Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
CIVIC CENTER PARKING STRUCTURE - PDP - 35-98 - SUBMITTAL DOCUMENTS - ROUND 3 - ROUTING SHEET
Project: �Y35—gr��i�r�r�,e ��i1iNG s,�ec Planner: Traffic Operations: Engineer. Date: � 7 Items Requested Site I [and Plat I Utility Drainage Rpt Other Items Required Engineering ©lckeuLA fku, Redlined Items Being Returned Site land I Plat Utility Drainage R t Other Items Being Returned Stormwater Water/Wastewa Traffic Operations X 6 � U Trans. Planning Transfort Natural Resources Park Planning totals � z � a a m Other: Me: NI redlined items should be returned with the resubmittal/ revisions. Revisions Routin , Sheet 9 et- Item: [# *--2 - ,1 Date: _ 'i f 24 FILE: PROJECT PLANNER ENGINEERING: PAVEMENT ZONING BUILDING INSPECTION LIGHT & POWER MAPPING / DRAFTING FORESTRY FCLWD/ELCOB OXELDER FIRE POLICE ADVANCE PLANNING STREETS R.O.W. PLANNING WATER CONSERVATION POST OFFICE US WEST PUBLIC SERVICE SCHOOLS: POUDRE / THOMPSON CABLE TV STATE HIGHWAY DEPARTMENT DITCH COMPANY RAILROAD: UP or BN/CS REA/DOE/PRPA X '04 TOTAL