HomeMy WebLinkAboutPROSPECT INDUSTRIAL PARK, MIDPOINT SELF-STORAGE - PDP - 28-98D - CORRESPONDENCE - REVISIONS (3)Please note that the comments from the July 16th meeting with the City Staff
have been incorporated within this re -submittal. Revisions to the appropriate
documents have been completed.
If you have any questions regarding our responses and re -submittal, please feel
free contact me directly at 303.287.5525.
4rry
,
l
Sherman, Architect
sident of Design
dcb construction co. inc.
& J'- J aA-�—
Micheal Oberlander, PE
Project Manager
North Star Design
Darren th en
Project Manager
dcb construction co. inc
W!
between storm and sanitary lines.
20
20' easement has been provided. Process has been started with Natural
Resources for the easement.
25.
Noted.
24
Spots have been added.
23
Inlet protection has been called out on the erosion control plan.
22
The ground around the power poles in question will not be subject to cut. The
area around the north pole will remain at existing grade; approximately 1' of
fill will be placed around the south pole. The easement in question is not an
exclusive easement. The power poles are in a Drainage and Utility
Easement. DCB is presently working with the electric company to coordinate
grading around the poles.
26
A table has been provided.
Transfort - Garold Smith
7
Noted.
Transportation Planning — Tom Reiff
8
A Striping Plan has been added to Sheet C13.
9
ROW has been noted on all plans.
10
The corrections have been made accordingly.
Water Wastewater — Roger Buffington
18
Fire hydrants have been updated.
19
Coordination has taken place with JR Engineering. A preliminary crossing
has been included on our plans.
Water Wastewater -Jeff Hill
12
Note has been added to the Landscape Plan.
13
Note has been included.
14
Water line has been upsized to 12" and profile added to Sharp Point Drive
centerline profile.
15
Swivel tee has been noted. 10' separation has been maintained.
16
Steel casing has been added.
17
10' separation has been maintained.
Zoning — Peter Barnes
3
A wavier request similar to phase I has been attached and submitted to the
Director of Planning
4
Refer to revised site plan with added information and site statistics.
5
Refer to PDP-2 for added fence details.
6
Refer to the site plan for the exact drive isle widths. The fire access lanes are
25'-0" as required.
-3-
Engineering - Drainage Outfall, General, Landscape, Plat
Engineering — Sheri wamhoff
39
Storm_1A_is_being built_now.
40
Easement process has been initiated with Natural Resources.
38
Two benchmarks have been provided.
41
A pan will be constructed across the width of the intersection; a riprap pad
has been added.
42
Spots have been added (see Grading Plan) and label has been updated.
43
So noted.
44
Mill and overlay hatch and note has been added to plans.
45
Spot elevations added to Grading Plan.
46
Curb & gutter and 2' pan will be built from existing end of curb to the 10'
cross pan.
47
Future ramp has been added.
48
A variance has been requested for the cross pan.
49
Utilities will still have access to the existing road.
50
We have had correspondence with JR Engineering and they will tie into our
design at the tracks.
51
JR Engineering does not have grades for flowline and only preliminary
centerline grades. It does not appear they have ground topo, as the elevation
of the tracks is different from ours. Also see response 50.
52
The title has been revised as requested.
53
Refer to site plan for location and notes on sidewalk sizes.
54
Refer to site plan for added notes regarding the emergency access lane.
55
Comment noted. Refer to revised plan.
31
See revised.
32
See revised.
33
See Revised.
34
See revised.
35
See revised.
36
See revised.
37
See revised.
Light and Power — Doug Martine
1
Comment noted. Coordination with Light and Power has occurred.
2
There is an electric vault and a FO vault at the intersection. Both will need to
be relocated.
Police — Joseph Gerdom
11
Noted.
Stormwater Utility — Basil Harridan
21
The permanent outfall will be built now. There is now 1.5' of separation
-2-
4c% construction company, inc.
909 EAST SIXTY-SECOND AVENUE • DENVER, COLORADO 80216 • (303) 287-5525
September 3, 2003
Steve Olt, City Planner
Planning Department
City of Fort Collins
281 North College Avenue
Fort Collins, Colorado 80522
Re: Prospect Industrial Park
Midpoint Self Storage — Phase II
Lot 33 - Type ( LUC #28-98D)
Dear Mr. Steve Olt:
Upon receipt and review of your comments provided to us via fax on July 30,
2003, we offer the following response. We have addressed these comments
from the various departments and offer the following response:
Current Planning -Building, General, Landscape, Site
Current Planning — Steve Olt
30
Standards have not been sent to us of this date.
62
Elevation references have been corrected on plans.
63
The two short wall sections have been changed to masonry as requested.
64
The Fire Lane has been identified on the plan accordingly.
29
So noted.
57
A wavier request similar to phase I has been attached and submitted to the
Director of Planning
65
The landscape plan has been revised to conform with the % of trees species.
56
The site plan has been enhanced accordingly with additional information.
58
Refer to added statistic chart on sheet PDP — 2 for leasable area.
59
Refer to added fence details on sheet PDP-2 and site plan for fence
locations.
60
The sewer easement across the site has been identified.
61
Refer to revised site plan for added information as requested.
27
(a) comment noted. Coordination is ongoing with Xcel. There appears to be
no issues due to the fact that the site is being filled.
(b) Comment noted. Coordination is ongoing with Xcel.
(c) Comment noted and added to Landscape Plan.
construction proiessionols since 1964