TWO-WAY STOP CONTROL SUMMARY
Intersection: Site Access/ Midpint Drive
analyst: short term total pm peak hour
Project No.: 00134
Date: 9/11/00
East/West Street: Midpoint Drive
North/South Street: Site Access
Intersection Orientation: EW Study period (hrs): 0.25
Major Street:
Vehicle Volumes and Adjustment
Approach Eastbound
Movement 1 2 3 14
L T R L
Westbound
5 6
T R
'Jolume
15
5
10
15
Hourly Flow Rate, HFR
15
5
10
15
Percent Heavy Vehicles
--
--
0
-- --
Median Type Undivided
RT Channelized?
manes
1 0
0 1
onfiguration
TR
LT
7pstream Signal?
No
No
Minor Street: Approach
Northbound
Southbound
Movement
7 8
9
10
11 12
L T
R
L
T R
Volume 5 10
Hourly Flow Rate, HFR 5 10
Percent Heavy Vehicles 0 0
Percent Grade (%) 0 0
:dedian Storage 1
Flared Approach:
Exists?
Nor�fl
Storage
PT Channelized?
1 r* 2000
manes
0 0
�` OCT
-onfiguration
LR
- s� �u �'j..
zLn
Delay, Queue
Length, and Level of
Service
approach
EB WB
Northbound
Southbound
Movement
1 4
7 8 9
10 11 12
mane Config
LT
ILR
(vph) 10 15
�(m) (vph) 1609 1026
V/c 0.01 0.01
95% queue length 0.00 0.00
-ontrol Delay 7.3 8.6
lOS A A Uht
Approach Delay 8.6
J1i
A Approach LOS `♦ t `,
4. HCS: Unsignalized Intersections Release 3.2
TWO-WAY STOP CONTROL SUMMARY
ntersection: Timberline Road/ Midpoint Driv
aalyst: Short Term Total AM Peak
roject No.: 00134
ate: 9/11/00
ast/West Street: Midpoint Drive
orth/South Street: Timberline Road
ntersection Orientation: NS Study period (hrs): 0.25
ajor Street:
Vehicle Volumes and Adjustments
Approach Northbound Southbound
Movement 1 2 3 14 5 6
L T R L T R
plume
ourly Flow Rate, HFR
ercent Heavy Vehicles
=dian Type Undivided
Channelized?
anes
Dnfiguration
Dstream Signal?
865 300 810
910 315 852
No
1 1 1
T R T
No No
inor Street: Approach Westbound Eastbound
Movement 7 8 9 10 11 12
L T R L T R
-Dlume
burly Flow Rate, HFR
ercent Heavy Vehicles
=_rcent Grade (�)
=_dian Storage 1
_ared Approach: Exists?
Storage
7 Channelized?
Ines
Dnfiguration
50
52
0
0 0
N
Delay, Queue Length, and Level of Service
pproach NB SB Westbound Eastbound
:)vement 1 4 7 8 9 10 11 12
3ne Config R
(vph)
52
(m) (vph)
336
!c
0.15
5% queue length
0.53
Dntrol Delay
17.7
JS
C
pproach Delay
17.7
pproach LOS
C
HCS: Unsignalized Intersections Release 3.2
TWO-WAY STOP CONTROL SUMMARY
:ntersection: Timberline Road/ Midpoint Driv
_nalyst: Short Term Background PM Peak
_)roject No.: 00134
)ate: 9/11/00
:ast/West Street: Midpoint Drive
;orth/South Street: Timberline Road
:ntersection Orientation: NS Study period (hrs): 0.25
Vehicle Volumes and Adjustments
lajor Street: Approach Northbound Southbound
Movement 1 2 3 4 5 6
L T R L T R
7olume
865
50
1155
Hourly Flow Rate, HFR
910
52
1215
-)ercent Heavy Vehicles
--
--
-- --
edian Type Undivided
'_T Channelized?
No
:anes
1 1
1
'onfiguration
T R
T
;pstream Signal?
No
No
iinor Street: Approach Westbound
Eastbound
Movement 7
8
9
10 11 12
L
T
R
L T R
%olume
80
.ourly Flow Rate, HFR
84
?ercent Heavy Vehicles
0
percent Grade (%)
0
0
?edian Storage 1
,lared Approach: Exists?
Storage
2T Channelized?
No
:anes
1
.onfiguration
R
Delay, Queue Length, and Level of Service
,pproach NB SB Westbound Eastbound
?ovement 1 4 7 8 9 10 11 12
.ane Config R
(iph)
84
:(m) (vph)
336
V/c
0.25
95% queue length
1.01
ontrol Delay
19.2
SOS
C
approach Delay
19.2
approach LOS
C
HCS: Unsignalized Intersections Release 3.2
TWO-WAY STOP CONTROL SUMMARY
=ntersection: Timberline Road/ Midpoint Driv
-zalyst: Short Term Background AM Peak
project No.: 00134
:ate: 9/11/00
ast/West Street: Midpoint Drive
Borth/South Street: Timberline Road
=ntersection Orientation: NS Study period (hrs): 0.25
Vehicle Volumes and Adjustments
iajor Street: Approach Northbound Southbound
Movement 1 2 3 4 5 6
L T R L T R
iolume
ourly Flow Rate, HFR
percent Heavy Vehicles
Median Type Undivided
'.T Channelized?
:anes
'onfiguration
pstream Signal?
Iinor Street: Approach
Movement
plume
ourly Flow Rate, HFR
ercent Heavy Vehicles
lercent Grade (%)
iedian Storage 1
'lared Approach: Exists?
Storage
'IT Channelized?
anes
.onfiguration
_pproach
l ovement
pane Config
(vph)
(m) (vph)
7/c
5% queue length
.ontrol Delay
:OS
;_pproach Delay
.pproach LOS
865 300 810
910 315 852
No
1 1 1
T R T
No No
Westbound
7 8 9
L T R
N
N
45
47
0
No
Eastbound
10 11 12
L T R
J]
lay, Queue Length, and Level of Service
NB SB Westbound Eastbound
1 4 7 8 9 10 11 12
R
17.4
C
47
336
0.14
0.46
17.4
C
HCS: Unsignalized Intersections Release 3.2
TWO-WAY STOP CONTROL SUMMARY
Intersection: Timberline Road/ Midpoint Driv
Analyst: existing pm peakhour
Project No.: 00134
Date: 9/11/00
East/West Street: Midpoint Drive
North/South Street: Timberline Road
Intersection Orientation: NS Study period (hrs): 0.25
Major Street:
Vehicle Volumes and Adjustments
Approach Northbound
Movement 1 2 3 4
L T R L
Vo 1 ume
:sourly Flow Rate, HFR
Percent Heavy Vehicles
Median Type Undivided
RT Channelized?
manes
:onfiguration
7pstream Signal?
Southbound
5' 6
T R
785 75 1050
826 78 1105
No
1 1 1
T R T
No No
Minor Street: Approach Westbound Eastbound
Movement 7 8 9 10 11 12
L T R L T R
Jo 1 ume 75
Hourly Flow Rate, HFR 78
Percent Heavy Vehicles 0
Percent Grade (%) 0 0
:Median Storage 1
Flared Approach: Exists?
Storage
RT Channelized? No
manes 1
-onfiguration R
Delay, Queue Length, and Level of Service
approach NB SB Westbound Eastbound
.Movement 1 4 17 8 9 10 11 12
mane Config R
7 (vph)
78
_�(m) (vph)
375
J/c
0.21
95% queue length
0.81
-ontrol Delay
17.1
SOS
C
Approach Delay
17.1
Approach LOS
C
HCS: Unsignalized Intersections Release 3.2
TWO-WAY STOP CONTROL SUMMARY
intersection: Timberline Road/ Midpoint Driv
Analyst: existing am peak hour
Project No.: 00134
Date: 9/11/00
East/West Street: Midpoint Drive
North/South Street: Timberline Road
Intersection Orientation: NS Study period (hrs)
Vehicle Volumes and Adjustments
0.25
Major Street: Approach
Northbound
Southbound
Movement
1
2
3
4
5
6
L
T
R
L
T
R
Volume
785
275
735
Hourly Flow Rate, HFR
826
289
773
Percent Heavy Vehicles
--
--
--
--
Median Type Undivided
RT Channelized?
No
Lanes
1 1
1
Configuration
T R
T
Upstream Signal?
No
No
Minor Street: Approach
Westbound
Eastbound
Movement
7
8
9
I 10
11
12.
L
T
R
L
T
R
Volume
40
Hourly Flow Rate, HFR
42
Percent Heavy Vehicles
0
Percent Grade
0
0
Median Storage 1
Flared Approach: Exists?
Storage
RT Channelized?
No
Lanes
1
Configuration
R
Delay, Queue Length, and Level of Service
Approach NB SB Westbound Eastbound
Movement 1 4 7 8 9 10 11 12
Lane Config R
v (vph)
42
C(m) (vph)
375
v/c
0.11
95% queue length
0.33
Control Delay
15.8
LOS
C
Approach Delay
15.8
Approach LOS
C
Timberline Road/ Midpoint Drive
HCS: Unsignalized Intersections Release 3.2
TWO-WAY STOP CONTROL SUMMARY
ntersection: Sharp Point Drive/ Prospect Ro
nalyst: Short Term Total PM Peak
- ject No.: 00134
ate: 9/11/00
ast/West Street: Prospect Road
orth/South Street: Sharp Point Drive
ntersection Orientation: EW Study period (hrs): 0.25
.ajor Street:
Vehicle Volumes and Adjustments
Approach Eastbound Westbound
Movement 1 2 3 4 5 6
L T R L T R
olume
25
1040 50
20 805 5
sourly Flow Rate, HFR
26
1094 52
21 847 5
ercent Heavy Vehicles
2
-- --
2 -- --
edian Type
Undivided
T Channelized?
No
No
ernes
1
1 1
1 1 1
onfiguration
L
T R
L T R
_ostream Signal?
No
No
inor Street: Approach
Northbound
Southbound
Movement
7
8
9
10
11
12
L
T
R
L
T
R
olume
105
5
100
25
5
75
curly Flow Rate, HFR
110
5
105
26
5
78
'ercent Heavy Vehicles
2
2
2
2
2
2
ercent Grade (%)
0
0
edian Storage 1
lared Approach: Exists?
No
No
Storage
T Channelized?
ernes
1 1 0
1 1 0
onfiguration
L TR
L TR
pproach
ovement
ane Config
lay, Queue Length, and Level of Service
EB WB Northbound Southbound
1 4 7 8 9 I 10 11 12
L L L TR L TR
(vph)
26
21
110
110
26
83
(m) (vph)
787
610
27
221
19
261
-/c
0.03
0.03
4.07
0.50
1.37
0.32
5% queue length
0.00
0.00
11.11
2.38
2.29
1.33
ontrol Delay
9.7
11.1
36.4
628.9
25.1
OS
A
B
E
F
D
_pproach Delay
169.1
_a-oroach LOS
F
HCS: Unsignalized Intersections Release 3.2
TWO-WAY STOP CONTROL SUMMARY
:ntersection: Sharp Point Drive/ Prospect Ro
nalyst: Short Term Total AM Peak
roject No.: 00134
%ate: 9/11/00
'ast/West Street: Prospect Road
forth/South Street: Sharp Point Drive
:ntersection Orientation: EW Study period (hrs): 0.25
Vehicle Volumes and Adjustments
Major Street: Approach Eastbound Westbound
Movement 1 2 3 4 5 6
L T R L T R
iolume
10
600
295
150
915
35
-7ourly Flow Rate, HFR
10
631
310
157
963
36
percent Heavy Vehicles
2
--
--
2
--
--
tedian Type Undivided
'.T Channelized?
No
No
:anes
1
1 1
1 1 1
onfiguration
L
T R
L T R
pstream Signal?
No
No
Tinor Street: Approach
Northbound
Southbound
Movement
7
8
9
10
11
12
L
T
R
L
T
R
'olume
40
5 70
5 5 10
;curly Flow Rate, HFR
42
5 73
5 5 10
percent Heavy Vehicles
2
2 2
2 2 2
lercent Grade
0
0
ledian Storage 1
Flared Approach: Exists?
No
No
Storage
5
:T Channelized?
,anes
1
1 0
1 1 0
:onfiguration
L
TR
L TR
Delay, Queue Length, and Level of Service
.pproach EB WB Northbound Southbound
Movement 1 4 17 8 9 10 11 12
mane Config L L L TR L TR
(vph)
10
157
42
78
5
1.5
:(m) (vph)
693
729
34
307
24
80
;r/c
0.01
0.22
1.24
0.25
0.21
0.19
a5% queue length
0.00
0.89
3.18
1.02
0.32
0.51
:ontrol Delay
10.3
11.3
412.1
20.7
190.9
60.1
'OS
B
B
F
C
F
F
-Approach Delay
157.7
92.8
approach LOS
F
F
HCS: Unsignalized Intersections Release 3.2
TWO-WAY STOP CONTROL SUMMARY
ntersection: Sharp Point Drive/ Prospect Ro
.nalyst: Short Term Background PM Peak
project No.: 00134
-)ate: 9/11/00
:ast/West Street: Prospect Road
forth/South Street: Sharp Point Drive
Intersection Orientation: EW Study period (hrs)
Major Street
Vehicle Volumes and Adjustments
Approach Eastbound
Movement 1 2 3 4
L T R L
Westbound
5" 6
T R
0.25
iolume
25
1040 40
15 805 5
:sourly Flow Rate, HFR
26
1094 42
15 847 5
percent Heavy Vehicles
2
-- --
2 -- --
Iedian Type
Undivided
!T Channelized?
No
No
Janes
1
1 1
1 1 1
.onfiguration
L
T R
L T R
ipstream Signal?
No
No
4inor Street: Approach
Movement
7
L
Northbound
8
T
9
R
I 10
L
Southbound
11
T
12
R
Iolume
95
5
95
25
5
75
.-sourly Flow Rate, HFR
100
5
100
26
5
78
?ercent Heavy Vehicles
.2
2
2
2
2
2
Dercent Grade (%)
0
0
:Median Storage 1
Flared Approach: Exists?
No
No
Storage
:�T Channelized?
manes
1 1 0
1 1 0
:onfiguration
L TR
L TR
Delay, Queue Length, and Level of Servic
approach EB WB Northbound
Movement 1 4 7 8 9 I 10
mane Config L L L TR L
Southbound
11 12
TR
-r (vph)
26
15
100
105
26
2(m) (vph)
787
615
28
220
21
v/c
0.03
0.02
3.57
0.48
1.24
95% queue length
0.00
0.00
9.84
2.23
2.22
_2ontrol Delay
9.7
11.0
35.5
543.7
SOS
A
B
E
F
approach Delay
148.5
Approach LOS
F
83
265
0.31
1.31
24.7
C
HCS: Unsignalized Intersections Release 3.2
TWO-WAY STOP CONTROL SUMMARY
_ntersection: Sharp Point Drive/ Prospect Ro
==nalyst: Short Term background AM Peak
?roject No.: 00134
Date: 9/11/00
last/West Street: Prospect Road
worth/South Street: Sharp Point Drive
=ntersection Orientation: EW Study period (hrs): 0.25
Vehicle Volumes and Adjustments
Major Street: Approach
Eastbound
Westbound
Movement
1
2
3
5
6
L
T
R
14
L
T
R
Iolume
10
600
290
150
915
35
:sourly Flow Rate, HFR
10
631
305
157
963
36
-'ercent Heavy Vehicles
2
--
--
2
--
--
_edian Type Undivided
IT Channelized?
No
No
,anes
1 1 1
1 1 1
'onfiguration
L T R
L T R
pstream Signal?
No
No
?inor Street: Approach
Northbound
Southbound
Movement
7
8
9
10
11
12
L
T
R
I L
T
R
'olume
35
5
70
5
5
10
sourly Flow Rate, HFR
36
5
73
5
5
10
percent Heavy Vehicles
2
2
2
2
2
2
'ercent Grade (%)
0
0
iedian Storage 1
"dared Approach: Exists?
No
No
Storage
:T Channelized?
anes
1 1 0
1 1 0
onfiguration
L TR
L TR
Delay,
Queue
Length, and
Level
of Service
.pproach EB
WB
Northbound
Southbound
iovement 1
4
7 8
9
10 11
12
,ane Config L
L
L
TR I
L
TR
(vph) 10
157
36
78
5
15
(m) (vph) 693
732
34
307
24
82
%/c 0.01
0.21
1.06
0.25
0.21
0.18
'5% queue length 0.00
0.89
2.64
1.02
0.32
0.49
:ontrol Delay 10.3
11.3
349.1
.20.7
190.9
58.5
10S B
B
F
C
F
F
>pproach Delay
124.4
91.6
,pproach LOS
F
F
HCS: Unsignalized Intersections Release 3.2
TWO-WAY STOP CONTROL SUMMARY
ntersection: Sharp Point Drive/ Prospect Ro
zalyst: existing pm peak hour
roject No.: 00134
ate: 9/11/00
ast/West Street:
;orth/South Street: Sharp Point Drive
ntersection Orientation: EW Study period (hrs): 0.25
Vehicle Volumes and Adjustments
.ajor Street: Approach Eastbound Westbound
Movement 1 2 3 4 5 6
L T R L T R
7olume
25
.945 35
15 730 5
sourly Flow Rate, HFR
26
994 36
15 768 5
'ercent Heavy Vehicles
2
-- --
2 -- --
edian Type
Undivided
.T Channelized?
No
No
anes
1
1 1
1 1 1
onfiguration
L
T R
L T R
pstream Signal?
No
No
:inor Street: Approach
Northbound
Southbound
Movement
7
8
9
10
11
12
L
T
R.
I L
T
R
olume
85
0
85
25
5
70
_ourly Flow Rate,
HFR
89
0
89
26
5
73
-
-'ercent Heavy Vehicles
2
2
2
2
2
2
ercent Grade (%)
0
0
.edian Storage
1
lared Approach:
Exists?
No
No
Storage
T Channelized?
anes
1 1
0
1 1
0
onfiguration
L
TR
L
TR
Delay,
Queue
Length,
and Level
of Service
pproach
EB
WB
Northbound
Southbound
ovement
1
4
7
8
9
10
11
12
ane Config
L
L
L
TR
L
TR
(vph)
26
15
89
89
26
78
(m) (vph)
842
674
40
297
35
304
-/c
0.03
0.02
2.22
0.30
0.74
0.26
5% queue length
0.00
0.00
7.60
1.26
1.77
1.03
"ontrol Delay
9.4
10.5
778.2
22.2
244.2
20.9
OS
A
B
F
C
F
C
_pproach Delay
400.2
76.7
_pproach LOS
F
F
HCS: Unsignalized Intersections Release 3.2
TWO-WAY STOP CONTROL SUMMARY
Intersection: Sharp Point Drive/ Prospect Ro
analyst: existing am peak hour
Project No.: 00134
Date: 9/11/00
mast/West Street: Prospect Road
North/South Street: Sharp Point Drive
Intersection Orientation: EW Study period (hrs): 0.25
Major Street
Vehicle Volumes and Adjustments
Approach Eastbound Westbound
Movement 1 2 3 4 5 6
L T R L T R
�701ume
5
545
265
135
830
30
Hourly Flow Rate, HFR
5
573
278
142
873
31
Percent Heavy Vehicles
2
--
--
2
--
--
-ledian Type Undivided
ZT Channelized?
No
No
manes
1 1 1
1 1 1
:onfiguration
L T R
L T R
Jpstream Signal?
No
No
Minor Street: Approach
Northbound
Southbound
Movement
7
8
9
10
11
12
L
T
R
L
T
R
Iolume
30
5
65
5
5
10
dourly Flow Rate,
HFR
31
5
68
5
5
10
Percent Heavy Vehicles
2
2
2
2
2
2
Percent Grade
0
0
edian Storage
1
Flared Approach:
Exists?
No.
No
Storage
RT Channelized?
"manes
1 1
0
1 1
0
:onfiguration
L
TR
L
TR
Delay,
Queue
Length,
and Level
of
Service
,pproach
EB
WB
Northbound
Southbound
4ovement
1
4
7
.8
9
10
11
12
mane Config
L
L
IL
TR
L
TR
-r (vph)
5
142
31
73
5
15
:(m) (vph)
752
788
51
357
36
ill
v/c
0.01
0.18
0.61
0.20
0.14
0.14
95% queue length
0.00
0.71
1.74
0.79
0.23
0.35
ontrol Delay
9.8
10.6
152.0
.17.7
120.5
42.4
SOS
A
B
F
C
F
E
approach Delay
57.7
62.0
_kpproach LOS
F
F
r y <:
Sharp #gm Ddv / Prospect Road
INTERSECTION LEVEL OF SERVICE WORKSHEETS
.09/01/00 FRI 11:06 FA% 303 857 9191 FAX 10005
Rocky Mountain Counts
1106 Cherry Court
Fort Lupton, CO 80621 File Name : TIMPM
Phone (303) 641-0445 Fax (303) 857-9191 Site Code .: 00000067
1 /2000
Start Date . 08/3
Page No
: 2
T1MouthbIN�
Sound
�
MIDPOINTld 11 Nolit n RD
westbound ob�� Taiei Tfj
—� �._._. i
iiitte
?j -i.
o. Tme1 I
M;10-
otei .J fILO
_.
Pour Fr3m-T4:00 PM to 05:45 PM - Peak 1 of 1
Irdwrue[Son
04:45 PM
1048 2
1050
73
1
74 47 735
032 1956
Volume
te Perm
99.8 0.2
98.6
1.4
1
5.6 94.4
29 13 186
199 5n1
1`15 10 Volume
273 0
273
28
0.976
Peak Fecor
High im.
0�;00 PM
r
0�:00
04'4Ii PM
14 214
Volume
273 0
273
0.982
2A
1
29
O.S38
0.228
PeakFactor
09/01/00 FRI 11:08 FAX 303 857 9191 FAX fd►OOII
Rocky Mountain Counts
1106 Cherry Court
Fort Lupton, CO 80621 File Name : TIMPM
Phone (303) 641-0445 Fax (303) 857-9191 Site Code : 00000067
Start Date : 08/31/2000
Page No : 1
_ Grow&Prinmd-Unshftd _
�MBERIJNE F� r M9]�R 11M8ERUNE RD
I Southbound I Nhsroound Norftound _
Stir T1m° _ Thnr� Ai
I Right Loft Aop. Total Ri �Thru % > o; Total lint Tnto�
FR=r I t,p I 1.0 1.9 1.00 1 1.0 ��
04:00 PM 237 0 25 3 cs 20 176 196 461
04:15 PM 235 0 19 2 21 20 169 109 445
04:30 PM 238 2 16 2 17 14 170 184 441
0445PM 249 2 17 0 17 14 214 Z28 496.
Tay ' 4 76 7 83 68 729 797 1843
05.00 PM 273 0 273 28 1 29 13 186 199 601
06:15 PM 259 0 Z59 12 0 12 7 207 271 485
u5:30 PM 267 0 267 16 0 16 13 179 191 474
05:45 PM 272 0 Z72 9 0 _ 9 12 191 203 I 484
motel loll 0 1071 I 6� 1 66 45 762 807 1944
Grand Tote)
Apprdt %
Total %
2030 4 2334 I 141 8 149 I 113 1491 1604I 3i87
39.0 0.2 94.6 5.4 1.0 93.0
53.6 0.1 53.7 3.7 0.2 39 3.0 39.4 42.4
rIn
�
Toul
Lam]
i
+`Q
Vi
NaM � y
W11004:=14
6a1/00 0:Lt;00 PU
UIMIftYC I I�
J
i
TMN RkIM
Lout ,
i 1
In Tad
TI
.09/01/00 FRI 11:05 FAX 303 857 9191 FAX
10003
Rocky Mountain Counts
. 1106 Cherry Court
Fort Lupton, CO 80621 File Name : TIMAM
Phone (303) 641-0445 Fax (303) 857-9191 Site Code : 00000067
Start Date : 09/01/2000
Page No : 2
TIMHERUNE _ M07Pt71'nMBERUNE
ou Sautnbnd Westbound Notlhbaundnd.
�-...
S AI lime II
—5S
Lett. AoyTatal
I
Riafi
Left
RiaM I Thru I &p
Totd I�otd
Peak How From 07:00 AM to 08:45
AM -Peak 1 of 1
Intemgdon
Voluma
07:15AM
736
3
739
39
1
40 276 784
1059 1838
Percent
99.6
0.4
1
193
57.5
21
2.5
1
26.0 74.0
22 109 222
331 j 546
07:45 Volume
192
Peak Faeror
High Int
08:00 AM
07:45 AM
o7:45 AM
10.842
Voluma
194
2
196
21
1
22 109 222
331
Peak Facmr
0.943 j
0.455 1
0.800
TOW
M7-
I
i
r�@
f T
sum' 1�
BMW AM
7
f
T r
nvu FF M i
• II
�37 I toSo
out In vial f
nueex
09/01/00 FRI 11:05 FA% 303 857 9191 F.AX
la 00,2
Rocky Mountain Counts
1106 Cherry Court
Fort Lupton, CO 80621
Phone (303) 641-0445 Fax (303) 857-9191
TUEuUE
07:15 AM
186
0
97:30 AM
164
0
07:45AM ---w
192
1
Total
1
08:00 AM
194
2
08:15AM
167
2
09:30 AM
172
0
08:45 AM
146
0
Total
679
4
Grand Total
1378
5
Apprrh 11
99.6
0.4
Total V.
41.4
07
File Name : TIMAM
Site Code : 00000067
Start Date : 09/01/2000
Page No : 1
157 0 0 0 45 163 208
186 1 0 1 39 186 225 412
164 3 0 3 56 217 273 440
193 21 1 22 109 222 331 346
700 F 25 1 26T 249 788 1037 1 1763
196 14 0 14 71 159 2360 I 141
169 11 0 11 47 179 226 406
172 4 0 4 44 172 216 392
146 13 1 141 26 _ 138 164 _ 324
6831 42 1 43 188 sae 836 1 Sfi2
1383I 67 2 69 437 1436 18731 3325
II 97.1 L9 23.3 76.7
s 41 90 0.1 2.1 13.1 43.2 56.3
Out In Tall
Lad9] 13t0 7-W
� s
Thru Loft
AIR
MNlll
� g�
ae
d�
.UD T.000f1 NM
/n0 8d!1'OG AM
r
UfWMRod .J
I li
1
7 Ur
fJ
Out In Toth
0'9/07/00 THU 08:34 FAX 303 857 9191 FAX
2005
Peek Hour From 04:00 PM to 05:45 P
Inter3eclion
04:45 PM
Volume
72 1 25
Percent
73.5 1.0 25.5
05:15
ZO 0 10
Volume
Peak Factor
High Int
05:00 PM
Rocky Mountain Counts
1106 Cherry Court
Fort Lupton, CO 80621 File Name : PROSPECTPM
Phone (303) 641-0445 Fax (303) 857-9191 Site Code : 00000067
Start Date : 08/30/2000
Page No : 2
ok'
Be
30
Volume 24 1 8 33
Pee}: Factor 0.742
of 1
7 731 13
0.9 97.3 1.7
3 191 2
05:15 PM
751
196
3 191 2 196
Use
93
0
94
525
0.0
47.5
27 .
0
27
05:15 PM
27
0
27
OO.A In Til
l =
`-_
Rftm Thru LeR
sw
F-
NOIM
RWrA:ZW P97
ammw PM
a 11 �c
o
� I r
I IeR Thru RqM
I -T
1 s; 1 ; �7] 7- 3w
Our In Tmn
SN40.P POINT
177
54
54
0.819
37 945
25
1007
3.7 93.8
2.5
7 251
4
262
05:15 PM
7 251
4
262
0.961
2033
542
0.938
09/07/00 THU 08:34 FA% 303 857 9191 FAX
[a 004
Rocky Mountain Counts
1106 Cherry Court
Fort Lupton, CO 80621 File Name : PROSPECTPM
Phone (303) 641-0445 Fax (303) 857-9191 Site Code : 00000067
Start Date : 08/30/2000
Page No :I
SRARP POINT
PROSPECT
SHARP
INT
-PROSPECT
Southbound
I
Westbound
Northbound
I Eastbound
PiyM 'i hiu Lett I
App.
Total
Q� ,nt
I • -g•
Thru
I g1t '�.
Told
Time f4lght Thni Left' APP'
TwIld
I %Pub .?y I �L�l
pp.
otal
Int.
Tuld
t'eaor
04.,m Pied
1.0
5
_LO 1.0 I
0 2 7
L01
1 I
I 1.0
13
l.0
1.
0
..---
1.01
19 28
14 179 7
9
1 405
3 167 3 1731
04115 PM
7
0 1 8
0
205 3
2081
13
0
19 32
15 186 4
205
453
04:30 PM
10
0 2 12
1
151 5
1S7
25
0
28 53
4 z15 8
Z30
452
04AS PM
10
0 4 14
3 _
7
182 3
705 14
188
7251
16
57
0
0 `
_17 33
9 146 1
11 232 9
259
494
Toted 32 0 9 41
44 - 819 ZB
891 1
1804
05:00 PM
24
1
8
33 '
0
105
6
1911
23
0
23
05:15 PM
20
0
10
301
3
191
2
126
27
0
27
05:30 PM
18
0
3
21
1
173
2
176
27
0
17
05:46 PM
9
0
6
15
2
207
3
212
14
1
12
Trxy
71
1
27
991
6
756
13
7751
91
1
79
Grand Total
103
1
36
1401
73
1461
27
1501
158
1
158
Apprfl Y.
73.6
0.7
25.7
1
0.9
97.3
1.8
43.8
0.3
49.8
Total :
2.7
0.0
0.9
3.7 1
0.3
38.3
0.7
39.4
4.1
0.0
4,1
46
15
214
7
236
506
54
7
251
4
262
542
44
4
241
5
2bul
491
27
3
208
3
468
171 1
29
914
19
_..214
962 +
2007
317
73
1733
47
1853
3811
3.9
93.5
2.5
8.3
1.9
45.5
1.2
49.6
Out In TOW
ail i7o I' zm I
I ...I
Jai-'J97
R Thm Lei[
• I
r �7
roll
1'• � ' �� NYfal • � � I��
To
�I
mS43:W PM
r �
�
h u1.0ls.e
m�
I.etl Tlw Rkjm
158 1 1
I I
I 107] 1 _ .317j j � 618�
Out In TOtel
SHARP POINT
'09/07/00 THU 08:34 FA% 303 857 9191 FAI
Z 003
Rocky Mountain Counts
1106 Cherry Court
Fort Lupton, CO 80621 File Name : PROSPECTAM
Phone (303) 641-0445 Fax (303) 857-9191 Site Code : 00000067
Start Date : 08/30/2000
Page No : 2
Southbound
I
Westbound
_
9tertTime
.
Ri ht inn,
� I
l e1t
ADP'
Totd
I �
Thru Len
I
'gyp'
Total
Peck Hour From 07:00 AM to 08:45 AM - Peck
1 of 1
Intemedion
07:15AM
Volume
11 1
6
18
32
828
134
994
Percent
61.1 9.8
33.3
3.2
83.3
13.5
0&00
Volume
5 0
3
8
15
210
35
260
Peak Factor
High Int.
08:00 AM
07:30 AM
Volume
5 0
3
8
10
233
25
268
Peek Factor
0.563
0.927
Right I Thru I Lan I APP; { w9M ` ThN I UM I A'PP;
67 2
30
99
264 545
'71
!
980I 1991
67.7 2.0
30.3
30.0 61.9
8.1
39 1
16
56
90 126
29
245� 569
0.875
08:00 AM
07:45 AM
39 1
16
66
121 120
23
264
0.442
0.933 !
Out _ to Total
®t �11
I 1 7
NTMLan
_LO
i
I
0
Bld0A0 71L.Ut1 AM-3 m
BrJQ= 8==AM I�
ym UMhUW 6� nL
V201
�
I `
L*9IL=90 r-49
ota In Taw
SHAFtP POIffT
09/07/00 THU 08:34 FAX 303 857 9191 FAX
Q 002
SWA-0 POINT
_ 80=bound
Stan7ima I Right i Thru I Lett
07:15 AM
2
0
2
07:30 AM
1
1
1
07:45 AM_-
3
0
0
Tote)
_
7
7
3
08:00 AM
5
0
3
08:15AM
3
0
1
08:30 AM
5
0
0
0.8'45 AM
S
0
2
_
Total
18
0
6
Grand Total
25
1
9
Apprch %.
71.4
2.9
25.7
Total %
0.7
0.0
1
Rocky Mountain Counts
1106 Cherry Court
Fort Lupton, CO 80621 File Name : PROSPECTAM
Phone (303) 641-0445 Fax (303) 857-9191 Site Code : 00000067
Start Date : 08/30/2000
Page No : 1
Groups Pnnta& UnshiRad
Right
Thru Lott Total
1.0
1.01 1.0
1 2
186 19 — 256
4 5•
170 28 203
3 10
233 25 268
Right Thry Leh l RigTow
htT Thru Leh
5
1
8 15 210 35 260 39
4 8 179 16 203 10
5 3 194 15 212 4
1 1
7�
18
166
8 192
406
0 4
5
35
133
11 1791
455
0 9
31
121
120
23 264 1
561
1 14
44
191 -
562
52 805 -
1edo
1 16
56 1
90
128
29 245
569
0 9
191
34
129
17 174I
400
0 7
11 1
23
104
7 134
362
0 4_
7 1
8
110
3 1211
314
1 35
93f
155
469
50 6741
1645
35 48 1553 193 1794 85 2 50 137' 346 1031 102 1479 3445
2.7 86.6 10.8 6.2.0 1.5 36.5 214 69.7 6.9
1.0 1.4 45.1 5.6 52.1 IS 0.1 1.5 4.0 10.0 23.9 3.0 42.9
EXISTING TRAFFIC COUNTS
m �
N
CD =
o
a
I
/
50/85
/
r
m�
�o
5
s»
OW raanSPcan
HSSOCIRrES. /nC.
3nsultlng Engineers �Sc�ole=7
\m
10/25� `35/5
600/1040�—915/805
295/50� /f150/20
I 1�
\ I O 0
I \ i
I /I
Prospect Rd.
cn 1
s
o�
0
o \
O \
CD
A
O„ \
co
a /
Ips/ /
5/S
~ l0/C / t!
+0 s
h
a
Drake Rd.
MINISTORAGE TRAFFIC IMPACT STUDY
YEAR 2005 + SITE TRAFFIC VOLUMES
Date 9/12/00 lDrown by RAC lJob # 00134
ure
\
^ A
�
\o� �� ,, _\o _ z5/8 e
�290/40---,� �150/e
�x !
Prospect %.
---- ) ®
y� \ \
Z \
�45/® Z
\
Z
- a ~ x
o¥ y
I �x
G
m . �
(
\ � -
} « %
°��
§
}
} Drake Rd.
)
f
w¥JOq« TRAFFIC wqc SUS
r n R� YEAR 2005 BACKGROUND TRAFFIC VOLUMES
�sc� Inc
0on_m Engineers Scale Cw m& Date w 2A; IDrown by 9c lJob ¥ m g4 Figure 6
m
CD
a
a
cu
CD
\� o
000
0/0
o
ao on
I �r
I i �
I �
Prospect Rd.
=r 1.
07 \
\
0
\
/
o
\.
O;
O„
CD
CD
a
%
4i0
�Bi,?
e
Rd.
MINISTORAGE TRAFFIC IMPACT STUDY
PrAAnsPCAn SITE GENERATED TRAFFIC VOLUMES
H550ORrEQ m[.
msultingEngineers IScale 1"=I000' IDcite 9/12/00 lDrown by RAC lJob # 00134
ure 5
�o
�m
s 20%
X \.
CD = `
a $ 1
m
m
T Prospect Rd.
3 0 %cn
20%
o �
S Q^ \
30%
t c+,
s�. 3
z
QR CD
o
s
t o m
lz Drake Rd.
x
MINISTORAGE TRAFFIC IMPACT STUDY
� AnsPCAn TRIP DISTRIBUTION
HSSOC/NTE5, Inc.
ConsuttingEngineers Scale I"=i000' Date 9/12/00 Drawn by RAC Job # 00134 Fi ure 4
on
-Nip
a
\ o 0545/945—�830/730
0/5830/730135/15
I
I �
1 �
Prospect Rd.
co 1
d l
Cr YtCD
All
CD
;o 54.
Drake Rd.
C/HTES
MINISTORAGE TRAFFIC IMPACT STUDY
HSSOnc
�rawrEsInr EXISTING TRAFFIC VOLUMES
�nsuttingEngineers Scole 1"=1000' jDate 9/12/00 lDrown by RAC I Job # 00134 Figure 3
°�e
MINISTORAGE TRAFFIC IMPACT STUDY
TAAnSPCAn SITE P LA N
H550ORTE-5 JJX
ConsuttingEngineem Scale 1"=120' Date 9/11/00 1 Drown by RAC lJob # 00134 Figure 2
Vine Dr.
1
ll
N
AwWk
rbi�q`e
I
I
CO
O 14
Frontage Rd. \\
\
I
\
-
-- ' Prospect Rd. i
\
Edore
,
Perk
x
CDCD
17
D
S
=d
M
_.
x—
G
i
Drake Rd.
I
I G
\
I
x
s
3
,
wn
°
I
_
PROJECT
' 1�`
SITE
,
;
-z
x
%
;
Horsetooth Rd.
1
\
colllm" x
Golf Course
-
\
�AnsPCAn
MINISTORAGE TRAFFIC
IMPACT STUDY
VICINITY
MAP
HSS,'C/NTEs inc.
Scale 1"=2500'
Dote 9/11/00 1 Drawn by
RAC Job # 00134 Figure 1
ConsuttingEngineers
FIGURES
TP-00134 Midpoint Self Storage Solutions Project 9/13/00
Traffic Impact Analysis
Table 2 - Trip Generation Estimate
Land Use
Size
Independent
Variable
Average Daily
Trips
A.M. Peak Hour Trips
P.M. Peak Hour Trips
Rate
Total
In
T T
Out
Rate
TO
I Rate
Total
Mini -Storage
Apartment Unit
125.00
1.00
1,000 Sf
du
2.50
313
------- 7
157
4
156
3
0.15
0.51
19
11
8
0.23
29
15
14
6.63
--- 2-
1
1
0.62
2
Total Trips
320
161
1591
21
12
9
31
001341ripgen
TP-00124 Midpoint Set( Storage Solutions Project
Traffic Impact Study
Table 1 - Peak Hour Intersection Level of Service Summary
9113/00
Intersection and
Critical Movements
Existing
2005 Background
2005 Background Plus Site
AM Peak Hour
I PM Peak Hour
I AM Peak Hour
PM Peak Hour
AM Peak Hour
I PM Peak Hour
Delay a
LOS
I Delay a
`LOS
I Delay a
: LOS
I Delay a
LOS
I Delay a
LOS
I Delay a
LOS
STOP SIGN CONTROL
- - --- --- - - -- --- -- .
Sharp Point Drive/ Prospect Road
.-._........-----
- -
-- -- -
- -
--- - - -- -...-- --- --- -- -- -- - - --
Eastbound Left
Westbound Left
Northbound Left
Northbound Through -Right
Southbound Left
Southbound Through -Right
9.8
10.6
152.0
17.7
120.5
42.4
A
B
F
C
F
E
9.4
10.5
778.2
22.2
244.2
20.9
A
B
F
C
F
C
10.3
11.3
349.1
20.7
190.9
58.5
B
B
F
C
F
F
9.7
11.0
999.0
35.5
543.7
24.7
A
B
F
E
F
C
10.3
11.3
412.1
20.9
190.9
60.1
B
B
F
C
F
F
9.7
11.1
999.0
36.4
628.9
25.1
A
B
F
E
F
D
Timberline Road/ Midpoint Drive
Westbound Right _ _
15.8 -� -�
17.1
I - C-
-17_4 1 C
(-19. C I _17_7 C I 19.5 C
Drive
Site Access/ Midpoint__J
n/a n/a n/a n/a 7.4
9.1 A 8.6 A
Westbound Left
Northbound Left -Right
(a) Delay represented in average seconds per vehicle.
00 U4los
TABLES
ATTACHMENTS
Mr. Bruxvoort
Page 5 of 5
September 15, 2000
If you have any questions or comments regarding this draft traffic analysis, please give me a call.
Sincerely,
TransPlan Associates, Inc.
Janet M. Hruby, P.E.
Project Engineer
Attachments: Tables
Figures
Existing Traffic Counts
LOS Capacity Worksheets
Midpoint Self Storage Solutions Project TransPlan Associates, Inc.
DRAFT Traffic Impact Study Letter; TP# 00134
Mr. Bruxvoort September 15, 2000
Page 4 of 5
intersections. The LOS analysis results shown on Table 1 indicate that for short-term background
conditions, the westbound right turn at Timberline Road/Midpoint Drive will continue to operate at
LOS C during the peak hours.
As through traffic volumes increase over the short term, the delays on the Sharp Point Drive
approaches to Prospect Road are shown to increase. While there will continue to be delays for the
minor street movements, the overall intersection will operate acceptably. As mentioned in the
discussion for existing conditions, there are alternate routes to access the developments along Sharp
Point Drive and Midpoint Drive that are expected to be utilized as delays at the intersection of Sharp
Point Drive/ Prospect Road increase.
With the addition of the minimal peak hour site traffic volume, the intersections will continue to
operate as described for short-term background conditions. No modifications are recommended at
the study intersections.
Site Access and Circulation
Access to the mini -storage area and office/apartment is provided by one new curb cut onto Midpoint
Drive. From this access, a 25 foot drive aisle is generally provided throughout the site. This spacing
of the drive aisles is generally sufficient to accommodate the tuming radius of a passenger car with
trailer, a motor home, or a single -unit truck. Some maneuvering may be necessary depending on the
storage space being accessed. The proposed security gate is setback over 50 feet from Midpoint
Drive which should provide adequate off-street stacking for vehicles while the gate is opened.
Conclusions
The Midpoint Self Storage Solutions Project is a proposed mini -storage facility on Midpoint Drive
just west of the intersection with Sharp Point Drive in Fort Collins, Colorado. The site plan includes
approximately 100,000 square feet of indoor storage units, a 25,000 square feet outdoor storage area,
and an office with an apartment unit. There are no development plans for the eastern portion of the
site at this time. The site is estimated to generate 320 vehicle trips per day with approximately 20
trips in the AM peak hour and 30 trips in the PM peak hour.
The westbound right turn movement at the intersection of Timberline Road/ Midpoint Drive is
currently operating at LOS C during the peak hours. In the short-term (Year 2005), the intersection
is expected to continue operating at LOS C for background conditions and with the addition of site
traffic. While the overall intersection of Sharp Point Drive/ Prospect Road is operating acceptably,
the left turn movements from Sharp Point Drive currently experience delays during the peak hours.
These delays are expected to continue over the short term. The volume of site traffic is low and only
a slight difference in operations are expected once the site is constructed. Based on the analysis, no
modifications are recommended to the study area intersections. The site plan shows adequate on -site
circulation and setback to the security gate.
Midpoint Self Storage Solutions Project TransPlan Associates, Inc.
DRAFT Traffic Impact Study Letter; TP# 00134
Mr. Bruxvoort September 15, 2000
Page 3 of 5
experienced at stop controlled intersections on major arterials. This difference is primarily due to
the limited data set used in the software. In addition, the software does not accurately consider the
gaps created by the upstream and downstream signalized intersections. As a result, the software can
overestimate the delay for the minor street movement and for the overall intersection. Based on
studies at other stop controlled intersections, delay is expected to be more in the range of 90 to 120
seconds. As through traffic increases and the delays are extended, instead of making a left turn
movement at this unsignalized intersection, some drivers are expected to seek an alternate route on
the existing road network to avoid the longer delays. This intersection is not identified by the City
as a candidate for future signalization.
Site Traffic
Trip generation estimates were calculated for the proposed mini -storage operation using the rates
contained in the Institute of Transportation Engineers trop generation manual'. The rates and
estimated site trips are shown in Table 2. The traffic volumes generated by the proposed mini -
storage site are low, with approximately 20 vehicle trips during the AM peak hour and 30 vehicle
trips during the PM peak hour.
The site trips were assigned to the surrounding road network based on the distribution percentages
shown on Figure 4. The distribution was established based on existing traffic volumes and a general
knowledge of area traffic patterns. Figure 5 presents the site generated traffic volumes estimated at
the study intersections. Since Midpoint Drive is a right in/right out access only, trips destined for
southbound Timberline Road were assigned to exit at Sharp Point Drive and travel on Prospect Road
to access Timberline Road
Short Term Traffic Volume Forecast
Construction of the proposed mini -storage facility is planned to be completed within the next five
years. Background traffic volumes were estimated for the Year 2005 using a two percent annual
growth in traffic at the study area intersections. Using this growth rate on the side streets (Midpoint
Drive and Sharp Point Drive) will account for development on the remaining few lots within the
area. The resulting short-term (Year 2005) background traffic volumes are presented on Figure 6.
The total Year 2005 traffic volumes including the background and site generated traffic are shown
on Figure 7. While there are long-term plans to extend Sharp Point Drive to the south, this
improvement is not expected to be initiated over the short term. As shown on Figure 7, no short-
term improvements were identified within the study area and the existing laneage and traffic control
were used in the analysis.
Short Term Intersection Operations
Both the Year 2005 background and Year 2005 background plus site generated traffic volumes were
analyzed to determine future operations and identify potential capacity constraints at the study area
Trip Generation, Institute of Transportation Engineers, 6' Edition.1997.
Midpoint Self Storage Solutions Project TransPlan Associates, Inc.
DRAFT Traffic Impact Study Letter; TP# 00134
Mr. Bruxvoort
Page 2 of 5
Existing Traffic Conditions
September 15, 2000
Existing Traffic Volumes
Traffic counts were collected during August 2000 at the intersections ofMidpoint Drive/ Timberline
Road and Sharp Point Drive/ Prospect Road. The existing counts and lane geometry are presented
on Figure 3 and the count data is included as an attachment.
Midpoint Drive and Sharp Point drive are designated as collector roadways. The road cross -sections
are sufficiently wide to provide two travel lanes and parking lanes (or additional turn lanes at
intersections). The posted speed limit is 25 miles per hour on the two roads. Sharp Point Drive
presently terminates as a gated access to a water reclamation facility where there is also trail head
parking.
Timberline Road is a two-lane arterial roadway near the site with a posted speed limit of 40 miles
per hour. The paved shoulders provide bike lanes. The intersection of Timberline Road/ Midpoint
Drive is restricted by a "pork chop" median to right in/right out access to Midpoint Drive.
Prospect Road is a two-lane arterial roadway with auxiliary right and left turn lanes in the east and
westbound directions at the intersection with Sharp Point Drive. This intersection is controlled by
stop signs on the Sharp Point Drive approaches. The posted speed limit is 40 miles per hour to the
west of Sharp Point Drive and 45 miles per hour to the east of Sharp Point Drive.
Existing Intersection Operations
To evaluate the existing operations at the two study intersections, the Level of Service (LOS) was
calculated. The Highway Capacity Manual (HCM)' applies LOS A through F designations, with
LOS A indicating very good operations and LOS F indicating poor, congested operations. The
intersection LOS is represented as a delay in seconds per vehicle for the intersection as a whole and
for critical turning movements. The LOS was calculated for the peak hours at the study area
intersections using the methods in the HCM manual. The City of Fort Collins Traffic Impact Study
Guidelines' indicate that LOS D is the minimal acceptable overall operating condition at
intersections. The results of the intersection LOS calculations are summarized in Table 1. The
intersection LOS worksheets are included as an attachment.
The data in Table 1 show that the westbound right turn movement at the intersection of Timberline
Road and Midpoint Drive is operating acceptably at LOS C during both peak hours. At the
intersection of Sharp Point Drive and Prospect Road, the minor street traffic on Sharp Point Drive
experiences delay in turning onto Prospect Road as shown by the LOS F for the left turn movements
during the peak hours. Although extended delays are typical for left turns onto major arterials, the
delay estimated by HCS software for this movement are often much greater than actual vehicle delay
Hiehwav Capacity Manual, Highway Research Board Special Report 209, Transportation
Research Board. National Research Council, 1997.
City of Fort Collins -Transportation Impact Studv Guidelines. February 26, 1997.
Midpoint Self Storage Solutions Project TransPlan Associates, Inc.
DRAFT Traffic Impact Study Letter, TP# 00134
WRRl15PLR7
R550QRTE5, 117C.
Consulting Engineers
September 15, 2000
Mr. Kent Bruxvoort
JR Engineering
2620 East Prospect Road, Suite 190
Fort Collins, CO 80525
RE: Draft Traffic Impact Study Letter
Midpoint Self Storage Solutions Project
Dear Mr. Bruxvoort:
TransPlan is pleased to provide you with the following draft traffic impact study letter for the
Midpoint Self Storage Solutions Project located in Fort Collins, Colorado. Based on a discussion
with the city traffic engineer, this project required only a brief traffic impact study letter evaluating
the short term traffic conditions at the intersections of Midpoint Drive/ Timberline Road and Sharp
Point Drive/ Prospect Road. An evaluation of pedestrian and bicycle facilities was not required due
to the nature and location of the project.
Project Description
This project proposes the construction of a mire -storage facility on lots 32 and 33 of the Prospect
Industrial Park, located near the intersection of Sharp Point Drive and Midpoint Drive. A vicinity
map is included as Figure 1. The area surrounding the site is mostly developed and includes light
industrial and office uses.
The proposed mini -storage facility will include approximately 100,000 square feet ofindoor storage,
a 25,000 square foot outdoor storage area (for RVs, boats, etc), and an office/apartment unit. A
preliminary site plan is presented on Figure 2. There are no current plans for development of the
eastern portion of the site which may include dedication of a tract for a future right-of-way for the
extension of Sharp Point Drive.
Access to the site will be provided through a twenty-five foot new curb cut onto Midpoint Drive near
the western property line. The entrance will access a small parking area and entry to the storage area
will be restricted by a gate located approximately 50 feet from Midpoint Drive.
Midpoint Self Storage Solutions Project TransPlan Associates, Inc.
DRAFT Traffic Impact Studv Letter; TP# 00134
1375 Walnut Street, Suite 211 • Boulder, Colorado 80302-5263 Telephone: (303) 442-3130 0 Facsimile: (303) 442-3139