Loading...
HomeMy WebLinkAboutBOARDWALK CROSSING, LOT 2, FILING 2 - PDP - 76-93B - CORRESPONDENCE -Bob Barkeen City Planner Page 4 Department: Traffic Operations Issue Contact: Eric Bracke Topic: General Number: 43 Created: 12/3/2004 [12/3/04] No comment Department: Transportation Planning Issue Contact: David Averill Topic: General Number: 45 Created: 12/10/2004 [12/10/04] No further comments, but a question: Engineering staff mentioned that this applicant had (at one point) "reached out" to REI to explore the feasibility of completing a sidewalk connection to the east. Understanding that this would require a small off -site improvement on REI's property, I am curious as to the status of this possible connection. Thanks. Department: Water Wastewater Issue Contact: Jeff Hill Number: 15 Created: 7/6/2004 [12/8/04] [7/6/04] Coordinate landscape and site plan to reflect the same information as shown on the utility plans. Label the water shut off for the south building as a curb stop and not as a gate valve. See site, landscape and utility plans for other comments. Department: Zoning Issue Contact: Peter Barnes Topic: zoning Number: 5 Created: 6/23/2004 [12/2/04] The enclosure has been relocated, but now it's not convenient for the Lot 2 building. The original proposed location was more convenient for both buildings then the new location is. [6/23/04] Only one trash enclosure is shown. Should provide another one for Lot 1 building(s) or relocate the one shown so that it's more conveniently located between the buildings. Number: 7 Created: 6/23/2004 [12/2/04] The wording of this note has been changed, but there are still pole fixtures shown that aren't addressed in the note as to down directional, height of poles, etc. [6/23/041 General Note #6 implies that all exterior lighting will be building mounted, yet there are pole fixtures shown on the site plan. If there are to be pole fixtures, then the note should address those as well (i.e., down directional, height of poles, etc). If there aren't going to be any poles, then remove them from the site plan. Be sure and return all of your redlined plans when you re -submit. If you have any questions regarding these issues or any other issues related to this project, please feel free to call me at (970) 221-6750. Yours Truly, Page 3 [11/29/04] The developer is encouraged to coordinate location(s) for pad type electric transformers with Light & Power Engineering (970)221-6700. It appears space for transformer(s) is limited, so the developer is encouraged to coordinate this as soon as possible. Department: Police Issue Contact: Joseph Gerdom Topic: General Number: 44 Created: 12/8/2004 [12/8/04] Is driveway entrance (north side Lot 1) going to function as access to bldg in NW corner - if so, doesn't seem wide enough for two way traffic. Department: Stormwater Utility Issue Contact: Wes Lamarque Topic: Drainage Number: 35 Created: 7/9/2004 [12/10/04] Please add a flow calculation for the sidewalk chase. Number: 36 Created: 7/9/2004 [12/10/04] A drainage easement is required for the detention pond. The existing drainage easement needs to be vacated for the part that is in conflict with the proposed building. Number: 47 Created: 12/10/2004 [12/10/04] Please request a variance for the detention pond depth being greater than 12- inches in the parking lot with a valid reason or grade the pond to have only the maximum depth. Signs stating that depth of detention for those parking stalls would be required if greater than 12 inches. Number: 48 Created: 12/10/2004 [12/10/04] Please clarify basin areas. See redlined plans. Number: 49 Created: 12/10/2004 [12/10/04] Please move the proposed trees away from the existing storm sewer as mentioned in the meeting held on December 8th. Topic: Erosion/Sediment Control Number: 46 Created: 12/10/2004 [12/10/04] 1. The Standard Erosion Control Notes have been revised. Please replace those currently on the plan with the newer version. 2. The surety calculation from the first submittal does not accurately reflect the construction on the current phase. Please recalculate. 3. The report states that gravel filters will be placed on the existing area/curb inlets in Lot 1. On the plan, the west bank inlet is indicated as having straw bales. This will not work, please show a gravel filter here. Also change the note on the plan indicating straw bales under your heading "BMP NOTES:" 4. There must be a project schedule on the plan showing the construction phasing/BMP's to be used on this project. Please utilize the newly upgraded schedule form (available by email). Page 2 ��m.. STAFF PROJECT REVIEW City of Fart Collins ARCHITECTURE WEST LLC Date: 12/13/2004 4710 S. COLLEGE AVE. FT. COLLINS, CO 80525 Staff has reviewed your submittal for BOARDWALK CROSSING, LOT 2, FILING 2 PDP - TYPE I, and we offer the following comments: ISSUES: Department: Engineering Issue Contact: Katie Moore Topic: General Number: 21 Created: 7/7/2004 [12/2/04] Due to new ADA requirements, and difficulties encountered with constructing ped ramps at corners, additional detail and spot elevations are needed for the design of the corner ramps to ensure ADA compliance. [7/7/04] Please provide both directional ramps on the northwest corner of the site. Number: 24 Created: 7/7/2004 [12/2/04] Please show all easements on the site plan as well as the utility plan. [7/7/04] The plat shows a small utility easement off the 30' access road that is not shown on the plan and may overlap the proposed building. Please show all easements on the plans. Number: 25 Created: 7/7/2004 [12/2/04] Please show this easement on the site plan. [7/7/04] Please dedicate a public access easement to the back of the sidewalk on Mason. Number: 26 Created: 7/7/2004 [12/2/04] Please note that a variance was granted to allow a 10' utility easement along Mason. [7/7/04] Please dedicate a total 15' wide utility easement behind the ROW on Mason or request an engineering variance to that standard (approval of this variance requires additional time to obtain approval of all utilities). Number: 28 Created: 7/7/2004 [12/2/04] There are still areas of the plans needing attention regarding scanability. [7/7/04] Please review appendix E-10 in LCUASS for the City's scanability requirements for all plan sheets and revise plans as necessary. Number: 31 Created: 7/7/2004 [12/2/04] [7/7/04] Please see redlines for any additional comments. Number: 42 Created: 12/2/2004 [12/2/04] The easement dedicated for the sidewalk on Mason should be a public access easement rather than a pedestrian access easement. Department: Light & Power Topic: Electric Number: 41 Issue Contact: Doug Martine Created: 11 /29/2004 Page 1