site is a single story commercial building; to the north across Laporte Avenue is Washington's bar, the Old Fort Collins Freight Depot and new Temporary Parking; to the east is more commercial buildings with store fronts on College Avenue; and to the west across Mason Street is the proposed Larimer County Justice Center. Within the alley right-of-way on the east, storm sewer lines are existing which discharge through downtown Fort Collins to the Poudre River. 1.2 DESCRIPTION OF PROPERTY The parking structure lot is approximately 1.75 acres in area and is currently paved and used for surface parking. The ground slopes downward from the west to east at approximately 1.0 percent. The overall change in grade across the lot is just over two feet, from a maximum elevation of 4982.4 to a minimum of 4980. The proposed development will include a single three-story building for parking, with a single story building for commercial uses along Mason Street. There are no landscape areas proposed, so the site will be virtually impervious. 1.3 PREVIOUS REPORT AND STUDIES The site is in the drainageway known as Old Town Basin. The flood prone areas were delineated in a master planning study, and are documented in a report entitled, Old Town Master Drainage Basin Plan, City of Fort Collins, (Master Plan) prepared by Resource Consultants and Engineers, Inc., dated January 1993 (Reference Q. This report includes a hydrologic model, evaluation of the downtown area storm sewer system, delineation of the floodplain, and recommendations for future improvements to alleviate flooding problems. The Civic Center Parking Structure is adjacent to Reach 6 of the Old Town Basin drainageway. The Master Plan calls for a future diversion channel to be constructed upstream (west) of Mason Street which will significantly reduce flooding problems in the vicinity of the Civic Center Parking Structure. ' NOLTE and ASSOCIATES. Inc. l Final Drainage Report �- Civic Center Parking Structure NOLTE and ASSOCIATES, Inc. ' Engineers I Planners / Surveyors 2.0 DRAINAGE BASINS AND SUB -BASINS 2.1 MAJOR BASIN DESCRIPTION The proposed development lies within the Old Town Drainage Basin. The Basin is located in the ' central part of Fort Collins and is almost completely developed. There is no major drainage channel, and runoff is carried within a network of storm sewers and street sections to the Poudre ' River. The Basin is also subject to discharges resulting from irrigation surcharge flows occurring in the basin upstream of Shields Street. Although this project is within the Old Town Basin floodplain, the proposed structures are above the 100-year flood elevations. 2.2 SUB -BASIN DEVELOPMENT As shown on the Drainage Exhibit at the back of this report, the site historically drained overland to the east to an existing storm sewer in the alley, and north to an existing storm sewer in Laporte ' Avenue. The site has accepted sheet flows from the offsite area to thewest which may infrequently overtop Mason Street. Upon development, the site will drain to the storm sewer ' system in the alley on the east. 3.0 DRAINAGE DESIGN CRITERIA 3.1 CRITERIA This drainage report was prepared in accordance with the City of Fort.Collins' Storm Drainage ' Design Criteria and Construction Standards Manual (Reference A). The design rainfall data used to calculate runoff for the site was obtained from the Time -Intensity -Frequency curves contained within the City's Criteria Manual. 1 The site drainage plan was prepared with consideration given to the Master Plan for Old Town Basin prepared by Resource Consultants, Inc. There are no specific site constraints that will adversely impact the drainage. 3.2 RUNOFF CALCULATIONS The Rational Method has been used to calculate peak runoff from the 10-year and 100-year recurrence interval storms. Storm water detention is not provided, but discharges from the site will not be increased over the "existing" conditions because the site was completely paved before this project. Peak flow calculations are listed in the Appendix and summarized on the Drainage Exhibit. 1 TT(lT TF, anrT 4SS(lf TATES. Tnc. 3 N:\FC0053\civil\PKGStrDramReporydec; ° G,avel. ','\.< _ : III• I� i� .I, ♦ \�,` — i j Pits 4 _ .'��L-o. Trailer •96 .. r._ J ... �� Parks r I I ` \�.,. I �f L`. [ li ■ I� Substa �a—. I - uc rn ✓Dsy 11H1 F9N'I L• •��I`t9�) I h'7 rill ■„ . P� e.. li 1 r S00p '41 i1 i1. :'`IMES I. , — D/TCH II RIn EA '59II Vll`IIE I'. IIIDRYVEL� :.'�� r 1 • �'.-- -.' •;II 5122 soil I I : Id -_ =r• � � I /� •I. 6 � .. lUgzr. R�. n¢ ILL 990 \ r Wpdio ruwe,s I ---' I .H Fa Ily�l \ I. Buckin am L P\ �49851 `%/ ��'•. Parki .r • ' i I�11�JV443 / r 1 W 11 \ i \�,�<14 •�'c,�� , c�7i •� �a J`�mrourJlaN��m Cemj.�lII I.• Orandw \ l �� G4 r wash( gto .� � o, soo //��f r� I L•.� _ � 1 � __ _ EI N \ ^jY i ScA I�� 7IJ�SLb— P _ .Munlclpal ' J ❑' —J �— I'4 -- T ..` • . \Aliwst �Golf -Course tl• `'' Sheldo �JI{r� 5069 .1_: LAIC¢ ' I LBEI it Q oN� :ea.r III •vJ�'_- 1i4._.. 14�1 _ h .. ._ JI I 'v ORADO-ST, ==r� •I , O B � I L — .'UNIVE SIT 4 ■'I — arrl 17I ~� ly-:i.--—I '1 ,=f Sli jEJ L Igo li ° :Lei L r : F j 3 ❑ _ �� %ytvF ,' � _I , I .��1::- _r - ._ _ -y C� .` _I_._ _• �IHlgh Sch � '� -�. . I .... N■'nil `w III 287 'Parl�l1 I _j I❑�� CIS 555056/ 502Y l 6� •• °off- _ l�l' � l -- -�•. t~t I t 1� � FIGURE 1 VICINI TY MAP t Z _ S nti63G a;r„5 Final Drainage Report °r,£ Civic Center Parking Structure NOLTE and ASSOCIATES, Inc. Engineers / Planners / Surveyors CERTIFICATION I hereby affirm that this report for the final drainage design of the Civic Center Parking Structure was prepared under my direct supervision in accordance with the provisions of the City of Fort Collins Storm Drainage Design Criteria for the owners thereof. I understand that the City of Fort Collins does not and will not assume liability for drainage facilities designed by others. JOHN S. GRIFFITH, Professional Engineer State of Colorado No. 16030 I ■k NOLTE and ASSOCIATES, Inc. Engineers / Planners / Surveyors Final Drainage Report Civic Center Parking Structure TABLE OF CONTENTS PAGE CERTIFICATION........................................................................................................... ii 1.0. GENERAL LOCATION AND DESCRIPTION..............................................................1 1.1 Location................................................................................................................1 1.2 Description of Property ..............................................................................::::.......1 1.3 Previous Report and Studies.................................................................................1 FIGURE1 - VICINITY MAP..........................................................................................2 2.0 DRAINAGE BASINS AND SUB-BASINS....................................................................3 2.1 Major Basin Description.......................................................................................3 2.2 Sub -Basin Development ................................................. ...................................... 3 3.0 DRAINAGE DESIGN CRITERIA...................................................................................3 3.1 Criteria..................................................................................................................3 3.2 Runoff Calculations..............................................................................................3 4.0 DRAINAGE FACILITY DESIGN...................................................................................4 4.1 General Concept....................................................................................................4 4.2 Basin Descriptions................................................................................................4 4.3 Impacts to the Floodplain......................................................................................4 4.4 Erosion Control and Water Quality ......................................................................8 5.0 CONCLUSIONS/SUMMARY.........................................................................................8 5.1 Compliance with Standards..................................................................................8 5.2 Drainage Concept..................................................................................................9 REFERENCES...............................................................................................................10 APPENDIX DRAINAGE EXHIBIT j S F CIVIC CENTER PARKING STRUCTURE FINAL DRAINAGE REPORT for Parsons and Associates 432 Link Lane Plaza Fort Collins, Colorado 80524 (970) 221-2400 705 Nolte and Associates, Inc. 7000 S. Yosemite Street, Suite 200 Englewood, Colorado 80112 (303) 220-1001 July 1998