HomeMy WebLinkAboutPROSPECT INDUSTRIAL PARK, LOT 15 - PDP - 28-98 - CORRESPONDENCE - REVISIONSVF Ripley Associates, Inc.
Response to Staff Comments
Prospect Industrial Park Lot 15
Page 3
16. The civil engineer has addressed this comment.
17. The access points into this site have been revised. The most southerly
entrance aligns with the entrance to the adjacent site. Included with this
round of revisions is a memo explaining the traffic analysis.
18. The entrance most northerly to the site has been revised into order to
maintain a minimum of 50 feet from the street flowline to the first
parking space. The area has been nicely landscaped.
19. Bicycle parking for both building A and B has been located in front of
these buildings.
20. The landscape plan has been revised to comply with the Landscaping and
Tree standards as set forth in Division 3.2 of the LUC.
21. Land uses proposed for Building A are industrial land uses as defined by
the City Code. As you are aware industrial land uses are exempt from
"build to" lines, however, Section 4.23(E)(2)(b)2 of the I -Industrial Zone
District states that side and rear yards are to be used for operation and
storage areas and front yards shall be used for less intensive automobile
parking. The proposed site plan for Building A does precisely that. A
service drive east of the building leads to a service yard behind the
building. A small parking lot in front of the building provides parking
for nine cars.
22. Acknowledged.
If you have any questions regarding the revisions or these comments, please call.
Sincerely,
VF RIPLEY ASSOCIATES, Inc.
C_v
NG.���
Claudia Sampson
VF Ripley Associates, Inc.
Response to Staff Comments
Prospect Industrial Park Lot 15
Page 2
g. The pedestrian walkways will consist of concrete crosswalks at
the two entrances into the site and painted crosswalks will be
located on the interior crosswalk areas.
h. The service area behind building A will be landscaped tightly
with Virginia Creeper. Due to the location of the service area and
the maintenance issue, landscaping has been kept to a minimum
since it would be a maintenance problem. There is also a sanitary
sewer line that runs along the property line. In order to maintain
the proper city distance requirements for shrubs and trees, large
quantities of plant material could not be added in that area.
i. The buildings in this development will consist of Building A as
being Light Industrial/Warehouse and Building B will be
Industrial/Office.
j. Building B has been shifted closer to the front property line. The
shift does allow the building envelope clearance from the sewer
easement.
6. Acknowledged.
7. Acknowledged.
g. Acknowledged.
9. Acknowledged.
10. Note number 5, on the site plan, has been revised to commit to the
rooftop and ground -mounted mechanical equipment's compliance with
Section 3.5.1(J) of the LUC.
it. Bicycle parking has been added at the front of building A.
12. The landscape plan has been revised to comply with the Landscaping and
Tree standards as set forth in Division 3.2 of the LUC.
13.
a. The buildings in this development will consist of Building A as
being Light Industrial/Warehouse and Building B will be
Industrial/Office. The relationship of building B to the street has
been revised in order to meet the requirements of the LUC. The
building has been moved closer to Midpoint Drive and maintains
a distance of 15 feet maximum from the right of way, per Section
3.5.3(B)(2)(b) of the LUC.
b. The sidewalk leading from Midpoint Drive interior to the site has
been revised per the redlined drawings. Please refer to the site
and landscape plans for the new location.
C. Acknowledged.
14. Acknowledged
15. The civil engineer has addressed the drainage report comments.
September 1, 1998
�h
Steve Olt
_
Planning Department
281 North College Avenue
V F R I P L E Y
Fort Collins, CO 80524
ASSOCIATES INC.
Landscape Architecture
Re: Response to staff comments:
Urban Design
Prospect Industrial Park Lot 15
Planning
Dear Steve,
1113 Stoney Hill Drive
Fort Collins. Colorado 80525
PHONE (970) 224-5828
FAX (970) 224-1662
We have reviewed staff comments dated August 10, 1998, and have the following
comments:
1. Ok.
2. The relationship of building B to the street has been revised in order
to meet the requirements of the LUC. The building has been moved
closer to Midpoint Drive and maintains a distance of 15 feet
maximum from the right of way, per Section 3.5.3(B)(2)(b) of the
LUC.
3. The buildings in this development will consist of Building A as being
Light Industrial/Warehouse and Building B will be Industrial/Office.
4.
a. The buildings will be fire sprinklered, as noted on the site plan.
b. Acknowledged.
C. The buildings will be fire sprinklered, as noted on the site plan.
d. There will not be any type of Hazardous Materials on this
proposed site.
4. Acknowledged.
5. Acknowledged.
6.
a. A bike rack has been located near building B.
b. The bike rack for building A has been located near the building
entrance. � V'W, rc e.�/
C. Additional handicap ramps have been located throughout the site,
please refer to the site plan for these locations.
d. The proposed trash enclosure will be sufficient for both buildings. old
e. The proposed fence will be a 6 foot shadow box fence. A detail
of this fence has been shown on the landscape plan.
f. The proposed sidewalk along Midpoint Drive will be attached to
remain consistent with the surrounding sites. Additional street
trees have been added along Midpoint Drive, please refer to the
landscape plan for locations.