HomeMy WebLinkAboutPROSPECT INDUSTRIAL PARK, LOT 32, MIDPOINT SELF-STORAGE - PDP - 28-98B - CORRESPONDENCE - REVISIONS16.. The land will not be re -platted at this time until the owner develops the
opposite site. At that time the owner has the need to re -plat this site.
17. Please refer to revised civil plans for added hydrology calculations.
18. Please refer to the revised erosion control plan for added calculations.
19. There has been added plans to each of the civil construction documents.
20.The existing trees have not been shown as they are desired to be removed
for the development of this site. Please note that 6 new 3" caliper trees have
been added to the site for the exchange of these.
21. Please see the response located above at #20.
22. The sidewalk at the apartment building is 6'-0" wide as requested.
23. The entry into the site has been revised and detailed with a driveway cut as
required.
24. The redlines have been returned for your use. All comments were reviewed
and addressed within these revised plans.
Please review our package and call me directly with any comments or questions.
Please provide an update on anticipated comment return and zoning hearing.
We look forward to working with you to complete this process. Thanks for all your
assistance.
dcb Construction Co. Inc
2. a. We have included details of the trash enclosure as requested.
b. The existing trees have not been shown for clarity of drawing. A separate
plan could be submitted on request.
c. This trees have been reviewed extensively and will impose due hardship
to our development. The owner has elected to remove these trees to
allow for maximum build out.
3, Comment Noted
4. Comment Noted. These standards will be used by irrigation contractor to
produce drawings and designs.
5. Comment Noted
6.(a-e) We have met extensively with Jeff Hill to revise and coordinate the
comments listed within this response and others that came up during our
meeting.
7. These comments have been addressed directly on the plans. Please refer
to civil engineering sheets and SP-3.
8. These comments have been addressed within the revised set of plans.
9. The letter of intent for the necessary off site easements are attached to this
submittal response.
10. The required easements are being prepared and will be submitted directly to
you for your review and approval.
11. Refer to revised site plan for location of adjacent curb cuts on Midpoint.
12 The site plan has been revised to show a driveway cut as requested.
13. Refer to the added fence detail at the rear of the site. We have revised the
fence location so the fence does not cross the drainage ditch.
14. Please refer to the attached easements prepared for your review. There are
two other easements being prepared by JR Engineering. This will be
forwarded to you directly.
15. We have attached a letter of intent for off site easement from the owner of
the property for your review and file.
C construction company, inc.
909 EAST SIXTY-SECOND AVENUE • DENVER, COLORADO 80216 • (303) 287-5525
April 6, 2001
Stephen Olt, Project Planner
Community Planning and Environmental Services
Current Planning — City of Fort Collins
281 North College Ave.
P.O. Box 580
Fort Collins, CO 80522
Re: Midpoint Self -Storage Project @ Prospect Industrial Park
#28-98 Lot 32, Type II (Luc)
Dear Mr. Olt:
Upon receipt of your staff comments, dated February 17, 2001, we have worked
to respond to each of those comments. We have enclosed both quantities of
sets and written responses that outline our revisions. We have met with many of
the departments to directly address their specific comment. We would request
that our submittal be reviewed within the City of Fort Collins guidelines and be
used to submit to formal Zoning Commission for hearing and approval.
Per various recent discussions with the selling property owner Bill Reynolds, we
have made alterations per the cities requests. We have added additional six 3"
caliper trees to the site as per the direct recommendation of the City of Fort
Collins. You will find these revisions on sheet SP-2 of this package.
Please find the following response:
a. The building envelope note for each building has been added to the site
plan along with dimensions to the lot lines.
b. The topography lines have been removed from final site and landscape
plan as requested.