HomeMy WebLinkAboutPROSPECT INDUSTRIAL PARK, LOT 19 - PDP - 28-98E - CORRESPONDENCE -If you have any questions regarding these issues or any other issues related
to this project, please feel free to call me at 221-6341.
Yours Truly,
Atk�
Steve Olt
City Planner
cc: Randy Maizland
Interwest Consulting Group
Current Planning file #28-98E
Page 7
Department: Stormwater-Water-Wastewater Issue
Contact: Roger Buffington
Topic: Water/Wastewater
Number: 25 Created: 1 / 16/2007
[ 1 / 16/07] OK for preliminary. More detail required at final.
Number: 29 Created: 1 / 18/ 2007
[ 1 / 18/ 07] Some thoughts for final compliance: Check sewer televising
records for info on sewer service location. Add a detail on reducing size of
water service (we have one that should work). Revise fire line and water
service where they turn and go into bldg so that domestic service is not
behind thrust block on fire line.
Department: Zoning Issue Contact: Jenny Nuckols
Topic: Zoning
Number: 1 Created: 1 / 3 / 2007
[ 1 / 3 / 07] 3.2.1(E) (2) (d) Foundation plantings are required on the easterly
side of the building
Number: 2 Created: 1 / 3 / 2007
[ 1 / 3 / 07] Note - Van accessible parking space needs a sign stating that it is
van accessible
Number: 3 Created: 1 / 3 / 2007
[ 1 / 3 /.07] I don't see a bike rack called out anywhere on the site plan -
please review and show location
Number: 4 Created: 1 / 3 / 2007
[ 1 / 3 / 07] I don't seea trash enclosure location yet there is reference one in
the general notes... please review.
This completes staff (and outside reviewing agencies) review and comments
at this time. Red -lined plans from City departments are included with this
comment letter.
Another formal round of staff review is not necessary before
scheduling and going to an administrative public hearing. However,
either a reylat_of the lot or the necessary easements to be
dedicated by separate documents must be submitted for review
before the hearing can be scheduled. The majority of the
comments expressed in this letter can be addressed with your Final
Compliance submittal.
Be sure and return all red -lined plans when you submit Final Compliance.
The number of copies of each document to submit for Final Compliance will
be provided to you by the City's Project Planner, upon request.
Page 6
Department: PFA Issue Contact: Carie Dann
Topic: Fire
Number: 23 Created: 1 / 16/ 2007
[1/ 16/071 FIRE LANE: PFA requires an emergency access easement to
ensure vehicles are not parked in such a way that obstructs access to the
north side of the proposed building, as well as access to the future
warehouse/storage. This EAE can be platted along approximately the first
100 feet of the drive aisle into the parking lot, and as such, won't require a
turnaround.
Number: 24 Created: 1 / 16/ 2007
[ 1 / 16/ 07] FDC: The fire department connection for the automatic fire
sprinklers shall be mounted remote from the building, in a location easily
accessible from either the fire lane or public street. Per our discussion, the
FDC may be located on the south side of the office building, in closer
proximity to the fire hydrant on Midpoint Drive.
Number: 28
[1/ 17/07] .
Created: 1 / 17/2007
Department: Stormwater-Water-Wastewater Issue
Contact: Basil Hamdan
Topic: Stormwater
Number: 26 Created: 1 / 16 / 2007
[ 1 / 16/ 07] The area covered by the detention pond area up to the 100 year
elevation should be dedicated as a drainage easement.
Letters of intent for the grading shown on Lot 18 and potentially Lot 20 are
needed prior to hearing. Easements would be needed at final.
Number: 27 Created: 1 / 16 / 2007
[ 1 / 16/ 07] Please state in the text portion of the report that the release rate
from the detention pond was set at the two year historic site. Please clarify
how detention requirements are being satisfied with the street flows being
undetained.
Please make sure that the pipe crossing the *entrance driveway will be strong
enough to handle HS 20 loading.
Clarify that the minimum opening elevation will be set at 1 foot above 100-
year surface elevation. Specify the spillway elevation on the detail shown.
Plans are OK for a preliminary, from Stormwater's perspective this item can
proceed to hearing once letter(s) of intent are submitted.
Page 5
Number: 12 Created: 1 / 9 / 2007
[ 1 / 9 / 07] Show and label all structures and improvements within 150 feet
of the site boundary per LCUASS Appendix E requirements.
Number: 13 Created: 1 / 9 / 2007
[1/9/07] All easement and ROW dedication documents must be submitted
for first review with review fees paid prior to scheduling a Type 1 hearing
for the project. The fee is $250 per document and shall include signed deeds
of dedication and legal descriptions stamped by a licensed surveyor.
Referenced reception numbers will need to be provided at final compliance
plan submittal.
Number: 14 Created: 1 / 9 /2007
[1/9/07] Please add the standard note for repair of damaged curb, gutter
and sidewalk to the Utility Plan sheet. Note attached to red -lines.
Number: 15 Created: 1 / 9 / 2007
[ 1 / 9 / 07] Please show how the new detached sidewalk connects to an
existing sidewalk to the east if one exists.
Number: 16 Created: 1 / 9 / 2007
[1/9/07] Clearly label or legend the approximate limits of street cut for the
sewer connection on Midpoint.
Number: 17 Created: 1 / 9 / 2007
[ 1 / 9 / 07] Please remove the 2 foot concrete drainage pan from the existing
utility easement along the north side of the property.
Number: 18 Created: 1 / 9 / 2007
[1/9/07] Provide the following standard typical details:
1..2 foot concrete drainage pan.
2. LCUASS standard high volume drive approach
3. Sidewalk culvert - sidewalk chase drain
4. LCUASS concrete sidewalk detail
5. Detail for 6 inch on -site curb & gutter
Number: 19 Created: 1 / 9 / 2007
[1/9/07] Please use slightly heavier line type for existing topo on the
Grading Plan so that it will copy well.
Number: 20 Created: 1 / 9 / 2007
[1/9/07] Add the standard statement regarding foundation elevations,
section II.E. from LCUASS Appendix E to the Grading Plan sheet.
Number: 21 Created: 1 / 9 / 2007
[1/9/07] See minor comments on Site Plan red -line.
Page 4
Number: 34 Created: 1 / 18/2007
[1/ 18/07] The standard landscape assurance note, per Section 3.2.1(I)(4) of
the Land Use Code, must be added to the Landscape Plan.
Topic: Utilities
Number: 30 Created: 1/ 18/2007
[ 1 / 18 / 07] Len Hilderbrand of Xcel Energy indicated that they have a 2"
gas main located on the southwest side of Midpoint Drive.
Department: Engineering Issue Contact: Randy Maizland
Topic: Engineering
Number: 5 Created: 1 / 9 / 2007
[1/9/07] The PDP review fee was underpaid by $215. The acreage cost was
not calculated at $250 x 0.86 acres. This $215 will be collected at final
compliance plan submittal. See copy of TDRF fee calc. sheet attached to
redlines.
Number: 6 Created: 1 / 9 / 2007
[ 1 / 9 / 071 Variance no. 1 for parking setback is not approved. Justification
is not adequate for approval. Please see comments on variance request
attached to red -lines.
Number: 7 Created: 1 / 9 / 2007
[1/9/07] Variance no. 2 is approved for driveway separation distances.
Number: 8 Created: 1 / 9 / 2007
[1/9/07] Please provide LCUASS Appendix E General Notes and
Construction Notes in the Utility Plan set. General Notes are typically
shown on the cover sheet or sheet 2. Please include benchmark information,
geotechnical reference and variance information in the General Notes.
Revise the sheet index if needed.
Number: 9 Created: 1 / 9 / 2007
[ 1 / 9 / 07] Please add a standard revision block to all sheets in the title block
section on the right side TYP.
Number: 10 Created: 1 / 9 / 2007
[ 1 / 9 / 07] Please add the geotechnical engineer's information in the
consultants section on the cover sheet. Add the month and year under the
title and legal description on the cover sheet.
Number: 11 1 Created: 1/9/2007
[1/9/07] Please label all existing items being shown on the Utility Plan
sheet. Use labeling or legend line types consistently.
Page 3
d. The variance request for the parking setback from Midpoint Drive was
not approved.
Poudre Fire Authority/ Carie Dann
a. A fire hydrant must be located within 100' of the fire sprinkler
connection for the building.
b. A fire lane must be designated and dedicated on the plat for the 24'
wide driveway between Midpoint Drive and the Vehicle Staging &
Maneuvering Area.
Stormwater/Basil Hamdan
a. Dedicate a drainage easement for the 100-year water surface area.
b. The drainage report should better state the storm drainage intent for
this project.
c. A letter of intent is needed, before scheduling a public hearing, for the
off -site easement on Lot 20, to the southeast.
Transportation Planning/David Averill
a. A Type III barricade is needed at the end of the new sidewalk at the
southeast corner of the site.
Current Planning/ Steve Olt
a. A replat of Lot 19, providing all the necessary easements, could be
submitted to the City for review and approval in lieu of the various
separate documents to dedicate these easements. There would be no
additional fee to the City for the replat. It would just become one of the
typical PDP documents to be reviewed.
Topic: Landscaping
Number: 32 Created: 1 / 18/2007
[ 1 / 18/ 07] A copy of the comments received from Tim Buchanan, the City
Forester, is attached to this comment letter.
Number: 33 Created: 1 / 18 / 2007
[ 1 / 18/ 07] Additional landscaping must be included in the landscape
islands that separate the parking area from the larger Vehicle Staging &
Maneuvering Area to provide screening of that large area from Midpoint
Drive.
Page 2
Eastpoint Studio LLC
c/o Don Brookshire
552 Kinnikinnik Court
Windsor CO 80550
Date: 01 / 18/ 2007
i
Staff has reviewed your submittal for HOLSINGER DRYWALL, PROSPECT
INDUSTRIAL PARK, LOT 19 - PDP (TYPE 1), and we offer the following
comments:
ISSUES:
Department: Current Planning Issue Contact: Steve Olt
Topic: Building
Number: 31 Created: 1 / 18 / 2007
[ 1 / 18/ 07] Rick Lee of the Building Department indicated that he is
forwarding to the applicant a copy of the Codes and Standards that the
Building Department will enforce. Please note that a Pre -submittal Code
Review Meeting is required before submitting for a building permit.
Department: Advance Planning
Topic: Engineering
Number: 22
[1/9/07] No comment.
Issue Contact: Pete Wray
Created: 1 / 9 / 2007
Department: Current Planning Issue Contact: Steve Olt
Topic: General
Number: 35 Created: l / 18 / 2007
[1/ 18/07] If there is to be any fencing for this development the location(s)
must be shown on the Site 8v Landscape Plans and a detail for the fencing
design must be provided on one of the development plans.
Number: 36 Created: 1 / 18 / 2007
[1/ 18/07] The following comments were expressed at staff review on
Wednesday, January 17, 2007:
Engineering/Randy Maizland
a. The Transportation Development Review Fee (TDRF) paid at time of PDP
submittal is $215 short of what should have been paid. That amount
will be added to the TDRF paid at time of Final Compliance submittal.
b. The standard general notes on utility plans must be added.
d. Standard details on the utility plans must be provided.