Loading...
HomeMy WebLinkAboutBOARDWALK CROSSING, LOT 2, FILING 2 - FDP - 76-93C - CORRESPONDENCE - (3)AA r!,I:q t7JA 111t — - -------- I o Stormwater Water/Wastewater/FCLWD Traffic Operations iiiim sii®®� immmmm 111dirliv-SIVIN mmmmmm maouEmrarg mmmmm none M1.13, �-� mmomm �-�Mmmmm mmmmm W!"AMWOR9 MMM EMEMM SOMMIM-0 EMEMM mmmmm Other: I Note:, All redlimbd items should be returned with '114 resibmittal/r6visions. appointment. 1 � 4 This completes staff (and outside reviewing agencies) review and comments at this time. Red -lined plan from City departments are included with this comment letter. Additional comments and red -lined plans may be forthcoming. Another round of staff review may be necessary. This proposal is subject to the 90-day revision re - submittal requirement (from the date of this comment letter, being May 31, 2005) as set forth in Section 2.2.11(A) of the Land Use Code. Be sure and return all of your red -lined plans when you re -submit. The number of copies of each document to re -submit is shown on the attached Revisions Routing Sheet. If you have any questions regarding these issues or any other issues related to this project, please feel free to call me at 221-6341. Yours '' ,Truly, 4�C.ov— Steve Olt City Planner cc: Katie Moore Current Planning File #76-93C Page 2 10 a City of Fort Collins STAFF PROJECT REVIEW Architecture West LLC 4710 South College Avenue Fort Collins, CO. 80525 Date: 05/31 /2005 Staff has reviewed your submittal for BOARDWALK CROSSING, LOT 2, FILING 2 - FINAL COMPLIANCE, and we offer the following comments: ISSUES: Department: Engineering Issue Contact: Katie Moore Topic: General Number: 31 Created: 7/7/2004 [5/17/05] [3/15/05] [12/2/04] [7/7/04] Please see redlines for any additional comments. Number: 54 Created: 3/15/2005 [5/17/05] The deeds need to be revised - see redline provided by our attorney. [3/15/05] Please submit deeds of dedication, sketches, and legal descriptions for all easements to be dedicated with this project (public access easement, 1' utility easement, drainage) and submit a sketch and legal for the drainage easement to be vacated. Number: 62 Created: 5/17/2005 [5/17/05] Please cross out "a plat of on the easement exhibit. Department: Stormwater Utility Issue Contact: Wes Lamarque Topic: Drainage Number: 36 Created: 7/g/2004 [5/17/05] [3/18/05] Repeat Comment [12/10/04] A drainage easement is required for the detention pond. The existing drainage easement needs to be vacated for the part that is in conflict with the proposed building. Number: 55 Created: 3/18/2005 [5/17/05] [3/18/05] The elevations on the water quality outlet structure do not match the elevations on the drainage plan or in the report. The WQ outlet structure will need to be revised. Page 1