CAPSTONE COTTAGESfftStrtra'Gagg July 24,2013
STUDIO AT 401 WEST MOUNTAIN AVENUE STE 100 FORT CO LINS COLORADO 1 970 224 5828 1 ON THE WEB AT WWW RIVLEYDESIONINC CO
'I,
1I " 'RLR
1!11;
I
i
:
NIFOROS
WORDS
L New 4
y0
LAMMER
COUNTY
ZONE DISTRICT IR.I1
mOPO6E0 REZONE TO ININ
moPO6E0l T ms
rm_ �
NORTH
CAPSTONE COTTAGE4a mM, July 24, 2013
STUD O rtT 10, :4F3T MtlU Ni41 00 FART COLLINS LOlOR 400 1 b)F 721 5826 1 ON 14F 'h'Ed AT ',Y R'"!. RIPLETOESIv KING GGEi
D
fhLTR/t TRASH LQIrAGTOR —
AHo Rarest ceHrel
IMINT[NANLC WLAIK ��
rO rARRS
awHoure Aw roes
eANc or cnaRroo �
TNC pwT LOI4NS ORewCTY
LAND USE
UNITS TYPE
BEDS
85 TOWN HOMES (4-BED)
340
90 DUPLEX COTTAGES 15 BEDI
45D
22 COTTAGE 15 BED)
110
TOTAL = 197
900
PARKING SPACES (I /BED + 50 GUEST)
950
BICYCLE PARKING
900
60% COVERED )540 SPACES)
SITE AREA = 23.17 ACRES
DENSITY = 8.5 DU/ACRE
LEGEND
NATIVE SEED UNTIL FUTURE
DEVELOPMENT
Te+G mm�TRvt ceva
vweur
(uRweR cwlm
orIUM toaowArm Y'A ` \ ji 0 I 4 D
SCALE: 1"=200'-O" NORTH
CAPSTONE COTfAGESbnhae�fua(6eeyjy July 24, 2013
STUDIO AT 401 WEST MOUNTAIN AVENUE STE 100 FORT COLLINS COLORADO 1 970 274 5028 1 ON THE WEB AT WWW RIPLEYDESIGNINC DOM
ALTA V15TA
i L
■ E.V i nP,(Jr-�.•�E=V,i me3f7 r-..�
- - - - - - - - - - - y
I tu,
- ., ANDER50NVILE/
5AN GR6TO
4aw o1.
F � -
luckingi,.m St _ - C �-" a " Macku acxSt
iF � 16.
e e
✓� F.
Nil
". _ �� . �Ea Li �r<�hae.4ve•. �e.o- 1. O� ® 41
WAL-MART
Cmk N (;, ns Golf C,-sF
$, 41ar � I A
Water/Wastewater
1. Please confirm what City and District water mains are to be abandoned versus those that are to
remain.
Planning
1. The southern -most block created in the proposed project is over the 7-acre maximum allowed
by the Land Use Code . Access to the site is severely limited with the access points on Lemay
and International being determined by required stacking and adequate intersection spacing.
Would the City staff support a finding of infeasibility as to this block's size (8.3 acres) due to
existing development and proposed street alignments and constraints?
2. The MMN District requires a 12 DU/AC minimum density for projects over 20 acres. The
proposed project is approximately 23 acres with a 8.5 DU/AC density, however, the bedroom
mix is unusually high. For example if the 900 proposed bedrooms were distributed in 2-
bedroom apartments, the resulting density would be 19.4 DU/AC. As proposed the actual
population housed in the development is similar to student housing projects in the 15-20 DU/AC
range. Will the City staff support a Modification for lower density given the high bedroom
count? More bedrooms per dwelling unit equates to lower overall energy use, and uses fewer
resources to house the same number of people. The proposed cottage -style product looks very
much like a single family home.
PFA
1. Where will PFA need extra wide drive aisles for the 3-story townhome product?
Thinking outside of the box for over two decades.
401 W. Mountain Ave., Suite 100 ■ Fort Collins, CO 80521 ■ tel. 970.224.5828 ■ fax 970.224.1662 ■
www.ripleydesigninc.com
land planning is landscape architecture ■ urban design ■ entitlement
July 24, 2013
Capstone Cottages at Lincoln and Lemay
Preliminary Design Review Questions
Transportation/Engineering
1. Our Design Team would like to request that someone from the Transportation Division be at the
PDR. We would like to discuss the Lemay/Vine intersection. Since the proposal is for student -
oriented housing with most travel to/from CSU, we would not expect much site traffic going
through the subject intersection.
2. Is the preliminary design for ultimate Lemay Avenue that was used to dedicate R.O.W. north of
this site still valid?
3. The proposed extension of Duff Street and its alignment with Buckingham Street as proposed in
2007 would require some changes to circulation in the neighborhood to the north. We would
like to know how that circulation gets addressed, since it may come up at our neighborhood
meeting. We have included a graphic entitled "10`h Street Concept' which depicts 10`h Street in
the Andersonville/San Cristo neighborhood ending with an elbow that ties it to existing
Buckingham Street and the alley. This is one idea, although it gets very close to the Lemay ROW
and may not fit. It also would displace what appears to be a storm water detention pond.
4. Who is financially responsible for the local street portion of this road adjacent to Parcel
8707216001 (existing detention pond)?
5. The developer proposes to construct International Boulevard to Duff Drive with the project, but
not construct Duff Drive until the property to the north develops. Is this phasing acceptable?
6. The Applicant would like to propose parking on International Boulevard, north of the project
entrance, at least until International Boulevard is extended past Duff Drive. Is this acceptable?
7. If the adjacent property owners to the north concur, would the staff be interested in including
the adjacent properties in the plat to clean up the area?
8. Does the City staff agree that the proposed street alignments and classifications are consistent
with the City's Master Street Plan?
Stormwater
1. Is the proposed strategy to rely entirely upon permeable paver systems an acceptable means of
handling stormwater detention and water quality treatment?
2. Who is responsible to mitigate the stormwater detention volume that maybe displaced by the
extension of Buckingham east of San Cristo PUD?
Thinking outside of the box for over two decades
401 W. Mountain Ave., Suite 100 ■ Fort Collins, CO 80521 ■ tel. 970.224.5828 ■ fax 970.224.1662 •
www.ripleydesignine.com
throughout the site with 60% of those spaces covered as required by the Land Use Code. Capstone
utilizes a centrally located trash compactor and recycling center for residents with pick-ups scheduled to
handle expected volumes.
In addition to attractive, pedestrian oriented streetscapes, the project interior includes generous
greenways, pocket parks and a large 1.5-acre private park with recreation center and resort style pool.
The clubhouse will include the leasing office, study areas, social area, fitness center, computer facilities
and a multi -purpose room.
The site will be generously landscaped utilizing xeriscape principles to conserve water and reduce
maintenance. Canopy shade trees are provided along all streets, while evergreen and ornamental
trees are added for seasonal interest.
Stormwater will be managed through permeable paver systems incorporated into the private parking
lots and drive aisles. The area of pavers is expected to exceed 25%of the total parking lot area. The
permeable pavers will be utilized to satisfy the City's LID requirements, as well as to provide standard
detention storage and water quality treatment.
Detention storage volume will be provided to offset the difference between the peak 100-year
developed flow and the 2-year historic rate (0.2 cfs/acre per Dry Creek Basin Master Plan, which has
been adopted by both the City and County). The water quality capture volume will be provided inclusive
(not additive) within the detention storage volume under the paver section.
Stormwater will infiltrate into the native soil below the permeable paver areas to the extent feasible,
given the nature if the in -situ soils. Additional geotechnical testing will be necessary to confirm the
infiltration capacity of the native soils. Any excess stormwater unable to infiltrate the ground below the
permeable paver sections will be collected via a system of underground stormwater pipes into the
Lincoln Channel. Should existing soil conditions and/or site grading prove troublesome, some storage
volume may be proposed below the gravity outfall elevation of the Lincoln Channel.
Thinking outside of the box for over two decades.
401 W. Mountain Ave., Suite 100 ■ Fort Collins, CO 80521 ■ tel 970.224.5828 ■ fax 970.224.1662 .
www.ripleydesigninc.com
gathering places, state -of -the art fitness facilities, theaters, and both community and private study
rooms.
Because they approach every development opportunity as new and unique, they maintain flexibility and
innovation throughout the predevelopment, design, and development phases which allow them to
deliver the best possible product in each and every market. In Capstone's long history, they have
worked with many partners including the schools themselves, city governments, and public-private/non-
profit organizations to successfully meet the goals and objectives of each stakeholder often working
through numerous and complex development challenges.
Project Description
The project is designed as a series of residential blocks with all dwelling units facing a public street, a
street -like private drive or a major walkway spine, creating a pleasant, attractive pedestrian -oriented
neighborhood. The project proposes 197 dwelling units in three different building types including:
2-story, 5-bedroom cottages
2-story, 5-bedroom duplex cottages
3-story, 4-bedroom townhomes
The building types are arranged on the site so that the taller and higher density units are located to the
south with the residential density decreasing to the north where the project is closest to the
Andersonville/San Cristo neighborhood.
The project site includes three main points of access. Access from the existing Lemay Avenue is
proposed approximately 640 feet from the intersection of Lincoln and Lemay, access from International
Boulevard is proposed at approximately 550 feet north of the intersection of International Boulevard
and Lincoln and access from the future Duff Drive is proposed approximately 600 feet west of the
intersection of International Boulevard and Duff Drive. Webster Avenue will extend from the east and
create a fourth point of access. Adjacent street right-of-ways will be dedicated as required; however,
the Applicant is not proposing to construct all the adjacent streets at the time of development. The
Applicant intends to build International Boulevard from Lincoln Avenue north to Duff Drive. Duff Drive
to the west of International Boulevard would be constructed when adjacent sites to the north are
developed. The re -aligned Lemay Avenue would be constructed when the City is able to fund the
proposed grade separated rail crossing proposed north of this area. The Applicant does, however,
intend to build the street sidewalk and parkway strip with street trees along these future street edges in
order to complete the pedestrian blocks and create a walkable neighborhood.
The cottage product is essentially a single family home with five bedrooms. This product offers students
a more neighborhood oriented lifestyle than typical student apartment complexes, while still providing
high quality management and site amenities. The developer proposes to convert the cottage units to
extra -occupancy rental units as defined in the Land Use Code after construction. The townhome units
include 4 bedrooms each. Increased parking and site amenities are proposed consistent with the higher
bedroom counts.
One parking space is provided for each bedroom, along with extra parking for guests. Parking is
distributed throughout the site so that it is convenient for residents, but not visible from public streets
surrounding the project. Similarly there will be one bicycle parking space for each bedroom distributed
Thinking outside of the box for over two decades
401 W. Mountain Ave., Suite 100 ■ Fort Collins, CO 80521 ■ tel. 970,224.5828 ■ fax 970.224.1662 ■
www.ripleydesigninc.com
land planning • landscape architecture ■ urban design ■ entitlement
July 24, 2013
Capstone Cottages at Lincoln and Lemay
Project Narrative
Capstone Collegiate Communities would like to develop a student -oriented multi -family project near the
intersection of Lincoln Avenue and Lemay Avenue. The Bank of Colorado is located on the corner and
the proposed project would be situated to the north and east of the bank. The site is impacted by the
future re -alignment of Lemay Avenue, the future location of International Boulevard, and the future
extension of Duff Drive to Buckingham Drive as indicated on the City's Master Street Plan.
The Applicant has assembled a project site that includes a 13.5 acre parcel zoned Medium Density
Mixed Use Neighborhood (MMN). The remainder of the site is currently zoned Industrial (1). All of the
property north and east of the Lincoln/Lemay intersection was zoned I -Industrial prior to 2003. The
13.5-acre parcel was re -zoned to MMN as part of the East Mulberry Corridor Plan Rezoning, a follow-up
action after adoption of the East Mulberry Corridor Plan. The MMN zone provides a transition between
the existing industrial uses to the east and existing commercial and residential uses to the south and
north. The Applicant will be requesting that approximately 9.7 acres adjacent to the MMN parcel be re-
zoned from I -Industrial to MMN. The resulting 23.17-acre site is what is needed to develop the
proposed multi -family project that will include 197 dwelling units.
The Andersonvilie residential community is located on the east side of Lemay northwest of the project
site. Undeveloped land is located to the north, existing industrial uses are located to the east, and
Buffalo Run Apartments and the Walmart shopping complex are located to the south. The proposed
new campus of Woodward Governor is located to the southwest and undeveloped land exists on the
west side of Lemay Avenue adjacent to the project site.
Capstone Collegiate Communities was recently formed as part of the restructuring of Capstone
Development, the most active and experienced developer of student housing facilities in the country for
more than 23 years. They specialize in the development, construction and management of high -quality
student housing developments in close proximity to major colleges and universities across the country.
Specifically, Capstone focuses on three types of student housing: 1) Cottages — "new urbanism" style
residential neighborhoods, 2) Lodges — higher density communities, and 3) Lofts - in -fill developments
that often include structured parking. Each of these developments represents a different type of
charming and appealing residential facility. These range from free-standing houses, townhomes and
flats, providing one to six bedroom living arrangements each with bed/bath parity. Their developments
also include top of the line amenities that offer a unique lifestyle for students including features such as
trails, open green spaces, Frisbee golf courses, dog parks, basketball, tennis, volleyball and bocce ball
courts, and resort -style pools. There are also attractive and comfortable community buildings that offer
Thinking outside of the box for over two decades
401 W. Mountain Ave., Suite 100 ■ Fort Collins, CO 80521 ■ tel. 970.224.5828 ■ fax 970.224.1662 •
www. ripleydesigninc. com
City Of Development Review Guide — STEP 2 of 8
Fort Collins PRELIMINARY DESIGN REVIEW:
APPLICATION
General Information
Preliminary design review is an opportunity for an applicant to discuss the requirements, standards, procedure, and
potential modifications of standards or variances that may be necessary for a project and to generally consider the
development proposal design which has been evaluated as a part of the conceptual review process. While the conceptual
review process is a general consideration of the development proposal, a Preliminary Design Review considers the
development proposal In greater detail. Problems of both a major and minor nature can be identified and solved during
the preliminary design review before a formal application is made.
Preliminary design review applications must be submitted to City Staff no later than 5 pm, two weeks prior to the
Wednesday meeting date. Application materials can be a -mated to curtentolanninaafcgov,com or sent to/dropped off at
281 North College Avenue.
Representatives of Community Development and Neighborhood Services (Zoning, Environmental Planning, Current
Planning, and Development Review Engineering), Light and Power, Stormwater, Water/Waste Water, Advance Planning
(Long Range Planning and Transportation Planning), Historic Preservation and Poudre Fire Authority regularly attend
preliminary design review meetings. Additionally, other public or quasl-public agencies which may be impacted by the
development project are invited and encouraged to attend the preliminary design review. These agencies may Include the
gas utility, water and/or wastewater utility districts, ditch companies, railroads, cable television service providers and
other similar agencies.
Upon receipt of a preliminary development proposal for review, and after review of such proposal with the applicant, the
staff shall famish the applicant with written comments and recommendations regarding such proposal In order to Inform
and assist the applicant prior to preparing components of the development application. The staff shell provide the applicant
with a 'critical issues' list, which will Identify those critical issues that have surfaced In the preliminary design review as
Issues that mNst be resolved during the review process of the formal development application. To the extent that there Is a
misunderstanding or a misrepresentation at facts, the opinion of the staff may change during the course of development
review.
Sectlon to be filled out by City Staff
Date of Meeting Project Planner
Submittal Date Fee Paid $500
*BOLDED ITEMS ARE REQUIRED* *The more Info provided, the more detailed your comments from staff will be
Project Name CAtagTONtr (Orr-r wES
Project Address (parcel # if no address) NoRT- dGAS T P nsi MrR ot= L.l Ne ew AeV>= A dr-,
) - ya-toer a.y.
Contact Names) an Rols(s) (Please Identify whether Consultant or Owner, etc) L- t"MA ZZr vt~et' -
Business Name (if applicable) o i TI V-5
Applicant Mailing Address pD
Phone Number 0170 .,�Z y • 5,d%15S' E-mail Address elq
Basic Description of Proposal (a detailed narrative is also required) _� r {7� H
Zoning t'l I Proposed Use Hur_-n - I%sid.uLY Existing Use �iAcs�wiT
Total Building Square Footage -i5b S.F. Number of Stories 2-3 Lot Dimensions
Age of any Existing Structures Nn w
Info available on Larimer County's Website: http://www co larimer co us/assessor/query/search cfm
'If any structures are 50+ years old, good quality, color photos of all sides of the structure are required.
Increase In Impervious Area I-Isb S.F.
(Approximate amount of additional building, pavement, or etc. that will cover existing bare ground to be added to the site)
Community Development & Neighborhood Services - 281 North College Avenue - Fort Collins, CO 80522-0580