Loading...
HomeMy WebLinkAboutRIVERSIDE CENTRE (MODIFICATION OF STANDARD) - PDP - 26-98 - SUBMITTAL DOCUMENTS - ROUND 4 - PLANNING OBJECTIVESRIVERSIDE CENTRE DON SKAGGS JUNE 211999 STATEMENT OF PLANNING OBJECTIVE The Riverside Centre PDP proposes the phased development of three (3) office/warehouse buildings on a 2.8057 acre lot on the north side of Riverside Avenue. The property is currently zoned "I" — Industrial. Office/warehouse and showroom/warehouse uses are anticipated with the possibility of personal service uses or other permitted uses being located in buildings "A" and "C". The structures are proposed to be pre-engineered steel structures with stucco, split -face concrete block masonry and standing -seam metal roofing featured on the building facades visible to the street. The first phase of development will begin with the western half of building "B". The second Phase will complete building "A". Future phases would complete buildings "B" and C". This phasing plan may be subject to revision based upon market conditions and leasing commitments. Build -out for the entire project is estimated to be 2 to 4 years. Buildings "A" and "C" are located closer to the street frontage with direct pedestrian access provided without crossing a vehicular drive area. Pedestrian access is provided to building "B" with a patterned concrete walkway across the drive area to alert vehicular traffic to the pedestrian crossing area. Since the configuration (length and depth) of the existing lot is fixed, and considering the necessity for street frontage for a multi - tenant building, it is felt this plan best achieves the objectives of the land use code within the given constraints of the site. This lot represents the last undeveloped site on Riverside Avenue (from Prospect to Lemay). As an infill development site, the proposed site plan conforms to the existing context of the street with regard to building setback, orientation and parking location.