Loading...
HomeMy WebLinkAboutBOARDWALK CROSSING, LOT 2, FILING 2 - FDP - 76-93C - CORRESPONDENCE -Department: Zoning Issue Contact: Peter Barnes Topic: zoning Number.- 7 Created: 6/23/2004 [2/25/05] They've added a second note #6 to the site plan to address this. It should be renumbered to V. However, the note is not acceptable. it should simply state that pole mounted light fixtures will be down directional, and the pole height will be x feet. If shouldn't refer to a note on another sheet. Also, it refers to "lighting mounted on ground". I don't believe there's any ground -mounted lighting. [12/2/04] The wording of this note has been changed, but there are still pole fixtures shown that aren't addressed in the note as to down directional, height of poles, etc. [6/23/04] General Note #6 implies that all exterior lighting will be building mounted, yet there are pole fixtures shown on the site plan. If there are to be pole fixtures, then the note should address those as well (i.e., down directional, height of poles, etc). If there aren't going to be any poles, then remove them from the site plan. This completes staff (and outside reviewing agencies) review and comments at this time. Red -lined plan from City departments are included with this comment letter. Additional comments and red -lined plans may be forthcoming. Another round of staff review is determined to be necessary. This proposal Is subject to the 90-day revision re -submittal requirement (from the date of this comment letter, being April 6, 2005) as set forth in Section 2.2.11(A) of the Land Use Code. Be sure and return all of your red -lined plans when you re -submit. The number of copies of each document to re -submit is shown on the attached Revisions Routing Sheet. If you have any questions regarding these issues or any other issues related to this project, please feel free to call me at 221-6341. Yours Truly, Atz17C/t Steve Olt City Planner cc: Katie Moore Current Planning File #76-93C Page 3 Department: Light & Power Topic: General Number. 53 [2/25/05] No Comments. Department: Natural Resources Topic: General Number: 60 [3/23/05) No issues. Issue Contact: Doug Martine Created: 2/25/2005 Issue Contact: Doug Moore Created: 3/23/2005 Department: Stonnwater Utility Issue Contact: Wes Lamarque Topic: Drainage Number 36 , Created:7/9/2004 [3/18/05] Repeat Comment [12/10/04] A drainage easement is required for the detention pond. The existing drainage easement needs to be vacated for the part that is in conflict with the proposed building. Number: 55 Created: 3/18/2005 [3/18/05] The elevations on the water quality outlet structure do not match the elevations on the drainage plan or in the report. The WQ outlet structure will need to be revised. Number. 56 Created: 3/18/2005 [3/18/05] Rust proofing is required for the WQ outlet structure grate. Number. 57 Created: 3/18/2005 [3/18/05] The diameter for the orifice on the outlet pipe does not match the calculation in the report. Please revise. Department: Transportation Planning Issue Contact: David Averill Topic: General Number: 59 Created: 3/22/2005 [3/22/05] All previous comments addressed and nothing new to add. Thanks. Department: Water Wastewater Issue Contact: Roger Buffington Topic: General Number: 58 Created: 3/20/2005 [3/20/05] No comments. Page 2 STAFF PROJECT REVIEW City of Fort Collins ARCHITECTURE WEST LLC Date: 03/22/2005 4710 S. COLLEGE AVE. Revised: 04/06/2005 FT. COLLINS, CO 80525 Staff has reviewed your submittal for BOARDWALK CROSSING, LOT 2, FILING 2 PDP AND FINAL COMPLIANCE, and we offer the following comments: ISSUES: Department: Current Planning Issue Contact: Steve Olt Topic: General Number. 61 Created: 4/6/2005 [4/6/05] See red -lined Site and Landscape Plans for comments. Department: Engineering Issue Contact: Katie Moore Topic: General Number. 21 Created: 7/7/2004 [3/15/05] Just one location on northernmost ramp where slope is a bit too steep. [12/2/04] Due to new ADA requirements, and difficulties encountered with constructing ped ramps at comers, additional detail and spot elevations are needed for the design of the comer ramps to ensure ADA compliance. [7/7/04] Please provide both directional ramps on the northwest comer of the site. Number: 28 Created: 7/7/2004 [3/15/05] The only scanning issue that might still be a problem is the grey lines - they may not show up. If you'd like, some morning during the week you could bring in a set of plans and do a test scan to see. Ask at Technical Services. [12/2/04] There are still areas of the plans needing attention regarding scanability. [7/7/04] Please review appendix E-10 In LCUASS for the City's scanability requirements for all plan sheets and revise plans as necessary. Number: 31 Created: 7/7/2004 [3/15/05] [12/2/04] [7/7/04] Please see redlines for any additional comments. Number: 54 Created: 3/15/2005 [3/15/05] Please submit deeds of dedication, sketches, and legal descriptions for all easements to be dedicated with this project (public access easement, 1' utility easement, drainage) and submit a sketch and legal for the drainage easement to be vacated. Page 1