Loading...
HomeMy WebLinkAboutCOURTYARD COMMONS (TO LANDINGS BAY) - PDP - 38-98 - CORRESPONDENCE - REVISIONS (3)Steve Olt March 16, 1999 Page 4 blanket easement over the entire site except for specific tracts identified on plat on which individual buildings will be located. Steve, if you have any additional needs or questions with regard to this project or these responses to your comments, please let me know. Thanks for your assistance. Best regar s, VnP y President JP:jl Enclosures Steve Olt March 16, 1999 Page 3 a) North into adjacent Landings Office Park, west through such park to Landings Bay offices, and b) North along JFK sidewalk to Landings Bay Office Park entrance. Furthermore, this project has been designed to integrate both pedestrian and vehicle access with the adjacent Landings Office Park to the south. Fire and Engineering Access. We have met with Fire and Engineering and are in consensus with regard to all matters relating to fire, access, and engineering, and in particular have modified radiuses as necessary to improve emergency and fire access as requested. Water & Sewer. The final Utility Plans will reflect changes requested by Water & Sewer. Storm Water. Regarding Storm Water's comments: a) an off -site grading easement is being obtained from Landings Office Park Owners Association, b) if smaller detention pond rip rap is used it will be covered and re -seeded, or in the alternative, oversize rip rap will be used precluding such requirement, c) ditch company approvals have been received as required, and d) our engineers have met with Storm Water and all of the storm water requirements are being met as we have agreed. Pedestrian Refuge Pad. We will construct and pay for a pedestrian refuge pad in the center of JFK parkway as per the design which has been provided to us by the City. New Subdivision Plat Language. New subdivision plat language will be included on the final plat. Fire Sprinklers. All residential buildings shall be fire sprinklered and fire alarmed. Landscaping. All landscaping has been adjusted and relocated as necessary to respect requirements of all utilities providers. Street Trees. It has been concluded that all street trees will be deciduous shade trees as per usual City requirements. These are most appropriate from both pedestrian and aesthetic standpoints and can be moved in the future if necessary. Accordingly, no ornamental trees will be used as street trees. Utility Easement. The fifteen foot utility easement requested by Engineering is not required along JFK according to our legal advisors, as we are providing a Steve Olt March 16, 1999 Page 2 Residential Building Heights. Residential building heights have been carefully analyzed and designed with regard to LUC Section 3.8.17(A)(1) and such residential units do not exceed 40 feet in height. Elevations have been more clearly drawn and marked to indicate elevations on front, back and sides of such buildings to more clearly enable these calculations to be computed. Building Tracts. It is our intention, both for the office buildings and the residential buildings, to designate a parcel of ground with respect to each such building, which parcel shall be a legally separate tract for ownership purposes and furthermore shall operate de facto as the building envelope with liberal consideration for minor building deviations in the construction process so that such possible deviations do not fall outside the tract, causing title problems. Furthermore, such designation of tracts enables the entire balance of the property a) to be held in fee title ownership by the respective owners associations, and b) to be subject to a blanket utility easement for all utility providers including water, sewer, storm water, electric, telephone, cable, and other. Handicapped Pedestrian Access. Handicapped pedestrian access through the center of the project site on a northeast — southwest axis is not possible because of the substantial grade (vertical drop) which exists on the site parallel to this axis. We have looked closely at the proposed idea of a switchback design to achieve access along this axis and have concluded that it is not possible because: a) When designed properly the grade does not meet handicapped requirements, b) When engineering and construction considerations relating to switchback landings and minimum setback from buildings are evaluated, the design is not possible or efficacious, and c) The location is unacceptable because of the impact a switchback design would have on the utilities located under such switchback, which utilities have been routed to achieve City looping and access requirements. We have met with Transportation several times regarding all questions of pedestrian access to or movement through the site. We have been able to make numerous modifications eliminating steps wherever possible. Our plan reflects optimum achievable handicapped access from the residential portion to the office portion as follows: March 16, 1999 Steve Olt, Project Planner City of Fort Collins P. O. Box 580 Fort Collins, CO 80522 Re: Landings Bay Project Development Plan Dear Steve: In response to your comments in your letter dated March 2, 1999: Modification. Enclosed please find a revised copy of our modification request deleting the request for modification as it relates to the office use, as this is not necessary subsequent to the December, 1998 code change. Ditch. We have met with and reviewed our plans with the Larimer County Canal #2 President, John Strachan, and ditch rider John Moen, and have forwarded letters of agreement from them to you over the last several months. We understand that Gene Fischer, the ditch company attorney, is preparing an agreement formalizing all aspects of our understandings which must be executed by both parties prior to ditch company sign -off on final subdivision plat and utility plans. Trash Enclosures. There are two trash enclosures for the office buildings and four trash enclosures for the residential buildings. Each trash enclosure complies with necessary requirements for convenient trash enclosure access, suitable trash service to meet the respective office and residential needs, provision for recycling containers, and consideration for landscaping and aesthetics relating to such enclosures. We have consulted with and followed the recommendations of Zoning, Natural Resources, and Waste Management, Inc., our waste management consultant for this project. Furthermore, we have double checked and in some places modified the designs of all trash enclosures and pads to insure easy access and no blockage or encroachment into areas required for garage access or vehicle movement. 3307 South College Avenue, Suite 200, Fort Collins, CO 80525 • (970) 226-5000 • Fax (970) 226-5125