Loading...
HomeMy WebLinkAboutCAPSTONE COTTAGES - PDP - PDP140004 - MAPS/GRAPHICS - TRANSPORTATION ISSUE■ NORTHERN ENGINEERING LINCOLN AVENUE AND INTERNATIONAL BOULEVARD I CONCEPTUAL INTERSECTION COST COMPARISON ITEM Local Portion Traditional Roundabout 203 Earthwork $ 11,000 $ 35,500 $ 51,500 403 Asphalt Pavement $ 86,800 $ 276,800 $ 306,700 608 Concrete Sidewalk $ 33,750 $ 45,000 $ 34,500 609 Curb, Gutter, and Ramps $ 24,900 $ 41,500 $ 67,500 610 Median Cover Material (Patterned Concrete) $ - $ - $ 62,000 614 ITraffic Signalization $ - $ 135,000 $ - A SUB -TOTAL OF MAJOR ITEMS $ 156,450 $ 533,800 $ 522,200 B Clearing and Grubbing 1.0% of A $ 1,500 $ 5,300 $ 5,200 C Removals, Resets, and Adjustments 10.0% of A $ 15,600 $ 53,400 $ 52,200 D Erosion Control 6.0% of A $ 9,400 $ 32,000 $ 31,300 E Seeding, Mulching, Minor Landscaping 2.5% of A $ 3,900 $ 13,300 $ 13,000 F Permanent Water Quality 2.5% of A $ 3,900 $ 13,300 $ 13,000 G Drainage / Storm Sewer System / Culvert Extensions 16.0% of A $ 25,000 $ 85,400 $ 83,500 H Signing and Pavement Marking 6.0% of A $ 9,400 $ 32,000 $ 31,300 1 Urban Design and Enhanced Landscaping 30.0% of A $ - $ 160,100 $ 156,600 J Construction Traffic Control 8.0% of A to 1 $ 18,000 $ 74,300 $ 72,600 K Mobilization 5.0% of A to J $ 12,100 $ 50,100 $ 49,000 L Construction Surveying 7.0% of A to J $ 17,000 $ 70,200 $ 68,600 M TOTAL OF CONSTRUCTION ITEMS $ 272,250 $ 1,123,200 $ 1,098,500 N Contingency 15.0% of M $ 40,800 $ 168,500 $ 164,800 O Minor Contract Revisions / Force Accounts 10.0% of M $ 27,200 $ 112,300 $ 109,900 P Utility Relocations 5.0% of M $ 13,600 $ 56,200 $ 55,000 Q SUB -TOTAL OF CONSTRUCTION COST $ 353,850 $ 1,460,200 $ 1,428,200 R Design Engineering / Surveying / Geotechnical 10.0% of Q $ 35,400 $ 146,000 $ 142,800 S Construction Engineering 24.0% of Q $ 84,900 $ 350,400 $ 342,800 TOTAL PROJECT CONSTRUCTION COST $ 474,150 $ 1,956,600 $ 1,913,800 Right -of -Way Acquisition $8.00 per SF $ $ 142,900 $ 377,000 301 N. Howes Street, Suite 100, Fort Collins, CO 80521 970.221.4158 www.northernengineering.com w A x4fr MA .. •t f 14 do t ft l if I A. /Y,4,/ / 2/„ / Ak��0 • E LINCOLN AVE V* L 7-* ..r .. .� . f lr� � f 1 PLO 0 rF R r ;t E LINCOLN AVE INTERSECTION EX