pan at the North lime of Prospect Industrial Park. The pan crosses at the Southeast comer of the
existing Larimer County Jail property. Therefore, 1200 feet of Midpoint Drive is carrying runoff from
the high point to the Northwesterly comer of Lot 15. Three of the lots that have been developed have
onsite detention. Five lots that have been developed do not have detention and eight lots have not been
built on. The resultant runoff coefficient for the 14.3 acres is 0.35 Since Lot 15 is at the low end of the
basin and near the discharge to the Cache la Poudre River we are not providing on site storm water
detention. The rate of runoff at the Northwesterly comer of Lot 15 is Q2,,, = 6.5 c.f.s. and Q100,, = 24.1
c.fs. The capacity of the street cross section is 68.45 c.f.s. at 6 inches over crown.
EROSION CONTROL:
The site is located in a moderate wind erodibility zone and in a high rainfall erodibility zone.
A silt fence will be required around the perimeter of the site prior to beginning any overlot grading.
Immediately after grading, the concrete building foundation will be installed and gravel road base shall
be placed in the driveways and parking areas. This road base shall be thick enough to handle
construction traffic without failure. Straw bales will be installed after the site is graded and before the
curb and gutter and asphalt is installed at the points where the runoff discharges into Midpoint Driv'.-.
This is a fairly small site and it will be very busy during building construction so vegetative plantings
will not be done until the building and paving procedures are nearing completion.
Wind erosion control on the site will be provided by the silt fence, building foundation and gravel
road base.
All erosion control procedures shall comply with the City of Fort Collins Criteria.
The stormwater runoff calculations, the Grading, Drainage and Erosion Control Plan and the overall
Utility Plan of Prospect Industrial Park showing the stormwater flows in Midpoint Drive are enclosed as
part of this report.
This drainage report and the design of the drainage system for Lot 15 are in compliance with the
City of Fort Collins Storm Drainage Specifications and Criteria. If you have any questions regarding
this report, please call.
Sincerely,
GisTE'q�; p4
* 5028
Richard A Rutherford, P.E. & L.S.
MF
STEWART86SSOCIATES
Consulting Engineers and Surveyors
September 21, 1998
Mr. Basil Hamdan
Storm Water Utility
City of Fort Collins
P.O. Box 580
Fort Collins, CO 80522-0580
Dear Basil,
The following is the Final Drainage Report for Lot 15, Prospect Industrial Park, City of Fort
Collins, County of Larimer, State of Colorado. The site is in the Poudre River Basin and contains
1.3724 acres. The existing site slopes from Northwest to Southeast at an approximate slope of 0.7%.
The site has a very good ground cover of grass and weeds.
It is proposed to divide Lot 15 into two new lots which each will have an office/warehouse building.
The site will be phased with Lot 15-A being Phase I and Lot 15-B begin Phase U.
The site is in the Poudre River Basin and is within approximately 1100 feet of the Cache La Poudre
River. Due to this close proximity to the River, it is proposed to not have storm water detention on
site. The runoff from the basin enters the outfall system to the River at the existing inlets at the comer
of Midpoint Drive and Sharp Point Drive. The Westerly inlet is only 450 feet Southeasterly of the
Southwest comer of Lot 15. The two inlets drain in a 24 inch R-C.P. to an existing gravel pit which
drains into the Cache La Poudre River.
The stormwater will be carried in the on -site curb and gutter to.the two driveways where it will
enter the Northeasterly gutter of Midpoint Drive at both driveways on the site. The Phase I Building is
Developed Basin-1 and the developed runoff rates for it are Qm = 1.93 c.£s. and Q,00 = 6.70 c.f.s. The
second phase is Developed Basin-2 and the developed runoff rates for it are QZn = 1.56 c.f.s. and Qloo n
= 4.68 c.f.s.
There is not any appreciable stormwater runoff entering this site from off site. Lots 10 & 11 which
are adjacent to the rear of Lot 15, drain Southeast onto Lots 13 & 14. Lot 16 has not been developed
at this time and some of its historic runoff will sheet flow onto D.B.-1 and D.B.-2. The grading on both
basins will accommodate the off -site flow through each basin to Midpoint Drive. The offsite flow onto
D.B.-1 is Qlao = 0.37 c.f.s. and onto D.B.-2 is Qloo = 0.57 c.f s.
There was some concern at the conceptual review meeting regarding the capacity of Midpoint Drive
to carry the stormwater runoff that discharges into it. The flow in the Midpoint Drive South and
Southwesterly gutter from Timberline Road to the North lime of Prospect Industrial Park is diverted to
the East in a pan across Midpoint Drive and then to an existing pond in the Prospect East Industrial
Park. The North and Northeast gutter of Midpoint Drive flows into the Specht Point Road, Prospect
Parkway and the above described pan. There is a high point in Midpoint Drive 110 feet South of the
James H. Stewart
and Associates, Inc.
103 S. Meldrum Street
P.O. Box 429
Ft. Collins, CO 80522
970/482-9331
Fax 970/482-9382
Table of Contents
1-2 Text of Report
3 Vicinity Map
4-9 Storm Water Runoff Calculations
10 Midpoint Drive Drainage Capacity
11-14 Erosion Control Calculations
15 Variance Request
Pocket Utility and Grading &
Drainage and Erosion Control Plan
Plat of Off -site Areas Draining to
Midpoint Drive
n
0
11
I
i
FINAL DRAINAGE REPORT
FOR
LOT 159 PROSPECT INDUSTRIAL PARK
POUDRE RIVER BASIN
PREPARED FOR
DOHN CONSTRUCTION, INC.
SEPTEMBER 21, 1998
PREPARED BY
STEWART & ASSOCIATES
103 SOUTH MELDRUM STREET
FORT COLLINS, CO 80521
TEL. 970-482-9331
FAX. 970-482-9382