Loading...
HomeMy WebLinkAboutPROSPECT INDUSTRIAL PARK, LOT 19 - PDP - 28-98E - DECISION - FINDINGS, CONCLUSIONS & DECISIONV1M•Itit.G✓� 1T� v&AU- 3wL� f-ttt'ti TV �b Tjg� � .,.. --o rya w.�► a_{t Gw Ylo -4rr /.vre�wesf Gnsj 17 GorP*►s•�cw� Z6 2 �•rj�oacr,t' i�i 47o-yVo-/e, DO t�.c, [Jo' � �'l f/r..,�r.►4b • �e„'kGd1.�_+_..-s_GD gb.S_'7S I ` P • I Prospect Industrial Park, Lot 19 (Holsinger Drywall) Administrative Hearing Findings, Conclusions, and Decision February 13, 2007 Page 4 of 4 C. The Prospect Industrial Park, Lot 19 (Holsinger Drywall), Project Development Plan complies with all applicable General Development Standards contained in Article 3 of the Land Use Code. DECISION The Prospect Industrial Park, Lot 19 (Holsinger Drywall), Project Development Plan, #28-98E, is hereby approved by the Hearing Officer without condition. Dated this 14th day of February 2007, per authority gran Eby Sections 1.4.9(E) and 2.1 of the Land Use Code. j y Cameron Gloss Current Plannin Prospect Industrial Park, Lot 19 (Holsinger Drywall) Administrative Hearing Findings, Conclusions, and Decision February 13, 2007 Page 3 of 4 FACTS AND FINDINGS The surrounding zoning and land uses are as follows: N: I — Existing industrial and office uses, including self storage E: I — Vacant S: I — Vacant W: I — Existing industrial and office uses. The property was annexed into the City in September 1973 as part of the East Prospect Street First Annexation. The property was platted as Lot 19 of the Prospect Industrial Park approved by City Council in October 1978. The site is currently undeveloped. 1. Compliance with Article 4 and the I Zoning District Standards: The Project Development Plan complies with all applicable requirements of Article 4 and the I Zoning District. The Staff Report summarizes the PDP's compliance with these specific standards and no specific evidence was presented to contradict the statements and conclusion of the staff report concerning compliance with Article 4 or the I District Standards. 2. Compliance with Article 3 of the Land Use Code — General Development Standards The Project Development Plan complies with all applicable requirements of Article 3 including the plat standards of Section 3.3.1. No evidence was presented to contradict the statements and conclusion of the staff report concerning compliance or to otherwise refute the compliance with Article 3. SUMMARY OF CONCLUSIONS A. The Prospect Industrial Park, Lot 19 (Holsinger Drywall), Project Development Plan is subject to administrative review and the requirements of the Land Use Code (LUC). B. The Prospect Industrial Park, Lot 19 (Holsinger Drywall), Project Development Plan satisfies the development standards of the I zoning district. Prospect Industrial Park, Lot 1y (Holsinger Drywall) Administrative Hearing Findings, Conclusions, and Decision February 13, 2007 Page 2 of 4 properly posted, legal notices mailed and notice published. PUBLIC HEARING The Hearing Officer, presiding pursuant to the Fort Collins Land Use Code, opened the hearing at approximately 4:00 p.m. on February 13, 2007 in Conference Room A at 281 North College Avenue, Fort Collins, Colorado. HEARING TESTIMONY, WRITTEN COMMENTS AND OTHER EVIDENCE: The Hearing Officer accepted during the hearing the following evidence: (1) Planning Department Staff Report; (2) application, plans, maps and other supporting documents submitted by the applicant and the applicant's representatives to the City of Fort Collins; (3) a sign up sheet of persons attending the hearing; and (4) a tape recording of discussion at the hearing. The LUC, the City's Comprehensive Plan (City Plan), and the formally promulgated policies of the City are all considered part of the evidence considered by the Hearing Officer. The following is a list of those who attended the meeting: From the City: Steve Olt, City Planner From the Applicant: Don Brookshire Brett Brown Mike Oberlander Doug Dohn From the Public: None, Written Comments: None Community Planning and Environmental L vices Current Planning Citv of Fort Collins CITY OF FORT COLLINS ADMINISTRATIVE HEARING OFFICER TYPE I ADMINISTRATIVE HEARING FINDINGS, CONCLUSIONS AND DECISION ADMINISTRATIVE HEARING DATE: February 13, 2007 PROJECT NAME: CASE NUMBER: APPLICANT: OWNER: HEARING OFFICER: PROJECT DESCRIPTION: Prospect Industrial Park, Lot 19 (Holsinger Drywall), Project Development Plan •:2 Eastpoint Studio LLC. C/o Don Brookshire 552 Kinnikinnik Court Windsor, CO 80550 Pat Hess 2655 Midpoint Drive, Unit 6 Fort Collins, CO 80525 Cameron Gloss Current Planning Director This is a request to construct a 9,050 building housing office, warehouse & storage unit uses. The property is 0.86 net acres and is located on the northeast side of Midpoint Drive, between Sharp Point Drive and Prospect Park Way. SUMMARY OF HEARING OFFICER DECISION: Approval ZONING DISTRICT: I- Industrial STAFF RECOMMENDATION: Approval NOTICE OF PUBLIC HEARING: Evidence presented to the Hearing Officer established. no controversy or facts to refute that the hearing was 281 North College Avenue • PO -Box 580 • Fort Collins, CO 80522-0580 9 (970) 221-6750 • FAX (970) 416-2020