HomeMy WebLinkAboutCOURTYARD COMMONS - PDP - 38-98 - CORRESPONDENCE -27. Depending on how the building height is determined, the residential
buildings may exceed 40' in height, requiring a Building Height Special
Review as part of this development review. Please contact the Zoning
Department for assistance. Their phone number is 221-6760.
28. More masonry/stone should be used on the residential building elevations.
29. Additional comments are included on a red -lined set of Site, Landscape, and
Building Elevation Plans.
This completes the staff comments at this time. Additional comments will be
forthcoming as they are received from City departments and outside reviewing
agencies.
Under the development review process and schedule there is no revision date
mandated by the City. The amount of time spent on revisions is up to the
applicant. Upon receipt, the revisions will be routed to the appropriate City
departments and outside reviewing agencies, with their comments due to the
project planner no later than the third weekly staff review meeting (Wednesday
mornings) following receipt of the revisions. At this staff review meeting the item
will be discussed and it will be determined if the project is ready to go to the
Planning and Zoning Board for a decision. If so, will be scheduled for the nearest
Board hearing date with an opening on the agenda.
Please return all drawings red -lined by City staff with submission of your revisions.
The number of copies of revisions for each document to be resubmitted is on the
attached Revisions Routing Sheet. You may contact me at 221-6341 to schedule a
meeting to discuss these comments.
S' cerely,
eve 1
Project Planner
cc: Engineering
Stormwater Utility
Zoning
Water & Wastewater
Traffic Operations
Transportation Planning
Advance Planning
Lagunitas Company
Northern Engineering
King Surveyors Inc.
"�+Pro�ec�ile .
and D to the Larimer County Canal No. 2. The buildings appear to be too
close to the canal, not allowing for ditch company access along the canal.
There apparently is no existing easement for the canal and, although an
access easement is prescriptive, one must be dedicated with this
development.
17. There is no drainage swale along the back of residential Buildings B, C, and
D and, therefore, some of the drainage from the buildings is going directly
into the canal. This is not allowed.
18. There are no overflow swales for the piping system.
19. This development cannot use JFK Parkway for conveyance for its .
stormwater.
20. The subdivision plat and utility plans will require signatures from the
Larimer County Canal No. 2 Ditch Company.
Engineering
21. Another 7.5' of right-of-way for JFK Parkway is needed on this property.
22. Additional right-of-way for Landings Drive is needed.
23. Intersection details for the access drives into the development from JFK
Parkway and Landings Drive are needed on the utility plans. Only driveway
details are presently shown.
Planning
24. The site really appears to be maximized, from a building and hardscape
standpoint. There is no reasonable, usable, centrally located open space in
the residential portion of the development and the separation/buffer between
the residential and office portions of the development is sparce.
25. The main driveway and parking areas through the residential portion of the
development is very wide, with few trees and landscape pockets. Even though
the parking areas are to be scored, tinted concrete (for effect), it is still a
large mass of unbroken hard surface materials.
26. There appears to be a deficiency of handicapped ramps throughout the
development, especially along the main private drive through the residential
portion and around and to Buildings A through D.
13. Roger Buffington of the Water/Wastewater Department offered the
following comments:
a. Show all water/sanitary sewer mains and services on the Landscape
Plans.
b. Coordinate the landscape design with the civil design and provide
required landscape/utility separation distances on the Landscape Plan.
C. Curb stops must be located in utility easements and may not be
located in drives, sidewalks or other impervious surfaces.
d. Provide 5' of separation between meter pits and buildings.
e. Will an irrigation tap or fire lines be needed for this development?
f. Provide complete details for each water main lowering.
g. Include this note on the Site Plan:
Any work to water and/or sewer lines which require removal of
decorative surfacing shall be repaired with asphalt patch and
shall be the owners responsibility to repair decorative surfacing.
h. For reliability, the water main in the southwest area must loop back to
another part of the distribution system, such as the Landings Office
Park.
I. See the red -lined Site, Landscape, and utility plans for additional
comments.
14. A copy of the comments received from Basil Hamdan of the Stormwater
Utility is attached to this letter. See the red -lined copies of the drainage
report and utility for additional comments.
15. A copy of the comments received from Mark McCallum of the Engineering
Department is attached to this letter. See red -lined copies of the Site Plan
and utility plans for additional comments.
The following comments and concerns were expressed at the weekly staff meeting
on September 9, 1998:
Stormwater
16. There is a major concern about the proximity of residential Buildings B, C,
7. Janet McTague of the Light & Power Department stated that a C-1
Commercial Form is needed for the office buildings and the transformer
locations for both the office and residential portions of the development must
be coordinated with Light & Power.
8. Eric Bracke, the City's Traffic Engineer, stated that the -Landings Drive -"
access into the residential portion of the development must be changed to
pedestrian & bicycle only.
9. A copy of the Water Conservation Standards for Landscapes - COMMENT
SHEET received from Laurie D'Audney, the City's Utility Education
Specialist, is attached to this letter.
10. Tim Buchanan, the City Forester, offered the following comments:
a. Add parking lot screening.
b. Change street tree species to a City approved type. Select a species
from the attached Street Tree List.
C. Additional comments are on marked -up copies of the Landscape Plan.
Please contact Tim, at 221-6361, if you have questions about these
comments.
11. Kathleen Reavis of the Transportation Planning Department stated
that, regarding the Transportation Impact Study (TIS), due to missing
sidewalk segments the project is not meeting the Pedestrian Level of Service
requirement for "continuity" to adjacent residential northeast of this site. We
need to see how the City and the applicant can work together to complete
basic pedestrian connections. It maybe can be solved by providing street
crossings where appropriate to connect with existing sidewalks. Please see
notes on the red -lined Site Plan regarding additional sidewalk connections.
12. Jim Slagle of Public Service Company offered the following comments:
a. Any rerouting of existing PSC facilities caused by this development
will be at the developer's expense.
b. More than likely, PSC mains and services will be in the parking and
asphalt areas.
C. A utility coordination meeting may be very helpful.
component far exceeds the allowed 25%; therefore, a modification will
be required.
Please contact Jenny, Peter, or Gary at 221-6760 if you have questions about
these comments.
4. A copy of the comments from Sharon Getz of the Building Inspection
Department is attached to this letter.
5. Ron Gonzales of the Poudre Fire Authority offered the following
comments:
a. Fire apparatus access roads shall be provided for every facility, .
building or portion of a building hereafter constructed or moved into or
within the jurisdiction when any portion of the facility or any portion
of an exterior wall of the first story of the building is located more than
150' from fire apparatus access as measured by an approved route
around the exterior of the building or facility. This fire lane shall be
visible by painting and signage, and maintained unobstructed. A fire
lane plan shall be submitted for approval prior to installation. Any
building not meeting this criteria shall be fire sprinklered.
b. Address numerals shall be visible from the street fronting the
property, and posted on a contrasting background (example: bronze
numerals on a brown brick are not acceptable).
C. Fire hydrants are required with a maximum spacing of 600' along an
approved roadway. Each hydrant must be capable of delivering
1,000 gallons of water per minute at a residual pressure of 20 psi.
Hydrants shall be of an approved type as defined by the water
department and the fire department. No commercial building can be
greater than 300' from a fire hydrant.
d. All residential units of three or more stories, as measured from the
point of access, are required to be fire sprinklered and fire alarmed.
This includes Buildings A, B, C, D, E, F, G, and H.
Please contact Ron, at 221-6570, if you have questions about these comments.
6. Ken Jackson of the Police Department stated that this development needs
to be renamed. "Courtyard Commons" will create a 4th "Courtyard" within
this area of town. The others are Marriott's Courtyard, Miramont's
Courtyard, and Paragon's Courtyard.
writing by the applicant, and the Planning and Zoning Board then has
the authority to approve or deny the request.
b. The four downhill residential buildings (A, B, C, and D) do not appear
to have handicapped accessible sidewalks from the streets (sheet 1 of 8
of the Site Plan set). -
C. Locate permanent (anchored down) bicycle racks near the entrances to
office Buildings 1 - 5. They should be in convenient locations that do
not hinder pedestrian movement on the walks.
d. The parking lot pole light placements should be shown on the Site and
Landscape Plans.
e. Locate permanent (anchored down) bicycle racks near the entrances to
the residential buildings.
f. Add a shade tree behind residential Building B, the left end (westerly)
units.
g. Add a couple of deciduous trees behind residential Building C. East of
the sidewalk would be OK.
h. The office building elevations (all four sides) must be submitted to the
City for review. At the time of revisions submittal is acceptable.
It is assumed that the objects in the two islands in the middle of the
office buildings parking lot are trash enclosures. Please label what
they are on the Site Plan.
k. What is the actual parking space dimension in the scored, tinted
concrete areas in front of residential Buildings E, F, G, and H? The
depth appears to be 1T, how are the widths determined? Is this "free
for all" parking?
1. Platting the building envelopes is not wise. If the applicant decides to
leave the envelopes on the subdivision plat, then put the line
dimensions on sheet 2 of 2 and take them out of the tables on sheet 1 of
2.
in. Painted lines will be required to define parking spaces on the scored,
tinted concrete parking areas.
n. The E - Employment District limits the amount of residential uses to
no more than 25% of the area of the development plan. The residential
Commur" Planning and Environmental c
Current Planning
City of Fort Collins
September 16, 1998
Linda Ripley
VF Ripley Associates, Inc.
1113 Stoney Hill Drive
Fort Collins, CO. 80525
Dear Linda,
vices
Staff has reviewed your documentation for the COURTYARD COMMONS,
Project Development Plan (PDP) development proposal that was submitted to
the City on August 11, 1998, and would like to offer the following comments:
1. This development proposal, being in the E - Employment Zoning District, is
identified as a Planning and Zoning Board (Type II) review under the City's
Land Use Code (LUC). Residential uses are permitted uses subject to a Type
II review in the District. Office uses are permitted uses subject to an
administrative (Type I) review; however, residential and commercial/retail
(office) uses are defined as Secondary Uses in Section 4.22(D)(1) Land Use
Standards of the LUC and these uses shall occupy no more than 25% of the
total gross area of the development plan. They obviously make up about 70%
of the overall size of the property (excluding the detention area and Larimer
County Canal No. 2); therefore, a modification of the standard is necessary
and must be requested by the applicant. A modification request has been
submitted to the City and is being reviewed by staff.
2. Dennis Greenwalt of TCI of Fort Collins (cable television) stated that they
will not make plans to service this area until a broadband utility easement is
completed with their commercial account executive, Reneta Santoro, who
may be reached at 970-493-7400 from 8 a.m. to 5 p.m., Monday through
Friday.
3. Representatives of the Zoning Department offered the following comments:
a. A maximum of 76 parking spaces are allowed for the office uses and 78
are shown on the Site Plan. An alternative parking ratio plan (Section
3.2.2(K)(4) of the LUC] for the excess spaces may be requested in
281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6750 • FAX (970) 416-2020