Loading...
HomeMy WebLinkAboutBOARDWALK CROSSING, LOT 2, FILING 2 - PDP - 76-93B - CORRESPONDENCE - (5)• Required Number (minimums and maximums) of Off -Street Parking Spaces [3.2.2(K)]; • Parking Stall Dimensions [3.2.2(L)]; • Site Lighting [3.2.4]; • Development Agreement and Development Improvements [3.3.2]; • Building and Project Compatibility [3.5.11; • Mixed -Use, Institutional, and Commercial Buildings 13.5.31; • Compliance with Master Street Plan [3.6.1(B)]; • General Public Street Regulations [3,6.2 (A) through (I)]; • Emergency Access [3.6.6]. c. Contact Ron Gonzales of the Poudre Fire Authority to discuss emergency access issues, and to go over the specifics of how the Fire Code would apply to this project. 7. Light and Power: a. Normal development fees apply. b. A C 1-Commercial form will need to be filled out to determine non- residential loads. c. 3 phase power is available nearby. d. A single transformer could be located between the 2 buildings. 8. Transportation: a. The TIS will need to address all modes of transportation not only including vehicle, but also bicycle, pedestrian and transit. Coordinate with Eric Bracke from Traffic Operations to determine the level of detail necessary for the vehicular scope of the TIS. Coordinate with Tom Reiff from Transportation Planning to determine the level of detail necessary for the bicycle, pedestrian and transit scope of the TIS. b. Bicycle parking must be provided near building entrances. c. Radial sidewalk ramps shown need to be directional ramps. d. This site is in the influence area of the Mason Transportation Corridor. There is a proposed bus rapid transit stop at Troutman. The sidewalks along Mason Street act as the primary pedestrian links to the stations. The building entrances should have a prominent link to the Mason Street sidewalk. 9. Current Planning: a. Refer to Section 3 (General Development Standards), and Section 4.17 (C - Commercial Zoning District) in the Land Use Code for the standards that apply to your proposed development. The Land Use Code is available to view on the intemet at www.fcgov.com/cityclerk/codes.php. b. Please visit our website at http://www.fc�rov.com/currentplanning/submittals.php for a complete list of submittal requirements. c. The dumpster locations should be relocated. The entrances of the buildings should orient to the comer of the buildings along Mason so the entrances are convenient to both the sidewalk and the parking lot. d. Pay particular attention to the following standards in the Land Use Code: • "FullTree Stocking" is [LUC 3.2. 1 (D)(1)(c)]; • Street trees [3.2. 1 ((D)(2)]; • Foundation Plantings [3.2.1(E)(2)(d)]; • Parking lot Perimeter Landscaping 13.2. 1 (E) (4)]; • Parking lot Interior Landscaping [3.2. 1 (E) (5)1; • Screening [3.2.l(E)(6)1; • Placement and Interrelationship of Required Landscape Plan Elements [3.2.1(H)]; • Landscape Plan Coordination with Utilities [3.2.1(K)]; • Parking Lot and Circulation System Layout [3.2.2(C) through (K)1; 4 c. You will be required to have Utility as part of the application. You may be required to have a Development Agreement and aDevelopment Construction Permit. A plat is not required. d. A utility coordination meeting will be necessary. This should be conducted early in the process, and is frequently quite helpful prior to initial formal development submittal. Typically we need a site layout (including building locations, proposed paving arrangement, and proposed water, sewer, stormwater, electric, phone, and cable TV facilities) to distribute to the utility providers at least a week prior the meeting. Your Engineering Department contact can schedule this for you. e. Adjacent streets will need right-of-way and adjacent utility easements dedicated in accordance with standards contained in the Larimer County Urban Area Street Standards (LCUASS) document. Mason Street is designates as a 2-lane arterial. Match Garth Commercial Plaza across the Street (10' parkway within the right-of-way, 6' sidewalk in an access easement, and the adjacent 15 foot wide utility easement. Boardwalk is a 2-lane collector without parking, so it should have a 66 foot wide right- of-way. f. There are potential impacts of this development on the Mason Transportation Corridor. Coordinate closely with Current Planning and Transportation Planning on this issue. g. The project will be required to repair or replace any damaged or missing segments of curb, gutter and sidewalk. h. If there are any existing overhead utilities, they will be required to be undergrounded. i. Sidewalk ramps will need to be directional ramps. j. Public improvements will need to be in accordance with Larimer County Urban Area Street Standards. 4. Water & Wastewater Utility: Location: SE of Boardwalk Drive and Mason Street (W of REI) (0-7) Proposal: Retail/office buildings Ex. Mains: 8-inch water and 8-inch sewer in Mason, 8-inch water and 8-inch sewer in Boardwalk and 6-inch water and 8-inch sewer in drive S of site Comments: The water conservation standards for landscape and irrigation will apply to the project. Development fees and water rights will be due at building permit. A repay for the Warren Lake trunk sewer will also be due. 5. Natural Resources: a. Provide adequate space in dumpster area to allow for recycling services. b. Use native plants/grasses and reduce bluegrass lawns as per LUC Article 3.2.1(E) (2) (3). 6. Fire Department: a. Address must be visible from the street using a minimum 6" numerals on a contrasting background. b. See Section 3.6.6 of the LUC regarding Emergency Access. 3 standard street tree spacing requirements, and it requires a row of trees between parking lots and adjacent side property lines. Also, parking lots shall be screened from adjacent uses and the street. g. Parking lot interior landscaping is required and regulated in Section 3.2.1(E)(5) of the LUC. This requires parking lots with less than 100 spaces to devote at least 6% of the interior space of the parking lot to landscaped areas, and 10% for parking lots with 100 or more spaces. h. Bicycle parking must be provided near building entrances. i. Don't show signage on the elevations. J. Please allow adequate space within your dumpster enclosure to accommodate recycling containers. 2. Stormwater Utility Department: a. This site is in the McClelland/Mail Creek drainage basin where the new development fee is $3,717.00/acre which is it is subject to the runoff coefficient reduction. This fee is to be paid at the time the building permit is issued. b. A drainage and erosion control report and construction plans are required and they must be prepared by a Professional Engineer registered in Colorado. c. Onsite detention is required with a 0.87 cfs/acre release rate.for water quantity and extended detention is required for water quality treatment. The previous study approved for the site should have the correct release rate already calculated. If parking lot detention is to be used the maximum depth allowed is one foot. d. This site is on the Stormwater Utility inventory map 70. e. At one time this site was designed to have detention and a pipe was to be stubbed from the parking lot to the north for the outfall. That detention volume was not determined using present rainfall intensities so it will need to be resized and the water quality capture volume added to the sizing. f. There is a repay due for an SID for a stormsewer system that was built in the 1980's. This will need to be paid before a building permit can be issued. The design engineer will need to calculate the amount due in accordance with the SID documents. 3. Engineering Department: a. Street Oversizing Fees and Larimer County Road Impact Fees are likely to apply. Check with Matt Baker for the specific amount of these fees for your project. 2003 rates for these fees were $6.24 per square foot for retail, and $4.06 per square foot for office. The 2004 rates will be slightly higher. b. A Traffic Impact Study (TIS) will need to be submitted for review. The TIS needs to addresses site access, and all modes of transportation including automobile, bicycle, pedestrian, and transit. Coordinate with Eric Bracke from Traffic Operations to determine the level of detail necessary for the vehicular scope of the TIS. Coordinate with Tom Reiff from Transportation Planning to determine the level of detail necessary for the bicycle, pedestrian and transit scope of the TIS. 2 ,. CONCEPTUAL REVIEW STAFF COMMENTS City of Fort Collins MEETING DATE: 12/22/03 ITEM: SEC Boardwalk and S. Mason APPLICANT: Steve Steinbecker, Architecture West LAND USE DATA: The request is to develop the final 2 buildings of Boardwalk Crossing at the southeast corner of Boardwalk and Mason Street. The two building would consist of a 2-story 10,000 square foot office and retail building at the comer, and a one story 5000 square foot retail building on the southern portion of the site. DEPARTMENTAL CONTACTS: Current Planning- Troy Jones 221-6750 Zoning Department- Jenny Nuckols 221-6760 Engineering Department- Katie Moore 221-6605 Street Oversizing Coordinator- Matt Baker 221-6605 Poudre Fire Authority- Ron Gonzales 221-6570 Stormwater Utility- Glen Schlueter 224-6065 Water & Sewer Utilities- Roger Buffington 221-6854 Natural Resources Planner Doug Moore 221-6750 Light and Power Janet McTague 221-6700 Transportation Services (ped. & transit) Tom Reiff 416-2040 Transportation Services (traffic) Eric Bracke 224-6062 Transfort (local bus service) Garold Smith 224-6195 Park Planning Jason Stutzman 416-2260 COMMENTS: 1. Zoning Department: a. The property is located in the C - Commercial zone. b. This proposed uses of retail and offices would be subject to a Type 1 review. c. The parking space quantities are regulated in Section 3.2.2(K) of the Fort Collins Land Use Code (LUC). d. Handicap parking is regulated in Section 3.2.2(K)(5) of the LUC. At least one space will need to be 16 feet wide to accommodate a van. e. Parking stall dimensions are regulated in Section 3.2.2(L) of the LUC. f. Parking lot perimeter landscaping is required and regulated in Section 3.2.1(E)(4) of the LUC. Generally, this standard requires street trees between parking lots and streets to increased in quantity from the COMMUNITY PLANNING AND ENVIRONMENTAL SERVICES 281 N. College Ave. PO. Box 580 Fort Collins, CO80522-0580 (970) 221-6750 CURRENT PLANNING DEPARTMENT C-A Community Planning and Environmental Servicest.7' Current Planning (, a(. odt City of Fort Collins Steve Steinbecker January 7, 2004 Architecture West 160 Palmer Drive Fort Collins, CO 80526 Dear Mr. Steinbecker: For your information, attached is a copy of the Staffs Comments concerning the. final 2 buildings of Boardwalk Crossing at the southeast corner of Boardwalk and Mason Street presented before the Conceptual Review Team on December 22, 2003. The comments are offered informally by Staff to assist you in preparing the detailed components of the project application. Modifications and additions to these comments may be made at the time of formal review of this project. If you should have any questions regarding these comments or the next steps in the review process, please feel free to call me at 221-6750. �I Tr y . Jo es - City ann cc: E c Brack Traffic Operations Glen Schlu er, Stormwater Utility Project Planner File 281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6750 • FAX (970) 416-2020