HomeMy WebLinkAboutPROSPECT INDUSTRIAL PARK, LOT 15 - PDP - 28-98 - CORRESPONDENCE - REVISIONS (3)VF Ripley Associates, Inc.
Response to Staff Comments
Prospect Industrial Park Lot 15
Page 2
6. Acknowledged.
7.
a. See engineering.
b. See engineering.
C. See engineering.
8. See engineering.
9. See engineering.
10. See engineering.
11. The sidewalk along Midpoint Drive is detached and 5' wide. Utility plans
have been revised.
12. The parking space on the westerly side of Building A has been revised to
improve visability and the setback along Midpoint Drive.
13. Acknowledged.
Note, additional trees requested by staff have not been added along the east
side of the property due to a sewer line running along the property boundary.
If you have any questions regarding the revisions or these comments, please call.
Sincerely,
VF RIPLEY ASSOCIATES, Inc.
Allan Gill, ASLA
November 24, 1998 -
Steve Olt
r
OF
/0,
Planning Department
,�
281 North College Avenue
V F R I P L E Y
Fort Collins, CO 80524
ASSOCIATES INC.
Landscape Architecture
Re: Response to staff comments:
urban Design
Prospect Industrial Park Lot 15
Planning
Dear Steve
1113 Stoney Hill Drive
1-on Collins. Colorado 80525
PHONE (970) 224-5828
We have reviewed staff comments dated October 21, 1998, and have the following
FAX (970) 224-1662
comments:
t. Acknowledged.
2. The relationship of building B to the street has been revised in order
to meet the requirements of the LUC. The building has been moved
closer to Midpoint Drive and maintains a distance of 15 feet minimum
from the revised right of way, per Section 3.5.3(B)(2)(b) of the LUC.
Land uses included in the PDP are as follows;
Building A- Light Industrial/ Warehouse
Building B- Office/ Industrial
3.
a. The buildings will be fire sprinklered, as noted on the site plan.
b. Acknowledged.
C. Both buildings will be fire sprinklered, as noted on the site plan.
d. The nearest existing fire hydrant is located across the street and is
easily within 300' of both buildings. See engineering drawings
forlocation.
4.
a. After meeting with planning staff, it was concluded that the
bicycle racks would remain where they are.
b. Land uses proposed for building B are industrial and/or office
land uses as defined by City Code. This building will potentially
be used as a warehouse with associated office activities.
C. There will be a maximum of 48 people employed in these
buildings.
d. A trash enclosure detail is included on the elevation sheet, sheet 4
of 6.
e. The service area behind building B is not intended to be a parking
lot, however, the area has been screened with a 6' wood privacy
fence.
5. Acknowledged.