Loading...
HomeMy WebLinkAboutLARIMER COUNTY COURTHOUSE - FDP - 37-98B - SUBMITTAL DOCUMENTS - ROUND 1 - GEOTECHNICAL (SOILS) REPORTGeotechnical.Engineering Exploration Terracon Larimer County Facilities Project No. 20965087 TABLE OF CONTENTS (cont'd) J APPENDIX A Site Plan and Boring Location Diagram Logs of Borings APPENDIX B Laboratory Test Results ] APPENDIX C General Notes APPENDIX D Pavement Notes iv Terracon TABLE OF CONTENTS Page No. Letterof Transmittal.................................................................................................................. ii INTRODUCTION.................................................................................................................1 PROPOSED CONSTRUCTION..........................................................................................1 SITEEXPLORATION..........................................................................................................2 FieldExploration...................................................................................................... 2 LaboratoryTesting................................................................................................... 3 SITECONDITIONS.............................................................................................................3 SUBSURFACE CONDITIONS.............................................................................................3 Geology...............................................:................................................................... 3 Soil and Bedrock Conditions....................................................................................4 Field and Laboratory Test Results........................................................................... 5 GroundwaterConditions.......................................................................................... 5 CONCLUSIONS AND RECOMMENDATIONS.................................................................... 5 Geotechnical Considerations...................................................................................5 FoundationSystems.................................................................................................5 Basement Construction........................................................................................... 8 Lateral Earth Pressures...........................................................................................10 Seismic Considerations...........................................................................................10 Floor Slab Design and Construction........................................................................11 Pavement Design and Construction.........................................................................12 Earthwork................................................................................................................15 Site Clearing and Subgrade Preparation......................................................15 Excavation...................................................................................................16 FillMaterials.................................................................................................16 Placement and Compaction.........................................................................17 Compliance..................................................................................................18 Excavation and Trench Construction............................................................18 Drainage........................................................................................:................I........19 SurfaceDrainage.........................................................................................19 Subsurface Drainage...................................................................................19 Additional Design and Construction Considerations ........................................... :..... 20 Exterior Slab Design and Construction......................................................... 20 Underground Utility Systems........................................................................20 CorrosionProtection.................................................................................... 21 GENERALCOMMENTS..................................................................................................... 21 F E July 8, 1996 Larimer County Facilities P. O. Box 1190 Fort Collins, Colorado 80522 Attn: Mr. Dick Anderson Irerracon 301 N. Howes • P.O. Box 503 Fort Collins, Colorado 80521-0503 (970)484-0359 Fax: (970) 484-0454 Re: Geotechnical Engineering Report Larimer County Justice Center - Block 31 City of Fort Collins, Colorado Project No. 20965087 Terracon Consultants Western, Inc., Empire Division has completed a geotechnical engineering exploration for the proposed Justice Center located in Block 31, City of Fort Collins, Colorado. This study was performed in general accordance with our proposal number D2096092 dated April 25, 1996. The results of our engineering study, including the boring location diagram, laboratory test results, test boring records, and the geotechnical recommendations needed to aid in the design and construction of foundations and other earth connected phases of this project are attached. J The soils at the site consist of clayey sands and sandy lean clay underlain by well -graded sand with gravel and cobbles. The upper subsoils are overlain by asphalt pavement and gravel base and underlain by siltstone-claystone bedrock found from 11 to 1S feet beneath the ground surface. Groundwater was encountered at relatively shallow depths of 6'/: to 10'/z feet below the surface. Based on the anticipated multi -story construction, it is recommended the structures be supported by a drilled pier foundation system founded on the firm bedrock stratum. Complete dewatering systems will be 1 required where basements are constructed at the site. Further details are provided in this report. 7 We appreciate the opportunity to be of service to you on this phase of your project. If you have any questions concerning this report, or if we may be of further service to you, please do not hesitate to contact us. Sincerely, TERRACON CONSULTANTS WESTERN, INC. Empire Division-- �, Senior Engineering I Reviewed by: am J. Attwooll, P.E. Office Manager Arizona ■ Arkansas III Colorado ■ Idaho ■ Illinois III Iowa ■ Kansas ■ Minnesota III Missouri ■ Montana t Nebraska III Nevada E New Mexico E NorthDakofa N Oklahoma 0 Tennessee 0 Texas 0 Utah E Wisconsin E Wyoming yam, Duality Engineering Since 1965 GEOTECHNICAL ENGINEERING REPORT LARIMER COUNTY JUSTICE CENTER BLOCK 31 CITY OF FORT COLLINS, COLORADO PROJECT NO.20965087 July 8, 1996 Prepared for: LARIMER COUNTY FACILITIES P. O. BOX 1190 FORT COLLINS, COLORADO 80522 ATTN: MR. DICK ANDERSON Prepared by. Terracon Consultants Western, Inc. Empire Division 301 North Howes Street Fort Collins, Colorado 80521 Irerracon