HomeMy WebLinkAboutRIVERSIDE CENTRE (1450 RIVERSIDE) - PDP - 26-98 - CORRESPONDENCE -C. The land uses proposed are permitted subject to administrative (Type 1)
review. Pursuant to Division 2.2.2 (Article 2, page 13) a neighborhood
meeting will not be required prior to the submittal of this development
application.
d. Copies of the submittal requirements for various development applications
are attached.
e. Copies of the current Development Review Fee and Building Permit Fee
schedules are attached.
The proposed layout that was discussed at conceptual review does not
comply with the City's Land Use Code. Building placement, landscaping
(parking lot islands, etc.), vehicle backing conflicts, and vehicle circulation
conflicts need to be addressed as well as any other applicable Code
requirements.
Please contact Mike Ludwig at 221-6206 with any questions regarding these
comments.
8. Transfort stated that there is an existing public transit route along Riverside
Avenue. Please contact Gaylene Rossiter. at 224-6195 with any questions
regarding this comment.
9. The Stormwater Utility offers the following comments:
a. The site is located within the Spring Creek Drainage Basin. The Stormwater
Development Fee for this basin is $2,175 per acre, subject to a runoff
coefficient reduction. Stormwater Development Fees will only apply to any
newly created imperious surface area.
b. Drainage and erosion control reports and plans are required and must be
prepared by a professional engineer registered in the State of Colorado.
C. If any offsite easements are needed, they must be submitted with the
drainage and erosion control reports. Project Development Plan (PDP)
submittals require letters of intent from offsite land owners. Final Plans will
require the easements to be in a final form acceptable to the City, contingent
on Final approval with all signatures except for the City Manager. The City
Manager will sign them if Final approval is granted.
d. The largest drainage issue will likely be obtaining offsite easements.
However, it appears that most of the offsite land my be City owned.
Obtaining an easement from the City is usually less difficult than dealing with
private property owners. The release rate, if controlled by onsite detention,
will not be as big of an issue as the increase in volume of runoff.
Please contact Glen Schlueter at 221-6589 with any questions regarding these
comments.
10. The Natural Resources Department stated that offsite easements will need to be
reviewed for their impact on storm drainage release into the Poudre River. Please
contact Rob Wilkinson at 221-6288 with any questions regarding these comments.
11. The Current Planning Department offered the following comments:
a. The I, Industrial District is described in Division 4.23 of the Land Use Code
(Article 4, pp. 134-141). Industrial District Land Use Standards are listed on
page 140. Industrial District Development Standards are listed on pages
140-141.
b. General Development Standards are described in Article 3 of the Land Use
Code. In the event of a conflict between a standard or requirement
contained in Article 3 and Article 4, the'standard in Article 4 shall prevail.
4. The Building Inspections Department stated that the proposed buildings must be
equipped with automated fire suppression systems or separated into fire contained
sections of less than 5,000 square feet. Building Inspections cautions the applicant
that printing inks are a flammable liquid. The storage and use of the printing ink
must comply with the fire code (an automated fire suppression system may be
required). An automated fire suppression system would allow the storage of greater
quantities of printing ink. All buildings must be designed in accordance with the Fort
Collins Non -Residential Energy Code. All buildings must have an accessible route
of travel to the public sidewalk. Such access should not cross vehicular drives or
parking. Please contact Sharon Getz at 221-6760 with any questions regarding
these comments.
5. The Water and Wastewater Utility stated that there is an existing 12" water main
in Riverside Avenue and an 8" sanitary sewer in an easement along the north edge
of Riverside Avenue. The location of landscaping must be coordinated with the
sewer along the front of the property. Water and Sewer Plant Investment Fee's
(PIF's) and water rights will be due at the issuance of building permit. Water
Conservation Standards for Landscaping and Irrigation will apply. Please contact
Roger Buffington at 221-6681 with any questions regarding these comments.
6. The Engineering Department offers the following comments:
a. The Street Oversizing Fee is currently $7,292 per acre for Light Industrial
Uses and $14,583 per acre for Office/General Commercial Uses. Please
refer to the attached Building Permit Fee Schedule for the street oversizing..
fees for additional land use categories. Please contact Matt Baker at 221-
7732 to discuss any pro -rating of these fees.
b. Please contact Eric Bracke at 221-6062 to schedule a Transportation Impact
Analysis scoping meeting. The Transportation Impact Analysis must address
vehicular, bicycle, and pedestrian volumes and levels of service.
C. The proposed access points should align with access points on the south
side of Riverside Avenue.
d. Standard Utility Plans and a development agreement will be required.
Please contact Tim Blaridford at 221-6750 with any questions regarding these
comments.
7. The Transportation Planning Department stated that bike racks must be provided
equivalent to 5% of the total of vehicle parking spaces. Sidewalk connections are
needed from the building to the public sidewalk. Please contact Kathleen Reavis
at 224-6140 with any questions regarding these comments.
CONCEPTUAL REVIEW STAFF COMMENTS
City of Fort Collins
MEETING DATE:
ITEM:
APPLICANT:
June 16, 1997
1500 Riverside Avenue
Don Skaggs
P.O. Box 270492
FortCollins, CO 80527
LAND USE DATA: Request for 29,400 square feet of office, showroom,
warehouse and light industrial uses on approximately 4.31
acres located on the east side of the 1500 block of Riverside
Avenue.
COMMENTS:
1. The Zoning Department stated that the property is located in an I, Industrial
District. Each of the proposed uses are permitted subject to administrative (Type
1) review. The layout proposed at the Conceptual Review meeting does not satisfy
the requirements of the new Land Use Code such as the building orientation
.development standard for the I -Industrial District (see Division 4.23(E)(1)(a) on page
140 of Article 4). Commercial printing services would qualify as a light industrial use
which allows a maximum of 0.75 parking spaces per employee (see Division
3.2.2(K)(2)(a) on page 28 of Article 3). Please contact Gary Lopez at 221-6760 with
any questions regarding these comments.
2. The Parks and Recreation Department stated that no Neighborhood or
Community Parkland fees will apply to this development as there are no residential
uses proposed. Please contact Randy Balok at 221-6364 with any questions
regarding this comment.
3. The Light and Power Utility stated that electric facilities exist on the east side of
Riverside Avenue. A transformer location.must be coordinated with the Light and
Power Utility. A single transformer should be shared by the'buildings on this site.
It must be located within 10 feet of a paved surface. Please contact Bruce Vogel
at 221-6700 with any questions regarding these comments.
COMMUNITY PLANNING AND ENVIRONMENTAL SERVICES 281 N. College Ave. C0.13ox580 Fort CoHinc,C080322-0580
PLANNING DEPARTMENT
Community Planning and Environmental Services
Current Planning
City of Fort Collins
June 20, 1997
Don Skaggs
P.O. Box 270492
Fort Collins, CO 80527
Dear Don,
For your information, attached is a copy of the Staff's comments regarding 1500 Riverside
Avenue, which was presented before the Conceptual Review Team on June 16, 1997.
This is a request for 29,400 square feet of office, showroom, warehouse and light industrial
uses on approximately 4.31 acres located on the east side of the 1500 block of Riverside
Avenue.
The comments are offered informally by Staff to assist you in preparing the detailed
components of the project application. Modifications and additions to these comments
may be made at the time of formal review of this project.
If you should have any questions regarding these comments or the next steps in the review
process, please feel free to call me at 221-6206.
Sincerely,
Michael Ludwig
City Planner
xc: Stormwater Utility
City Planner
File
281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6750 • FAX (970) 416-2020