Response to Staff Comments
Prospect Industrial Park Lot 15
Page 2
4. Acknowledged
5. Acknowledged.
6. Acknowledged.
7. The drainage calculations have been redone.
8. Site distance easements are on the site plan and have been added to the
landscape plan.
9. Curb returns, easements and utilities locations have been coordinated
between the site and landscape plans and utility plans.
10. The oil and sand separator has been shown on the site and landscape
plans.
11. The location of existing transit stops have been described in a note on the
site plan.
12. A 28' Access Easement has been added along the rear property line
13. The fence has been moved out of the utility easement and on to the
property lines.
14. The trash enclosure has been modified to include recycling.
15. A note stating, `If hazardous materials are to be used or stored on the
project site, a HMIA, Hazardous Materials Impact Analysis will be
completed at time of building pernut' has been added to the site plan.
16. Earth berms and retaining walls for both buildings have been included on
the grading plan.
If you have any questions regarding the revisions or these comments, please call.
Sincerely,
VF RIPLEY ASSOCIATES, Inc.
,41&, ��l'
Allan Gill, ASLA
January 19, 1999
Steve Olt
Planning Department
281 North College Avenue
Fort Collins, CO 80524
Re: Response to staff comments:
Prospect Industrial Park Lot 15
Dear Steve,
s1 �H
We have reviewed staff comments dated Oetobe ,and have the following
comments:
1. The fence has been moved to the property line.
2.
a.
The trash enclosure has been modified to include recycling. An
elevation of the trash enclosure is located on the architectural
elevation sheet, (sheet 4 of 5), plan information is located on the
site plan, (sheet 1 of 5).
b.
A note stating, `If hazardous materials are to be used or stored on
the project site, a HMIA, Hazardous Materials Impact Analysis
will be completed at time of building permit' has been added to
the site plan.
3.
a.
Service areas are not intended to be used for outdoor storage.
b.
Buildings A and B will share the trash enclosure. Plan
information for the trash enclosure is located on the site plan
(Sheet 1 of 5), and architectural elevations on (sheet 4 of 5).
C.
An additional tree has not been added to the easterly, or rear side,
property line for Building A due to a utility conflict. A sewer line
runs along the property line.
d.
Plan information for the trash enclosure is located on the site plan
(sheet 1 of 5). An elevation of the trash enclosure is located with
the architectural elevations (sheet 4 of 5).
e.
Acknowledged.
f.
Trees have not been added in the landscape setback area along the
property line adjacent to United Van Lines due to a conflict with
utilities. A sewer line runs along the property line.
g.
After contacting Peter Barnes regarding "full tree stocking",
additional tares were added to the back of Building B due to the
buildings high visability next to an undeveloped lot. An additional
tree was also added to the front of the building near the painted
crosswalk.