HomeMy WebLinkAboutBOARDWALK CROSSING, LOT 2, FILING 2 - PDP - 76-93B - CORRESPONDENCE - (4)Number: 5 Created: 6/23/2004
[6/23/04] Only one trash enclosure is shown. Should provide another one for Lot 1
building(s) or relocate the one shown so that it's more conveniently located between the
buildings.
Number: 6 Created: 6/23/2004
[6/23/04] General note #4 states that there "shall be no rooftop or ground mounted
mechanical equipment". If that's true, where will the mechanical equipment be located?
Perhaps the note should be reworded so that it states that rooftop or ground mounted
mechanical equipment shall be screened from view.
Number: 7 Created: 6/23/2004
[6/23/04] General Note #6 implies that all exterior lighting will be building mounted, yet there
are pole fixtures shown on the site plan. If there are to be pole fixtures, then the note should
address those as well (i.e., down directional, height of poles, etc). If there aren't going to be
any poles, then remove them from the site plan.
Red line drawings are available at the Current Planning front desk. Be sure and return all of
your redlined plans when you re -submit. The applicant must set up a meeting with Ginger
Dodge (970) 221-6750 prior to resubmitting the project.
If you have any questions regarding these issues or any other issues related to this project,
please feel free to call me at (970) 221-6750.
Yours Truly,
Bob Barkeen
City Planner
Page 5
[6/22/04] The Transportation Study prepared by Sear -Brown is acceptable. I support the
conclusion that the NBRT lane on Mason onto Boardwalk is not required. The intersection
of Mason and Boardwalk will operated acceptably under stop sign control into the long
range future.
Department: Transportation Planning Issue Contact: Tom Reiff
Topic: Transportation
Number: 8 Created: 7/6/2004
[7/6/04] Please label the 6' sidewalk for Mason Street and the 5' walk for Boardwalk on both
the site and utility plans.
Number: 9 Created: 7/6/2004
[7/6/04] Please identify the locations and label the bike racks on all plan sets. Bike racks
are required to be located near the building entrance in a visible secure location (one for
each bldg.)
Number: 10 Created: 7/6/2004
[7/6/04] Is it wise to have a parking stall immediately in front of the trash enclosure where a
vehicle could potentially be blocking the dumpster?
Number: 12 Created: 7/6/2004
[7/6/04] The proposed evergreen trees along Mason Street appear to be growing into the
sidewalk. This will most likely create a maintenance problem with constant pruning. Trees
along sidewalks are required to be maintained at an 8' clearance above the sidewalk, which
may look silly for the proposed evergreens. Please use deciduous trees or shrubs along the
sidewalks.
Department: Water Wastewater Issue Contact: Jeff Hill
Topic: General
Number: 11 Created: 7/6/2004
[7/6/04] Provide top of water main and bottom of sanitary sewer service at the water main
crossing in Boardwalk Dr. Will a lowering of the water main be required at this crossing?
Provide details if so.
Number: 13 Created: 7/6/2004
[7/6/04] Provide a copy of the utility easement documentation for our review.
Number: 14 Created: 7/6/2004
[7/6/04] Include the concrete encasement detail on the detail sheet.
Number: 15 Created: 7/6/2004
[7/6/04] See site, landscape and utility plans for other comments.
Department: Zoning
Topic: zoning
Issue Contact: Peter Barnes
Number: 3 Created: 6/23/2004
[6/23/04] Building envelopes are labeled, but not dimensioned. Please show envelope
dimensions.
Number: 4 Created: 6/23/2004
[6/23/04] Need to provide bike racks. Show/label locations on site plan.
Page 4
intersection with Mason (sw corner) is under 1fc - need better levels to illuminate
sidewalk/vehicle intersection.
Number: 18 Created: 7/6/2004
[7/6/04] Trash enclosure needs to be better illuminated - recommend the 1.Ofc standard.
Also, Honeylocust in center of parking will block lighting - would suggest fixture be moved to
west property line to address lighting/landscape issues.
Department: Stormwater Utility Issue Contact: Wes Lamarque
Topic: Drainage
Number: 33 Created: 7/9/2004
The Mail Creek Master Plan states that the release rate for detention ponds be the 2-year
historic flow rate for the site, including half the street frontage. For this site, the designated
.87 cfs for the area that drains into the 30-inch storm sewer will control. Please adjust the
release rate for this site to be .87 cfs/acre.
Number: 34 Created: 7/9/2004
Please document the total release rate for the site, including half the street frontage, and
show how the overall sites release rate meets the .87 cfs/acre criteria.
Number: 35 Created: 7/9/2004
Please add a flow calculation for the sidewalk chase.
Number: 36 Created: 7/9/2004
A drainage easement is required for the detention pond. The existing drainage easement
needs to be vacated for the part that is in conflict with the proposed building.
Number: 37 Created: 7/9/2004
1. There are two "Grading, Sediment, and Erosion Control Plan" sheets in the back of the
report and they are different. Which one is the real plan?
2. The area inlet to be installed in the new WQ pond will need protection when it is
constructed.
3. The silt fencing along the east side of the new construction is very difficult to see on the
plan.
4. Since the plan shows all of the BMP's and no phasing, it is going to be assumed that
all of them will be installed and kept in good working order and repair from the first
shovel of dirt being moved until project completion. This should be reflected in your
surety calculations.
5. There must be a project schedule on the plan indicating when various BMP's are to be
placed and/or removed in relation to construction sequencing.
6. What is the "Native Grass Area?" Is this to be reseeded/mulched, or is it to be
landscaped? Please indicate on the plan.
Department: Traffic Operations Issue Contact: Eric Bracke
Topic: Traffic
Number: 2 Created: 6/22/2004
Page 3
Number: 26 Created: 7/7/2004
[7/7/04] Please dedicate a total 15' wide utility easement behind the ROW on Mason or
request an engineering variance to that standard (approval of this variance requires
additional time to obtain approval of all utilities).
Number: 27 Created: 7/7/2004
[7/7/04] Please find a common title for all the plan sheets that is unique (not used
previously).
Number: 28 Created: 7/7/2004
[7/7/04] Please review appendix E-10 in LCUASS for the City's scanability requirements for
all plan sheets and revise plans as necessary.
Number: 29 Created: 7/7/2004
[7/7/04] Please use the standard detail for an under -walk drain (attached).
Number: 30 Created: 7/7/2004
[7/7/04] Any work performed outside this property's boundaries requires offsite easements.
(sidewalk near southeast corner of site) Please provide a letter of intent from the adjacent
property owner prior to hearing, and a copy of the completed easement prior to mylars being
signed.
Number: 31 Created: 7/7/2004
[7/7/04] Please see redlines for any additional comments.
Number: 32 Created: 7/7/2004
[7/7/04] The city is revising its detail for the pedestrian ramps used at corners to meet ADA
requirements. See attached memo. I will get you the finalized detail as soon as I receive it.
Topic: sitellandscape plan
Number: 19 Created: 7/7/2004
[7/7/04] After close inspection, I can see that an attempt was made to use different line
weights for existing features vs. proposed features, but at this quality of printing, they are
nearly indiscernible. Please change the line weight used for existing features so that they
are more distinct from proposed ones.
Number: 20
[7/7/04] Please clarify the extents of phase 1.
Department: Light & Power
Topic: General
Number: 1
[6/21/04] No Comments
Created: 7/7/2004
Issue Contact: Bruce Vogel
Created: 6/21 /2004
Department: Police Issue Contact: Joseph Gerdom
Topic: General
Number: 17 Created: 7/6/2004
[7/6/04] Parking lot requires a minimum of 1.Ofc throughout. Western most line of parking
falls below this. Also, the north -south driveway should meet this requirement. The driveway
Page 2
STAFF PROJECT REVIEW
Citvof Fort Collins
ARCHITECTURE WEST LLC Date: 07/13/2004
4710 S. COLLEGE AVE.
FT. COLLINS, CO 80525
Staff has reviewed your submittal for BOARDWALK CROSSING, LOT 2, FILING 2 PDP -
TYPE I, and we offer the following comments:
ISSUES:
Department: Current Planning Issue Contact: Bob Barkeen
Topic: General
Number: 16 Created: 7/6/2004
The site plan shows both building entrances accessing within the adjacent parking area,
instead of directly onto the adjacent streets (Mason, Boardwalk or the rear access to REI).
Given the location within the Mason Street Corridor, direct building access should be
considered on either Mason/Boardwalk and on the private drive to the south (for the
southern building).
Number: 38 Created: 7/13/2004
[7113/04] In the event the southern building is moved to the east, thus eliminating the
foundation plantings along this eastern wall, an alternative would be to include trees in tree
grates along the sidewalk.
Current Planning supports the relocation of the trash enclosure. Trash enclosures may not
be located within 20 feet of a public sidewalk.
Department: Engineering Issue Contact: Katie Moore
Topic: General
Number: 21 Created: 7/7/2004
[7/7/04] Please provide both directional ramps on the northwest corner of the site.
Number: 22 Created: 7/7/2004
[7/7/04] Please dimension the parkways and sidewalks to meet or exceed LCUASS
standards.
Number: 23 Created: 7/7/2004
[7/7/04] The southern retail building is overlapping an existing drainage easement, which is
not allowed unless that portion of the drainage easement is proposed to be vacated, and the
City agrees to vacate it. In order to vacate the easement the City will need a legal
description of the portion of the easement to be vacated, and a letter requesting the
vacation. The easement vacation would then be processed through Cameron Gloss, since
this is a Type I project.
Number: 24 Created: 7/7/2004
[7/7/04] The plat shows a small utility easement off the 30' access road that is not shown on
the plan and may overlap the proposed building. Please show all easements on the plans.
Number: 25 Created: 7/7/2004
[7/7/04] Please dedicate a public access easement to the back of the sidewalk on Mason.
Page I