Comment Number: 2 Comment Originated: 06/14/2016
06/14/2016: Irrigation plans are required no later than at the time of building
permit. The irrigation plans must comply with the provisions outlined in Section
3.2.1(J) of the Land Use Code. Direct questions concerning irrigation
requirements to Eric Olson, at 221-6704 or eolson@fcgov.com
Department: Water -Wastewater Engineering
Contact: Heather McDowell, 970-224-6065, hmcdowell &fcgov.com
Topic: General
Comment Number: 1
06/14/2016: No comments
Department: Zoning
Contact: Noah Beals, 970-416-2313, nbeals@fcgov.com
Topic: General
Comment Number: 1
06/15/2016: Where are the signature blocks?
Comment Originated: 06/14/2016
Comment Originated: 06/15/2016
comments that would need to be addressed for City criteria. If you need
clarification concerning the erosion control section, or if there are any questions
please contact Jesse Schlam 970-218-2932 or email @ ischlam(o)fcgov.com
JAV Response: Notes have been added to the Erosion Control Plan and the Details for inlet
protection to meet the MS4 with high traffic inlet protection.
Department: Technical Services
Contact: Jeff County, 970-221-6588, icountya()fcgov.com
Topic: Construction Drawings
Comment Number: 2
Comment Originated: 06/14/2016
06/14/2016: The City has moved to the NAVD88 vertical datum, and as of
January 1, 2015, all projects are required to be on NAVD88 datum. Please
provide the following information for the Benchmark Statement in the EXACT
format shown below.
PROJECT DATUM: NAVD88
BENCHMARK # w/ DESCRIPTION
ELEVATION:
BENCHMARK # w/ DESCRIPTION
ELEVATION:
PLEASE NOTE: THIS PLAN SET IS USING NAVD88 FOR A VERTICAL
DATUM. SURROUNDING DEVELOPMENTS HAVE USED NGVD29
UNADJUSTED FOR THEIR VERTICAL DATUMS.
IF NGVD29 UNADJUSTED DATUM IS REQUIRED FOR ANY PURPOSE,
THE FOLLOWING EQUATION SHOULD BE USED: NGVD29 UNADJUSTED
= NAVD88 - X.XX'.
JVA Response: The statements have been added in the format and above.
Comment Number: 3 Comment Originated: 06/14/2016
06/14/2016: All benchmark statements must match on all sheets.
JVA Response: The benchmark statements have been changed to match.
Comment Number: 4 Comment Originated: 06/14/2016
06/14/2016: There are line over text issues. See redlines.
JVA Response: The line over text issues have been resolved.
Topic: Landscape Plans
Comment Number: 1 Comment Originated: 06/14/2016
06/14/2016: There are line over text issues. See redlines.
Department: Water Conservation
Contact: Eric Olson, 970-221-6704, eolson(a)fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 06/14/2016
06/14/2016: A landscape plan shall contain accurate and identifiable
hydrozones, including a water budget chart that shows the total annual water
Comment Number: 2
Comment Originated: 06/14/2016
06/14/2016: The Drainage Report mentions the location and elevation of the
restrictor plate. Please make sure this information is included in the outlet
structure details.
JVA Response: The note on the outlet structure detail calls out the dimension from flowline, a
dimension has been added for clarity as well.
Comment Number: 3
Comment Originated: 06/14/2016
06/14/2016. See Redlines for other comments/questions.
Comment: C0.3 Demo Existing Storm Pond Outlet Structure — Remove Complete?
JVA Response: Since the structure is very deep, and will be below the new parking lot, the
contractor has the option to demo the top, and flow fill the rest.
Comment: C0.3 The entire west side of the mh is going to be gone — may want to consider new MH risers
in the area
JVA Response: Depending on the contractors means and methods, they can either replace the
manhole riser or patch the punchout.
Comment: C1.0 Future ROW — when is this being dedicated and by which mechanism?
JVA Response: This ROW has already been dedicated, notes throughout
plans have been edited accordingly, and the old ROW removed.
Comment: C1.0 Are you regrading this part of parking lot?
JVA Response: No regrading, but the final lift of asphalt will be installed. The topographic
information does not precisely match the approximately 2" of final asphalt lift that still need to be
constructed. The curbs, gutters, and valley gutters already installed will remain.
Comment: C1.0 show 100-yr WSEL
JVA Response: 100-yr WSEL has been added to plans.
Comment: C1.0 Ex Pipe?
JVA Response: Existing Pipe has been is now shown.
Comment: C1.0 Existing Spot Elevations
JVA Response: Spot elevations have been added.
Comment: C1.0 10 scale for this?
JVA Response: Yes, scales have been moved to make more clear.
Comment: C1.0 Existing Manhole circled
JVA Response: The manhole is existing and will remain.
Comment: CD1.0 Elevations and dimensions callouts
JVA Response: These callouts have been added.
Comment: C3.0 Calout or label Curb cut
JVA Response: The callout is on C1.0 and has been added to C3.0.
Contact: Jesse Schlam, 970-218-2932,
Topic: Erosion Control
Comment Number: 1
0schlam(a.fcpov.com
Comment Originated: 06/14/2016
06/14/2016: These materials were reviewed to meet City erosion control
criteria however it was the understanding that these were to be transferred over
to the CSU MS4. A letter from CSU's MS4 Coordinator will be needed
explaining their taking jurisdictional responsibility for this project at time of title
transfer. That being said the erosion control report and escrow meet City
criteria. Erosion Control Plan has two redlines (perimeter concerns and the
outlet structure in the basin needs more protection than just a simple IP)
Whitcomb Street and Lake Street. Please describe this maintenance
responsibility on the Landscape Plan.
05/31 /2016:
Who will be responsible for maintaining the street trees along Whitcomb Street
and Lake Street? CSU or City?
Comment Number: 5
Comment Originated: 06/16/2016
06/16/2016:
Continued:
Some of the remaining existing trees appear that they might be suitable for
retention? It is recommended that any existing trees that will be retained be
marked on the plan as to species, size and condition and also to include
appropriate tree protection notes. It appears that one tree is shown for retention
along Whitcomb but may not be identified. If CSU would like City Forestry staff
to help review this tree or any others contact City Forester for an onsite meeting.
05/31 /2016:
Will any existing trees that are suitable be retained on the project? City Forester
is available to review onsite with campus staff.
Comment Number: 6
Comment Originated: 06/16/2016
06/16/2016:
Please change the two street trees along Prospect to a species that is on the
City of Fort Collins Street
Tree List. Two possible choices would be Hackberry or Espresso Kentucky
Coffeetree.
Comment Number: 7
Comment Originated: 06/16/2016
06/16/2016:
Some Caddo Maple planted in Fort Collins have done OK. Caddo maple used
in the parking lot islands at the Gardens on Spring Creek have not fared well.
The project might want to consider a different species for the parking lot islands.
Comment Number: 8
Comment Originated: 06/16/2016
06/16/2016:
Greater tree diversity could provide better chance of a reducing the potential
impact from uniform senescence or a future epidemic insect or disease
problem.
Comment Number: 9 Comment Originated: 06/16/2016
06/16/2016:
The 4 foot parkway width on Lake is substandard and very narrow. Can it be
widened to at least the 5 foot minimum width street standard? For narrow
parkways City Forestry often recommends an ornamental species with upright
form. A wider parkway with canopy shade trees seems a preferred option.
Comment Number: 10
Comment Originated: 06/16/2016
06/16/2016:
The Standard Street Tree notes should be placed on the landscape plan for the
two street trees along Prospect which the City will be maintaining.
Department: Stormwater Engineering
Contact: Heather McDowell, 970-224-6065, hmcdowell a()fcgov.com
Topic: General
curb transitions on Whitcomb Street,
JVA Response: Note has been added.
Comment Number: 6 Comment Originated: 06/15/2016
06/15/2016: 6. C1.0 — the Lake/ Whitcomb ramp — with the design shown did
you end up meeting the 2 foot separation from the fire hydrant. I don't want to
end up with issues out in the field if that is not being met. Label that 2 foot clear
min around the fire hydrant shall be met.
JVA Response: Sidewalk has been changed and label added to C3.0.
Comment Number: 7 Comment Originated: 06/15/2016
06115/2016: 7. Add a note or somehow identify that the portion of the
cross -pan is temporary and will be replaced when the cross -pan is
reconstructed with the sewer work.
JVA Response: Note added in C3.0 with hatching identified as temporary.
Comment Number: 8
Comment Originated: 06/15/2016
06/15/2016: 8. Trugrid Eco pavers — what are these? Will need to see detail
and spec on these before we can approve them to be installed within the ROW.
A detail of such will need to be placed on the plans — also make it clear that they
are not to be located in the sidewalk area.
JVA Response: Details and Specs sent to the City, added detail to CD3.2.
Comment Number: 9
Comment Originated: 06/15/2016
06/15/2016: 9. C3.0 — The Whitcomb/ Prospect curb return is shown as a 20
foot radii. Per standards this can be 25 foot. I thought you had been looking at
increasing this radii, did that not work?
JVA Response: A 20' curb radii would have encroached too closely to the existing traffic/electrical
vault. We felt it would be a better design to provide a greater clearance between the curb and traffic
signal/vaults.
Comment Number: 10 Comment Originated: 06/15/2016
06/15/2016. 10. CD3.0 — most of the details on this plan need to be labeled
'On -Site' since they are for on -site work only.
JVA Response: Details labeled as ON -SITE.
Comment Number: 11
Comment Originated: 06/15/2016
06/15/2016: 11. Detail 1601 also needs to be provided - to show the
thickened sidewalk section at the emergency access point.
JVA Response: The detail has been added and called out.
Comment Number: 12
Comment Originated: 06/15/2016
06/15/2016: 12. The landscape plan - it doesn't show the portion of attached
sidewalk on Whitcomb and needs to show that the first couple parking spaces
are not car parking spaces.
Department: Forestry
Contact: Tim Buchanan, 970-221-6361, tbuchanan@fcgov.com
Topic: Landscape Plans
Comment Number: 1 Comment Originated: 06/16/2016
06/16/2016:
Continued. -
In discussion with the Campus Landscape Manager the City will maintain street
trees along Prospect and CSU will be responsible for street trees along
Fort Collins
Community Development and
Neighborhood Services
281 North College Avenue
PO Box 580
Fort Collins, CO 80522
970.221.6750
970,224 6134 - fax
fcgov. com/developmentreview
June 20, 2016
RE: Whitcomb Street & Aggie Village North Utility Plans, FDP160026, Round
Number 1
Please see the following summary of comments from City staff and outside reviewing
agencies for your submittal of the above referenced project. If you have questions about
any comments, you may contact the individual commenter or direct your questions through
the Project Planner, Jason Holland, at 970-224-6126 orjholland@fcgov.com.
Comment Summary:
Department: Engineering Development Review
Contact: Sheri Langenberger, 970.221-6573, slangenberger(a)fcgov.com
Topic: General
Comment Number: 1
Comment Originated: 06/15/2016
06/15/2016: Please change the title of the plans to: Whitcomb Street from
Prospect Road to Lake Street Improvements.1. Please change the title of the
plans to: Whitcomb Street from Prospect Road to Lake Street Improvements.
JVA Response: Title of the plans has been changed.
Comment Number: 2
Comment Originated: 06/15/2016
06/15/2016: 2. These plans indicate that the striping is not a part of these
plans. Which set will have the striping plan?
JVA Response: Label has been added to C3.0 about striping, bike lane per detail and other striping
Installed by Mortensen with Whitcomb St. Overlay.
Comment Number: 3
Comment Originated: 06/15/2016
06/15/2016: 3. The right-of-way along here has already been dedicated and
recorded, so unfortunately all your labels about existing and future ROW are
incorrect.
JVA Response: Old ROW has been removed from all sheets and new ROW is labeled as the ROW.
Comment Number: 4
Comment Originated: 06/15/2016
06/15/2016: 4. CO — please add onto demo note #3 Any fencing to be
placed within the right-of-way requires approval of an encroachment permit by
City of Fort Collins.
JVA Response: Note has been edited.
Comment Number: 5 Comment Originated: 06/15/2016
06/15/2016: 5. C0.3 — please add a new note: Remove previously installed