HomeMy WebLinkAboutANGIE LEE PERIODONTICS - PDP - PDP160012 - CORRESPONDENCE - REVISIONSTopic: General
Comment Number: 1 Comment Originated: 04/13/2016
04113/2016: LUC 3.2.2(C)(4)(b) will require 20% enclosed bicycle parking/ 80%
fixed bicycle racks.
Ripley Design, Inc. (RDI) - The plan now reflects the required quantity of spaces.
Comment Number: 2 Comment Originated: 04/13/2016
04/13/2016: Trash enclosures over 6' tall require a separate building permit.
Acknowledged
Comment Number: 3 Comment Originated: 04/13/2016
04/13/2016: Signage is not approved with the PDP and Final Plan. Signage is
reviewed through separate sign permits.
Acknowledged
Comment Number: 4 Comment Originated: 04/13/2016
04/13/2016: Where is the mechanical equipment locations? How are they
screened?
Condensers are south east of the building and is screened by the shrubs.
End of comments.
Page 9 of 9
United Civil Design Group, LLC (UC) - Sheets within the Utility Plan set have
been revised to match the index.
Comment Number: 2 Comment Originated: 04/19/2016
04/19/2016: Please label all easements if they are going to be shown. See
redlines.
Ripley Design, Inc. (RDI) -Acknowledged
Comment Number: 3 Comment Originated: 04/19/2016
04/19/2016: There are line over text issues. See redlines.
Ripley Design, Inc. (RDI) - Fixed
Department: Traffic Operation
Contact: Martina Wilkinson, 970 Ll 221 11 6887, mwilkinson0fcoov.com
Topic: General
Comment Number: 1 Comment Originated: 04/19/2016
04/19/2016: Please check with Engineering on the appropriate design and details
for the sidewalk ramps (directional?) and location of truncated domes at both the
access location and at the Oakridge / Boardwalk intersection.
United Civil Design Group, LLC (UC) - As the access from Boardwalk is a private
drive, Engineering stated during the review meeting that there is no comment on
the sidewalk ramp location or type. Engineering will only require that the ramps
have truncated domes.
Comment Number: 2 Comment Originated: 04/19/2016
04/19/2016: no further comments.
Ripley Design, Inc. (RDI) - Acknowledged
Department: Water Conservation
Contact: Eric Olson, 9701 1 221 1 6704, eolson(afcgov.com
Topic: General
Comment Number: 1 Comment Originated: 04/18/2016
04/18/2016: Irrigation plans are required no later than at the time of building
permit. The irrigation plans must comply with the provisions outlined in Section
3.2.1(J) of the Land Use Code. Direct questions concerning irrigation
requirements to Eric Olson, at 221 6704 or eolsonO)fcaov.com
Ripley Design, Inc. (RDI)-Acknowhedged.
Department: Water Wastewater Engineering
Contact: Wes LarnAue, 9701 4161 ,2418, wlamardue(d)fcoov.com
Topic: General
Comment Number: 1 Comment Originated: 04/19/2016
04/19/2016: No comments.
Ripley Design, Inc. (RDI) -Acknowledged
Department: Zoning
Contact: Marcus Glasgow, 970F4161J2338, malasaowCcMcaov.com
Page 8 of 9
Topic: General
Comment Number: 2 Comment Originated: 04/19/2016
04/19/2016: The assumed c factor in the original Miramont Self Storage
Drainage Report for the prof erty was .75 for the 2 year storm. Please compare
this c factor with the proposed c factor of the site Yor the 2 yyear storm.
Unite' Civil Design Group, LLC (UC) - The c-factor calculatiins and description
will be revised with the 1st FDP submittal.
Department: Technical Services
Contact: Jeff County, 9701 i221 Li6588, icountyOfcgov.com
Topic: Building Elevations
Comment Number: 6 Comment Originated: 04/19/2016
04/19/2016: Please change the project title to "Angie Lee Periodontics". See
redlines.
Title Changed
Topic: Construction Drawings
Comment Number: 7 Comment Originated: 04/19/2016
04/19/2016: The title on sheet C001 does not match the sheet index. See
redlines.
United Civil Design Group, LLC (UC) - Sheet C001 has been revised to match
the sheet index.
Comment Number: 8 Comment Originated: 04/19/2016
04/19/2016: Please remove the Oakridge Drive label from all sheets. This is not
a dedicated street. See redlines.
Ripley Design, Inc. (RDI) - This has been changed to "Private Drive" on all
landscape sheets.
United Civil Design Group, LLC (UC) - This has been revised to "Private Drive"
on all civil plan sheets.
Comment Number: 9 Comment Originated: 04/19/2016
04/19/2016: Please remove the .00 from the seconds in the bearings, on all
sheets that show the bearings. See redlines..
United Civil Design Group, LLC (UC) - The bearings have been revised.
Topic: Landscape Plans
Comment Number: 4 Comment Originated: 04/19/2016
04/19/2016: No comments.
Topic: Lighting Plan
Comment Number: 5 Comment Originated: 04/19/2016
04/19/2016: No comments.
SRB Consulting Engineering, LLC (SRB) - Acknowledged - Chris Weaver, SRB
Topic: Site Plan
Comment Number: 1 Comment Originated: 04/19/2016
04/19/2016: Some of the sheet titles in the sheet index do not match the sheet
titles on the noted sheets. See redlines.
Page 7 of 9
04/22/2016: "Comcast would like a 2 inch conduit from the building out to the
road ROW from the communications room for future service to the building."
United Civil Design Group, LLC (UC) - Acknowledged. The 2" conduit will be
added and coordinated with Comcast during the FDP phase.
Department: PFA
Contact: Jim Lynxwiler, 970[_4161 2869, jynxwiler@poudrel fire.org
Topic: General
Comment Number: 1 Comment Originated: 04/19/2016
04/19/2016: FIRE ACCESS
Fire access is required to within 150' of all exterior portions of the building
perimeter. Fire access cannot be measured from an arterial road.
• The initial 4,000 sq. ft. building will be within access as measured from
Oakridge Dr.
• The future 3,000 sq. ft. building addition will place the building out of
access as defined by code.
• Either the building will require a fire sprinkler system at that point, or a
fire lane will be required on the west side of the property and an
Emergency Access Easement shall be dedicated.
• Code language and fire lane specifications provided to the project team
previously.
United Civil Design Group, LLC (UC) - An emergency access easement has
been added to the drive lane within the parking area.
Comment Number: 2 Comment Originated: 04/19/2016
04/19/2016: UTILITY PLAN
The fire line shown on the north side of the building and note #10, both referring
to a fire line, should be omitted from the plans.
United Civil Design Group, LLC (UC) - The design team is currently evaluating
whether to remove this fire line or provide a fire suppression system. This will be
addressed during final compliance.
Department: Stormwater Engineering
Contact: Jesse Schlam, 9701 12181 2932, ischlam cDfcQov.com
Topic: Erosion Control
Comment Number: 1 Comment Originated: 04/18/2016
04/18/2016: The site disturbs more than 10,000 sq _ft, therefore Erosion and
Sediment Control Materials need to be submitted f6r FDP. The erosion control
requirements are in the Stormwater Design Criteria under the Amendments of
Volume 3 Chapter 7 Section 1.3.3. Current Erosion Control Materials Submitted
do not meet requirements. Please submit; Erosion Control Plan (Redlines
returned with this submittal), Erosion Control Report, and an Escrow / Security
Calculation. If you need clarification concerning this section, or if there are any
questions please contact Jesse Schlam -111218112932 or email
@jschlam(cDfcgov. com
United Civil Design Group, LLC (UC) - Acknowledged, the Erosion Control
Report and materials will be submitted during the FDP phase. The redlines have
been addressed and the revisions included within the PDP resubmittal.
Contact: Wes Lamarque, 970 [1 416 i2418, wlamargue(&-fcgov.com
Page 6 of 9
City of Fort Collins
Building Services
Plan Review
4161-.2341
Department: Light And Power
Contact: Rob Irish, 9701 2241 6167, rirish(cDfcaov.com
Topic: General
Comment Number: 1 Comment Originated: 04/19/2016
04/19/2016: The feed for this site will come from an oval vault at the Northeast
corner of the site. The transformer location looks good. Please maintain 3'
minimum distance around the transformer with shrubs or bushes.
Ripley Design, Inc. (RDI) - Acknowledged
Comment Number: 2 Comment Originated: 04/19/2016
04/19/2016: Any relocation or modification to existing electric facilities will be at
the expense of the owner/developer. If Light & Power's existing electric facilities
are to remain within the limits of the project they must be located within a utility
easement.
United Civil Design Group, LLC (UC) - Acknowledged. At this time we do not
anticipate the relocation of any known existing electric facilities.
Comment Number: 3 Comment Originated: 04/19/2016
04/19/2016: A C 1 Form and a One _line diagram will need to be submitted to
Light & Power E4neering for review.' Please click on the following link for the
C__1 Form.
orms uidelines regulations
Ackn wledged.
Comment Number: 4 Comment Originated: 04/19/2016
04/19/2016: Electric Capacity Fee and Building Site charges will apply to this
development. Please click on the following link for Estimated Light & Power
charges and the Light & Power Fee calculator.
Comment Number: 5 Comment Originated: 04/19/2016
04/19/2016: Please contact Light & Power Engineering if you have any questions
at 221 6700. Please reference our policies, development charge processes, and
use of fee estimator at
http://www.fcgov.com/utilities/business/builders and developers
Acknowledged. 1'
Department: Outside Agencies
Contact: Jason Holland, 970r2241 16126, jholland(cMcgov.com
Topic: General
Comment Number: 1 Comment Originated: 04/22/2016
Page 5 of 9
2. Multi _family and Condominiums 3 stories max: 2012 IECC residential
chap6r.
3. Commercial and Multi family 4 stories and taller: 2012 IECC commercial
chapter. '
Project specific concerns:
1. Fire Isprinkler systems are required for buildings over 5000 sq.ft. or fire
containment.
2. Building code and State statute CRS 9LI5 requires project provide
accessible units.
3. Upgraded insulation is required for buildings using electric heat or
cooling.
4. Exterior walls and roof must meet a STC (sound resistance) rating of 40
min. if building located within 1000ft to train tracks.
5. Low_ flow Watersense plumbing fixtures (toilet, faucets, shower heads)
are required.
6. Special combustion safety requirements for natural draft gas appliances.
7. Low VOC interior finishes.
Page 4 of 9
County. The dedication of easements is required prior to sign off of the mylars. I
believe PFA will require an emergency access easement as an additional
easement dedicated to the City for the drive aisle west of the building.
United Civil Design Group, LLC (UC) - Easement documents will be prepared for
each easement required for the project and will be submitted during the FDP
phase of the project. An emergency access easement has been added to the
project to satisfy PFA requirements.
Department: Environmental Planning
Contact: Kelly Kimple, 9701J416i 2401, kkimpleAfcgov.com
Topic: General
Comment Number: 1 Comment Originated: 04/19/2016
04/19/2016: No comments at this time.
Ripley Design, Inc. (RDI) - Acknowledged
Department: Internal Services
Contact: Russell Hovland, 970i ,416, 2341, rhovland(a)fcgov.com
Topic: Building Insp Plan Review
Comment Number: 1 Comment Originated: 04/15/2016
04/15/2016: Building Permit Pre Submittal Meeting:
Pre Submittal meetings are required to assist the designer/builder by assuring,
earlIy on in the design, that the new commercial or multi family projects are on
track to complying with all of the adopted City codes and'Standards listed below.
The proposed project should be in the early to mid design stage for this meeting
to be effective and is typically scheduled after the Current Planning conceptual
review meeting. Applicants of new commercial or multi _family projects are
advised to call 416 2341 to schedule a pre submittal (meeting. Applicants
should be preparedoto present site plans, floor plans, and elevations and be able
to discuss code issues of occupancy, square footage and type of construction
being proposed.
Construction shall comply with the following adopted codes as amended:
2012 International Building Code (IBC)
2012 International Residential Code (IRC)
2012 International Energy Conservation Code (IECC)
2012 International Mechanical Code (IMC)
2012 International Fuel Gas Code (IFGC)
2012 International Plumbing Code (IPC) as amended by the State of Colorado
2014 National Electrical Code (NEC) as amended by the State of Colorado
Fort Collins has amendments to most of the codes listed above. See the
fcgov.com web page to view them.
Accessibility: State Law CRS 9 5 & ICC/ANSI A117.1 2009.
Snow Load Live Load: 30 PSF �/ Ground Snow Load 3(�PSF.
Frost Depth: 30 inches.
Wind Load: 100 MPH 3 Second Gust Exposure B.
Seismic Design rCategory B.
Climate Zone: Zone 5
Energy Code Use:
1. Single Family; Duplex; Townhomes: 2012 IRC Chapter 11 or 2012 IECC.
Page 3 of 9
Department: Engineering Development Review
Contact: Marc Virata, 9701 221 F6567, mvirata(Dfcgov.com
Topic: Construction Drawings
Comment Number: 6 Comment Originated: 04/19/2016
04/19/2016: The civil drawings don't appear to label the existing 15' utility and
drainage easement behind Boardwalk Drive, please indicate the existence of this
easement.
United Civil Design Group, LLC (UC) - Labels have been added to all sheets
showing the easement.
Topic: General
Comment Number: 1 Comment Originated: 04/19/2016
04/19/2016: The plans show Oakridge Drive along the northern boundary of the
property. I'm of the belief that this roadway is a private roadway and isn't actually
given the name Oakridge Drive. Under this premise, the plans should just
remove the indication of Oakridge Drive and perhaps just indicate it as a private
drive (or no indication at all).
United Civil Design Group, LLC (UC) - The Oakridge Drive label has been
removed.
Comment Number: 2 Comment Originated: 04/19/2016
04/19/2016: Operating again under the belief that "Oakridge Drive" is not a public
street north of the property, but a private drive, Engineering does not have
jurisdiction on frontage improvements along the private drive and as such the
removal of the 4.5' attached walk and replacement with a 5' attached walk isn't
required, inspected, and/or required to be secured through Engineering. Likewise
parking stall setbacks on Figure 19 6 of LCUASS are not enforceable by
Engineering with this being a private drive.
United Civil Design Group, LLC (UC) - Acknowledged.
Comment Number: 3 Comment Originated: 04/19/2016
04/1912016: The new attached sidewalk, drive approach, and other work
occurring north of the property line shown on the drawings appear to in a private
drive that is part of the Miramont Office Park development. The plat Miramont
Office Park shows that the drive is in a drainage, access, and utility easement
that is conveyed for public use. We've taken the interpretation then that the rig ht
to construct the improvements north of the property already exist with the access
easement being granted. That said, has this developer contacted the property
owner to the north on the intention to work within their property?
United Civil Design Group, LLC (UC) - The property owner has been advised of
the work currently proposed within the private access easement.
Comment Number: 4 Comment Originated: 04/19/2016
04/19/2016: The repay for sidewalk work constructed along Boardwalk Drive
mentioned as part of the conceptual review for this project still applies. This
repay is required prior to building permit.
United Civil Design Group, LLC (UC) - Acknowledged.
Comment Number: 5 Comment Originated: 04/19/2016
04/19/2016: Easements dedicated to the City such as the drainage easement
along the southern boundary require a $250 Transportation Development
Review Fee for each dedication along with recording fees assessed by Larimer
Page 2 of 9
Fort Collins
Community Development and
Neighborhood Services
281 North College Avenue
PO Box 580
Fort Collins, CO 80522
970.221.6750
970.224.6134 - fax
fcgov. corn/developmentmview
April 22, 2016
Russ Lee
RIPLEY DESIGN
419 Canyon Ave., Suite 200
Fort Collins, CO 80521
RE: Angie Lee Periodontics, PDP160012, Round Number 1
Please see the following summary of comments from City staff and outside reviewing agencies for your
submittal of the above referenced project. If you have questions about any comments, you may contact
the individual commenter or direct your questions through the Project Planner, Jason Holland, at 970-
224-6126 or iholland(aD.fcoov.com.
Consultant Responses: (please have responses completed by 4129/16)
Ripley Design, Inc. (RDI).....
United Civil Design Group, LLC (UC).....
VFLA (V)....
SRB Consulting Engineering, LLC (SRB).....
Comment Summary.
Department: Planning Services
Contact: Jason Holland, 9701 12241 6126, iholland(&fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 04/20/2016
04/20/2016: Parkway trees need to be adjusted around the existing street light
with 15740' setbacks from the light. Would recommend all ornamentals.
Ripley Design, Inc. (RDI) - Trees have been adjusted to within suggested
distances.
Comment Number: 2 Comment Originated: 04/22/2016
04/22/2016: Please send me updated PDF's and a comment response letter and
I will review prior to scheduling the hearing. I will send you several potential dates
and coordinate further. After the hearing we will circle back with the rest of staff
with a final plan review.
Ripley Design, Inc. (RDI) - Acknowledged
Page 1 of 9