Loading...
HomeMy WebLinkAboutPROSPECT INDUSTRIAL PARK, LOT 32, MIDPOINT SELF-STORAGE - PDP - 28-98B - SUBMITTAL DOCUMENTS - ROUND 2 - ROUTING SHEETProject: �,���J��� Planner: C) (+ � Engineer: ��•� Uk—kr —L--t Ld TraM( Operations: (� Date: `'—/--� /60 Items Requested Site land Plat Utili Drainage R t Other Items Required Redlined Items Being Returned Site land Plat Utility Draina e R t Other Items Being Returned Engineering x L h x Stormwater x x x x X X Water/Wastewate x X X x x x x Tragic Operations Trans. Planning x Transfort Natural Resources , Park Planning TOM Other: _E 4 ✓,W�c, lh V v v,f�" �c� s u� c w. �>k Note: All redlined items should be returned with the resubmittal/ revisions. 1 I 1 ►J. / ./fit ' FILE: PROJECT PLANNM BUILDING INSPECTION ••DRAIFTING MAPPING / • ADVANCE PLANNING • ��o�������� • WATER SERVATIO PUBLIC SERVICE STATE HIGHWAY DE PARTMENT DITCH COMPANY