Loading...
HomeMy WebLinkAboutCIVIC CENTER PARKING STRUCTURE - PDP - 35-98 - CORRESPONDENCE - (8):� 10/20/98 14:57 Fentress Bradburn Brian Chaffee -),Steve Olt 3/3 3. The re -submittal of the PDP was also discussed. It was agreed the PDP FBA, CityScapes, re -submittal will be on October 27, 1998. This will give Steve his Parsons preferred 3 weeks review time and still allow time for staff to place it on the December 17 P&Z Hearing agenda. 4. Steve added that should the team decide to proceed with a Request for Walker, FBA Modification of the Standards for the parking stall and aisle size modification as we discussed at the meeting, the material to be provided for the P&Z Board (by November 25) should also include: 1. Ten (10) copies of the Stripping Drawing 2. Ten copies of whatever other narrative and supporting documentation the team wishes to submit in support of the request. Brian Chaffee SIGNED 9938 REPORT OF CONTACT Page 2 of 2 19 OCT 98 4� 10/20/98 14:57 Fentress Bradburn Brian Chaffee -►Steve Olt 2/3 REPORT OF CONTACT PROJECT: SUBJECT: DATE: CONVERSATION WITH: 10*3:01 FENTRESSBRADBURN ARCHITECTS, LTD. ARCHITECTURE. INTERIORS, PLANNING 421 BROADWAY PHONE: (303) 722-5000 DENVER. COLORADO 80203 FAX: (303) 722-5080 E-MAIL ADDRESS: studio@fentressbradbtan.com WORLD WIDE WEB www.fentressbradbum corn Civic Center Parking Structure PROJECT NO: PDP & P&Z Hearing submittal dates and requirements 19 OCT 98 FROM: Steve Olt, Planning Brian Chaffee, FBA Alexa Taylor, FBA CC: Allan Bliesmer Jack Gianola Kimberly Straw Rob VanUffelen Don Monahan Alesa Taylor HPCC City of Fort Collins CityScapes Parsons Walker Parking FBA 1. Steve confirmed the December P&Z Hearing date is December 17, 1998. 2. In order to meet this date the following presentation material must be submitted no later than November 30. (The design team shall, however submit this information on November 25): Ten (10) full size sets of the following: 1. Site Plan 2. Landscape Plan 3. Building Elevations One (1) 8 %: a 11 PMTS (or legible small plots) of the following: 1. Site Plan 2. Landscape Plan 3. Building Elevations Additionally, one (1) set of full size color renderings are needed of the following so that they may be made into slides by the City. Steve thought these are needed at the beginning of the week before the P&Z Hearing on December 14 (Steve will confirm). 1. Site and/or landscape plan 2. Building elevations Brian Chaffee SIGNED 9838 ACTION BY: Information Information 9838 REPORT OF CONTACT Page 1 of 2 19 OCT 98