Loading...
HomeMy WebLinkAboutPROSPECT INDUSTRIAL PARK, LOT 32, MIDPOINT SELF-STORAGE - PDP - 28-98B - SUBMITTAL DOCUMENTS - ROUND 1 - DRAINAGE REPORT�7f! 'Tv t 4 " 14' oil& ry� Itet..-, 'IJ WMA 441ire 4W kV MIT urma MAI m ITIN K.1oks W A �41 1 Ilk IV La MHLBERRY j PROS ECT STREET 9 N it O cr < w ZIr Z II m " SITE DRAKE ROAD RNER a % / � •. S V�KE / KE .': i 0 i I � •' VICINITY MAP N.T.S. APPENDIX A MAPS AND FIGURES 7. REFERENCES 1. City of Fort Collins, "Storm Drainage Design Criteria and Construction Standards" (SDDCCS), May 1984. 2. "Final Drainage Report for Lot 15, Prospect Industrial Park", March 15, 1999, Stewart & Associates. 3. "Final Drainage Report for Lots 28 & 29, Prospect Industrial Park", June 23, 1988, Stewart & Associates. 4. "Prospect East Industrial Overall Drainage Plan", June 1978, Stewart & Associates. 5. Soil Survey of Larimer County Area, Colorado. United States Department of Agriculture Soil Conservation Service and Forest Service, 1980. 6. Urban Drainage and Flood Control District, "Urban Storm Drainage Criteria - Manual", Volumes 1 and 2, dated March 1969, and Volume 3, dated September 1992. Preliminary Drainage and Erosion Control Report Page 10 Midpoint Self -Storage Solutions October 25, 2000 I improvement plans, with base material consisting of 6" coarse aggregate. The contractor will be responsible for clearing mud tracked onto city streets on a daily basis. 0 5.4 Maintenance All temporary and permanent erosion and sediment control practices must be maintained and repaired as needed to assure continued performance of their intended function. Straw bale dikes or silt fences will require periodic replacement. Sediment traps (behind straw bale barriers) shall be cleaned when accumulated sediments equal approximately one-half of trap storage capacity. Maintenance is the responsibility of the developer. 5.5 Permanent Stabilization ■ A vegetative cover shall be established within one and one-half years on disturbed areas and soil `stockpiles not otherwise permanently stabilized. Vegetation shall not be considered established until a ground cover is achieved which is demonstrated to be mature enough to control soil erosion to the satisfaction of the City Inspector and to survive severe weather conditions. t I+ Ci n Preliminary Drainage and Erosion Control Report Page 9 Midpoint Self -Storage Solutions October 25, 2000 FJ project will carry the peak flows of Lot 33 when it is developed in the future. The pipe design for the future development is included in Appendix D of this report. 5. EROSION CONTROL 5.1 Erosion and Sediment Control Measures Erosion and sedimentation will be controlled on -site by use of inlet filters, silt fences, straw bale barriers, gravel construction entrances, and seeding and mulch. The measures are designed to limit the overall sediment yield increase due to construction as required by the City of Fort Collins. During overlot and final grading the soil will be roughened and furrowed perpendicular to the prevailing winds. Straw bale dikes will be placed along proposed swales. Erosion control effectiveness, rainfall performance calculations and a construction schedule will be provided with the final report. 5.2 Dust Abatement ' During the performance Hof the work required by these specifications or any operations appurtenant thereto, whether on right-of-way provided by the City or elsewhere, the contractor shall fiunish all labor, equipment, materials, and means required. The Contractor shall carry out proper efficient measures wherever and as necessary to reduce dust nuisance, and to prevent dust nuisance that has originated from his operations from damaging crops, orchards, cultivated fields, and dwellings, or causing nuisance to persons. The Contractor will be held liable for any damage resulting from dust originating from his operations under Ithese specifications on right-of-way or elsewhere. 5.3 Tracking Mud on City Streets It is unlawful to track or cause to be tracked mud or other debris onto city streets or rights -of - way unless so approved by the Director of Engineering in writing. Wherever construction vehicles access routes or intersect paved public roads, provisions must be made to minimize the transport of sediment (mud) by runoff or vehicles tracking onto the paved surface. Stabilized construction entrances are required per the detail shown on Sheet 7 of the Preliminary Drainage and Erosion Control Report Page S Midpoint Self -Storage Solutions October 25, 2000 4. HYDRAULIC ANALYSIS 4.1 Allowable Street Capacity The theoretical street and gutter capacity was calculated using Manning's equation for open channel flow. Allowable gutter flows and maximum street capacities for both the initial and major storms were estimated and evaluated based on the specifications set forth in the SDDCCS Manual. At the Northeasterly comer of Lot 32 the 2-year peak runoff rate is 11.7 cfs, which is greater than the capacity of the gutters (9.2 cfs). The peak 100-year runoff rate is 51.4 cfs, which is less than the capacity of the street cross section, 72.64 cfs, at 6 inches over crown, which is allowable flow depth in the 100-year storm for a collector street. Because the 2-year street capacity is being exceeded in the existing condition, flows to the front of Lot 32 are conveyed in a storm sewer to the existing borrow pond. See the street capacity calculations in Appendix C for more detailed information. 4.2 Storm Sewer System For the storm pipe design, the computer program StormCAD, developed by Haestad Methods, Inc. was used. StormCAD considers whether a storm pipe is under. inlet or outlet control and if the flow is uniform, varied, or pressurized and applies the appropriate equations (Manning's, Kutter's, Hazen -Williams, etc). StormCAD also takes into account tailwater effects and hydraulic losses that are encountered in the storm structures. It calculates the losses through an inlet or manhole by allowing the user to assign a coefficient for the equation, hL = K*(VZ/2g) Where hL = headloss K = headloss coefficient V = average velocity (ft/s) g = gravitational constant (32.2 ft/sZ) The storm pipe design was performed for two different scenarios, the first being the runoff from the site into the borrow pond to the east of Lot 33 and the second being for the ultimate build -out of Lot 33 just east of our site. This was done to ensure that the system for this Preliminary Drainage and Erosion Control Report Page 7 Midpoint Self -Storage Solutions October 25, 2000 0 I i r� I F I 1 1 1 1 I I 1 I Collins (Figure 3.1 of SDDCCS). In order to utilize the Rainfall Intensity Duration Curves, the time of concentration is required. The following equation is used to determine the time of concentration t C = t +tt (2) where t. is the time of concentration in minutes, t; is the initial or overland flow time in minutes, and t is the conveyance travel time in minutes. The initial or overland flow time is calculated with the SDDCCS Manual equation: tt = [1.87(1.1 - CCr)Lo.51/(S)0a3 (3) where L is the length of overland flow in feet (limited to a maximum of 500 feet), S is the average slope of the basin in percent, and C and Cr are as defined previously. - All hydrologic calculations associated with the sub -basins shown on the attached drainage plan are included in Appendix B of this report. A summaryof these calculations for the basins is included in Table 3.1 below. Table 3.1 Drainage Summary Design pbint r hAary SWr6asin Area (ac) c(z), c(10) C(100) tc(2) (rnlN tc(1q (nin) tc(100) (rrin) g2)tot (cfs) g1o)tot (cfs) g10*d (cte) DRAINAGE STFWT ti7E flEM IRKS OS-1 7.55 0.47 0.47 0.58 21.7 21.7 21.7 5.4 9.26 23.7 2 OS-2 8.25 0.35 0.35 0.44 21.6 21.6 21.6 4.5 7.67 19.6 1 101 1.35 0.88 0.8B 1.00 al 6.1 5.0 3.2 S43 13.5 F ndAM 3 102 1.76 0.80 0.80 1.00 7.3 7.3 5.0 3.5 6.03 17.5 FtndBM OS3 17.54 0.30 0.30 0.38 24.4 24.4 24.4 7.6 13.02 33.2 4 1024CS3 19.30 0.35 0.33 0.41 24.4 24.4 24.4 9.2 15.70 40.1 Pm SAde C.epedty 5 103 1.55 0.94 0.94 1.00 11.9 50 5.0 3.0 7.14 15.5 tot 33 daMoped 6 104 0.12 0.74 0.74 0.93 9.8 9.8 5.0 0.2 0.34 1.1 Preliminary Drainage and Erosion Control Report Page 6 Midpoint Self -Storage Solutions October 25, 2000 I Runoff from Subbasin 104 is conveyed via sheet and gutter flow to Midpoint Drive where it will then travel down the gutter of Midpoint Drive to the intersection of Sharp Point Drive where a drainage ditch will carry the flows into the existing borrow pond east of the site. The 2-year historic runoff rate for the front portion of Lot 32 is 0.24 cfs. The 2-year release rate for subbasin 104 is 0.20 cfs. Therefore, the flow releasing onto Midpoint Drive from Lot 32 has decreased. Runoff from Subbasin OS-1 is conveyed via sheet flow and gutter flow and was calculated to determine the capacity of Midpoint Drive. Runoff from Subbasin OS-2 is conveyed via sheet flow and gutter flow to Midpoint Drive, DP 2. The flow at DP 2 was used to check the capacity of Midpoint Drive. Runoff from Subbasin OS-3 is conveyed via sheet flow and gutter flow to the existing trickle pan and Swale which Subbasin 102 will combine with at DP 4. The flow at DP 4 was used to check the capacity of the existing trickle and Swale in the rear of the lot. 3.4 Hydrologic Analysis of the Proposed Drainage Conditions The Rational Method was used to determine both 2-year and 100-year peak runoff values for each sub -basin. Runoff coefficients were assigned using Table 3-2 of the SDDCCS Manual. The Rational Method is given by: Q = CfCIA (1) where Q is the maximum rate of runoff in cfs, A is the total area of the basin in acres, C f is the storm frequency adjustment factor, C is the runoff coefficient, and I is the rainfall intensity in inches per hour for a storm duration equal to the time of concentration. The frequency adjustment factor, Ct, is 1.0 for the initial 2-year storm and 1.25 for the major 100- year storm. The runoff coefficient is dependent on land use or surface characteristics. The rainfall intensity is selected from Rainfall Intensity Duration Curves for the City of Fort I Preliminary Drainage and Erosion Control Report Page 5 Midpoint Self -Storage Solutions October 25, 2000 I (back of lot) will sheet flow to a proposed water quality pond which will release into an existing 1' trickle pan and Swale which has a 100 year capacity of 88.8 cfs as designed by ■ James H. Stewart & Associates in June 1978. The rate of runoff at Design Point 4, the southeasterly corner of Lot 32, is 40.1 cfs, which is less than the trickle pan and Swale capacity of 88.8 cfs. 3.3 Proposed Drainage Plan A qualitative summary of the drainage patterns within each sub -basin and at each design point is provided in the following paragraphs. Discussions of the detailed design of drainage facilities identified in this section are included in the following sections. Runoff from Subbasin 101 will be conveyed via sheet flow and gutter flow to the water quality structure located at Design Point (DP) 1. This storm flow will be conveyed via storm pipe to the existing borrow pond east of the site Runoff from Subbasin 102 will be conveyed via sheet flow and gutter flow to a proposed water quality structure located at.DP 3. Flow will be conveyed from DP 3 via storm pipe and gutter flow to the existing trickle pan and swale in the rear of the lot. Flow will join that from sub -basin OS-3 and discharge into the existing borrow pond to the east of the site. Subbasin 103 encompasses the front of Lot 33, which is owned by the developer of Midpoint Self -Storage Solutions. Subbasin 103 was delineated and a connection to the storm sewer was provided for future development of Lot 33. Runoff from Subbasin 103 in the future will be conveyed via sheet flow and gutter flow to the storm sewer manhole at DP 5. This storm sewer has been sized to carry developed peak flows from subbasin 103. From here, flow will be conveyed via 24" storm sewer pipe to the existing borrow pond east of Lot 33 Preliminary Drainage and Erosion Control Report Page 4 Midpoint Self -Storage Solutions October 25, 2000 I I I I� I 1 iJ 1 I I I I detention. The resultant runoff coefficient for the 17.54 acres of rear lot drainage is C=0.30. The resultant runoff coefficient for the 8.25 acres of front lot drainage is C=0.35. According to the Flood Insurance Rate Map (FIRM) for the area, the site lies out of the 100- YR Floodplain. The site is shown on a portion of the FIRM Map Panel No. 0801020012C in Appendix A. 3. LOCAL DEVELOPED DRAINAGE DESIGN 3.1 Method Since the subbasins are less than 160 acres, the Rational Method was used to determine both the 2-year and 100-year runoff rates for the sub -basins indicated in this drainage report. Drainage facilities were designed to convey the 100-year peak flows. A detailed description of the hydrologic analysis is provided in Section 3.4 and Appendix B of this report. 3.21 General Flow Routing Flows within this site will take the form of overlot, gutter, and pipe flow. The proposed drainage patterns from the Prospect East Industrial Overall Drainage Plan have been maintained as much as possible. Stormwater Detention is not required or provided for Lot 32 because it is in the Poudre River Basin. A storm sewer system will be designed to carry peak 100-yr flows from the front of Lot 32 and proposed Lot 33. This system is being provided because Midpoint Drive does not have capacity to convey the 2-year runoff (see Appendix C).. Water Quality will also be provided. The proposed drainage facilities for this site consist of proposed sump inlets, swales and drainage pipes. The northern portion of the site (front of lot) will sheet flow to a curb cut at the northeast comer of the lot and into a water quality pond. A proposed storm pipe will then carry the storm water from the water quality pond at the southeast corner of the site to an existing borrow pond approximately 350' east of Lot 32. The southern portion of the site Preliminary Drainage and Erosion Control Report Page 3 Midpoint Self -Storage Solutions October 25, 2000 1.4 Design Criteria ■ This report was prepared to meet or exceed the submittal requirements established in the City of Fort Collins' "Storm Drainage Design Criteria and Construction Standards" (SDDCCS), ' dated May 1984. Where applicable, the criteria established in the "Urban Storm Drainage _ Criteria Manual" (UDFCD) dated 1984, developed by the Denver Regional Council of Governments have been utilized. 1.5 Master Drainage Basin Midpoint Self -Storage Solutions lies in the Poudre River Drainage Basin. There is no City of Fort Collins master plan for the Poudre River Drainage Basin and detention is not required for this basin. However, releases from the site must not cause negative impact to downstream drainage facilities and adequate conveyance must be shown from this site to a major drainage outfall. 2. HISTORIC (EXISTING) DRAINAGE ' The historic (existing) flows for Lot 32 consist of the flows from the site and some offsite flows from the northwest. The drainage pattern for the property is via overland flow in a southeasterly and northeasterly direction at approximately 1 percent slope. The -site has a very good ground cover of native grasses and weeds. An existing 1' trickle pan conveys flows from the back of Lots 24-32 to an existing borrow pond. This trickle pan was designed by James H. Stewart & Associates and approved in June 1978. Lots 24-31 are upgradient from Midpoint Self -Storage Solutions (Lot 32). The capacity of the existing trickle pan & Swale, at Lot 32, for the 100-yr event is 88.8 cfs as calculated by Stewart & Associates. The front drainage of lots 24-31 are directed to release into Midpoint Drive which in turn discharges into the same existing borrow pond via a drainage ditch on the south end of the Midpoint Drive and Sharp Point Drive intersection. Presently, Lot 32 has 7 lots upstream contributing to these calculations. Of these 7 lots, one is presently being developed, two remain undeveloped, three have existing development which have provided on -site detention, and two existing developments have provided no Preliminary Drainage and Erosion Control Report Page 2 Midpoint Self -Storage Solutions October 25, 2000 1. INTRODUCTION 1.1 Project Description Midpoint Self -Storage Solutions is a proposed storage facility located on Lot 32 in Prospect Industrial Park. The site is located in the Poudre River Drainage Basin and contains approximately 3.23 Acres. The site is zoned I-G, General Industrial. The proposed site is located at the southwest intersection of Midpoint Drive and Sharp Point Drive. The project is a portion of Section 20, Township 7 North, Range 68 West of the Sixth Principal Meridian, in the City of Fort Collins, Larimer County, Colorado. A location map is provided in Appendix A. 1.2 Existing Site Characteristics According to the "Soil Survey for Larimer County Area, Colorado" (USDA) soils for onsite and off site basins include: Caruso loam (22) & Loveland clay loam (64). The Caruso series consist of deep, poorly drained soils that formed in alluvium. The Loveland series consist fo deep somewhat poorly drained soils that formed in material weathered from alluvium. The characteristics of the Caruso clay loam and Loveland clay loam include slow runoff and slight erosion. The site is within the moderate wind erodibility zone according to the Wind Erodibility Map for the City of Fort Collins. 1.3 Purpose and Scope of Report This report defines the proposed drainage and erosion control plan for Midpoint Self Storage Solutions. The plan includes consideration of all on -site and tributary off -site runoff and the design of all drainage facilities required for this development. This drainage plan is consistent with the design concepts of the Prospect East Industrial Overall Drainage Plan. (Stewart & Associates, 1978) i Preliminary Drainage and Erosion Control Report Page 1 ' Midpoint Self -Storage Solutions October 25, 2000 TABLE OF CONTENTS PAGE TRANSMITTAL LETTER............................................................................................................. i TABLE OF CONTENTS................................................................................................................ ii 1. INTRODUCTION..................................................................................................................1 1.1 Project Description..........................................................................................................1 1.2 Existing Site Characteristics...........................................................................................1 1.3 Purpose and Scope of Report ..........................................................................................1 1.4 Design Criteria................................................................................................................2 1.5 Master Drainage Basin....................................................................................................2 2. HISTORIC (EXISTING) DRAINAGE.........................................................................I.......2 3. LOCAL DEVELOPED DRAINAGE DESIGN...................................................................3 3.1 Method............................................................................................................................3 3.2 General Flow Routing.....................................................................................................3 3.3 Proposed Drainage Plan ..................................................................................................4 3.4 Hydrologic Analysis of the Proposed Drainage Conditions...........................................5 4. HYDRAULIC ANALYSIS....................................................................................................7 4.1 Allowable Street Capacity...............................................................................................7 4.2 Storm Sewer System.......................................................................................................7 5. EROSION CONTROL...........................................................................................................8 5.1 Erosion and Sediment Control Measures........................................................................8 5.2 Dust Abatement...............................................................................................................8 5.3 Tracking Mud on City Streets.........................................................................................8 5.4 Maintenance....................................................................................................................9 5.5 Permanent Stabilization..................................................................................................9 7. REFERENCES.....................................................................................................................10 Appendix A: Maps and Figures Appendix B: Pond Calculations Appendix C: Street Capacity Calculations Appendix D: Pipe and Inlet Calculations 11 -MVOFRTY.: $�TRU.T ------- p C-4 L'i UJ z Ir ui m SITE DRAKE ROAD Ri VER KE SHER�D '�PAI 019 1�v VICINITY MAP N.T.S. 1 �V J•R ENGINEERING A Subsidiary of Westrian October 25, 2000 Mr. Basil Hamdan City of Fort Collins Stormwater Utility 700 Wood Street Fort Collins, CO 80521 RE: Preliminary Drainage and Erosion Control Report for Midpoint Self Storage Solutions. Dear Basil, We are pleased to submit to you for your approval, this Preliminary Drainage and Erosion Control Report for Midpoint Self -Storage Solutions, a zoned I-G, General Industrial, site located in Prospect Industrial Park. All computations within this report have been completed in compliance with the City of Fort Collins Storm Drainage Design Criteria. We greatly appreciate your time and consideration in reviewing this submittal. Please call if you have any questions. ' Sincerely, JR ENGINEERING Prepared , David Holloway Design Engineer I attachments Reviewed by, Randall Provencio Project Manager 2620 East Prospect Road, Suite 190, Fort Collins, CO 80525 970-491-9888 • Fax: 970-491-9984 • w Jrcngineering.com PRELIMINARY DRAINAGE AND EROSION CONTROL REPORT Midpoint Self -Storage Solutions - Lot 32 Prospect Industrial Park Prepared for: DCB Construction Company, Inc. 909 East'62°d Avenue Denver, Colorado 80216 (303) 287-5525 Prepared by: JR Engineering 2620 E. Prospect Road, Suite 190 Fort Collins, Colorado 80525 (970) 491-9888 October 25, 2000 Job Number 9287.00 PRELIMINARY DRAINAGE AND EROSION CONTROL REPORT Midpoint Self -Storage Solutions - Lot 32 Prospect Industrial Park fV J•R ENGINEERING A Subsidiary of Westrian