Loading...
HomeMy WebLinkAboutTIMBERVINE PDP - PDP140002 - SUBMITTAL DOCUMENTS - ROUND 1 - APPLICATION (3)WATE INT PROPOSED WATER MAIN CONNECTION TO EXISTING MAIN IN ZURICH 1 SEWER SEWER rH PATER MAIN SPUR NORTH �•� 1------------------ EXISTING SANITARY SEWER '--"-""-"-----"--•EXISTING WATER MAIN tMoomommft Timbervine t' Civil/Utilities Plan MACKINAC ST. CONNECTION Single GaciL 4-5Tx�ltad Front Inad Lots-SYx tl 11 Units Alley lead lds -inrge Aa+e'. A3' 16 Units, Alley Load Lots - Small FI 3�a63' 9 Units Sin91e Family AltaMed Aunfit ed-30.W r 76' 21 UNts Tosal Unds=168 4SI W/AC TO INTERNATIONAL BLVD. I. IF I HAATFORD -SO'BUFFEfl 1. l Jj �c. EENBELT/COMMONS j{I STING DITCH t Mo TRAIL +/- 1 MILE � Oscu6 r-eoa Timbervine Concept Plan 0 f � Timbervine Project Context Description of Proposal: The property is currently within the LMN Zone District. Redevelopment of the property to include a total of 168 units of Single Family Residential lots with four types proposed including: • Single Family Detached Front Loaded • Single Family Detached Alley Loaded • Small Lot Single Family Detached Alley Loaded • Single Family Attached The project is buffered from adjacent uses with a continuous open space edge condition. This will allow a loop trail system potentially connecting to adjacent parcels to the north, south, and west. An existing irrigation ditch at the east of the parcel creates a buffer/transition from the neighboring mobile home park. Midblock greenbelts create an additional open space amentiy within the interior lots and will function as additional trail connections to the open space edge through interior open tracts. Alley loaded townhomes are proposed at the southeast of the site, adjacent to a 1 acre park at the southeast corner. Access to the site is proposed from International Blvd. to the south portion of the parcel. Access from Macki- naw St. within the Dry Creek residential community is proposed at the west end of the property. An existing 50' easement at the west end of the property is shown and preserved. Sanitary sewer: Boxelder Sanitation District has an existing main in International Boulevard. There is also an existing stub directed north in Mexico Way. This main will be extended north to the project where a standard 8" distribution grid will be provided within the subdivision. Water: ELCO Water District has an existing main in International Boulevard and within the Dry Creek subdivision. There is also an existing stub extended north in Mexico Way and a stub is extended to the west boundary from the Dry Creek subdivision. A main will be extended north in Mexico Way to the project. A standard 8" distribu- tion grid will be provided in the subdivision. If necessary a connection could also be made at the southeast corner of the site where a water main could be tied to the existing 8" main located at the east end of Zurich. Drainage: On -site detention will be provided with release southerly along Mexico way within a sub -surface storm drain. The drainage analysis completed for the Industrial Business Park International PUD addressed drainage from the proposed project site and notes a maximum discharge during the 100-year storm. The project site will con- sider this in the drainage design and release detained flow to the median of International Boulevard. An outlet exists from this median per the noted drainage analysis. Low Impact Development strategies will be explored to decrease the required detention volume, while serving to enhance water quality at the same time. Timberline Rd & Vine Or Single Family Homes TIN—ap I., aY.Wr�rl W�P�r aF..v w.MarV`wlwwr,JW lu o.".rM M^`mnW. an.w+dtl.Gbflrpnf+.�hfw`w.r�.,n...u.a,.ar,ol,.N�,uaman.�r...e mahxwr.Iw.w�rrW.h.hwamwmwaM.a.. wn M .yy�- pfPMlfldMM..>p�PIMINaboefmnl.nymp leMuw lllwww. MF CIrvOF'ON, MI I. MP WNFH NO WANRANtt OF MERCR/ TMtLITY OR WARRANTY fM 1 City of FIf11Ep Of 11SE RORPMII(.'LLMVIIRPJNf.f,MPRE.E00NIMW IFO WITD.,8fICI 1.I..F NAPM1001ICINOR ME UNDERLYING DATA. MYrr.Wm map Fort Collins IfOW.IIAyplYlfoh,aCq,puOf ur AYIM. WItN AIL FAULT9. w�mvarrpnhCNy MIM1.uM NIW.Ytl NGIW enwMvtl pnw bhN Oh CJylrnllr. pwNfPlat.v.Nnuw W...IwNiH a.YM MmInY�n.mRwm.o PwNal.I..wr�L.�hw,aw.DN+rWgma.nll.nlml.m,.,.um n,yrarlrWYhfmnl WlNn I WYNIIYhaniAl ln.WM1lntWhrYin.n h111wr Mwl✓h, u�MrlNp`ah. IIw CA'.Ipnlr, mlYhf �`o�iW NM YGMb.nl Mrl aOYnip.Fx wIMLMp. +IhTvdrM I wtlYml. u mnryuMM. Mnd, nnw. ur meY unr M1wi tlww m.o Gn,Mh w M r.r Irya,.pl Lv unv Iwnon a h�My. City Of Development Review Guide — STEP 2 of 8 F6rtCollins CONCEPTUAL REVIEW: APPLICATION General Information All proposed development projects begin with Conceptual Review. Anyone with a development idea can schedule a Conceptual Review meeting to get feedback on prospective development ideas. At this stage, the development idea does not need to be finalized or professionally presented. However, a sketch plan and this application must be submitted to City Staff prior to the Conceptual Review meeting. The more information you are able to provide, the better feedback you are likely to get from the meeting. Please be aware that any information submitted may be considered a public record, available for review by anyone who requests it, including the media. Conceptual Reviews are scheduled on three Monday mornings per month on a "first come, first served" basis. One 45 meeting is allocated per applicant and only three conceptual reviews are done each Monday morning. Conceptual Review is a free service. Complete applications and sketch plans must be submitted to City Staff no later than 5 pm, two Tuesdays prior to the meeting date. Application materials must be e-mailed to currentplanning(a)fcgov.com. If you do not have access to e-mail, other accommodations can be made upon request. At Conceptual Review, you will meet with Staff from a number of City departments, such as Community Development and Neighborhood Services (Zoning, Current Planning, and Development Review Engineering), Light and Power, Stormwater, Water/Waste Water, Advance Planning (Long Range Planning and Transportation Planning) and Poudre Fire Authority. Comments are offered by staff to assist you in preparing the detailed components of the project application. There is no approval or denial of development proposals associated with Conceptual Review. At the meeting you will be presented with a letter from staff, summarizing comments on your proposal. *BOLDED ITEMS ARE REQUIRED* `The more info provided, the more detailed your comments from staff will be.* Contact Name(s) and Role(s) (Please identify whether Consultant or Owner, etc) Craio Russell. RLA Planner Business Name (if applicable) Russell + Mills Studios Your Mailing Address 141 S. College Ave, Suite 141, Fort Collins, CO 80525 Phone Number (970) 484-8855 Email Address crussell@russellmillsstudios.com Site Address or Description (parcel # if no address) 8708200048 Description of Proposal (attach additional sheets if necessary) See attached sheet Proposed Use Residential Total Building Square Footage 168 Units Existing Use no structures - previously farmed S.F. Number of Stories 2 max. Lot Dimensions 39.5 AC total Age of any Existing Structures No Existing Structures on Site Info available on Larimer County's Website: http://www.co.larimer.co.us/assessor/query/search.cfm If any structures are 50+ years old, good quality, color photos of all sides of the structure are required for conceptual. Is your property in a Flood Plain? ❑ Yes ® No If yes, then at what risk is it? Info available on FC Maps: http://gis.fcgov.com/fcmaps/fcmap.aspx Click Floodplains tab and zoom to property. Increase in Impervious Area 500,000 S.F. (Approximate amount of additional building, pavement, or etc. that will cover existing bare ground to be added to the site) Suggested items for the Sketch Plan: Property location and boundaries, surrounding land uses, proposed use(s), existing and proposed improvements (buildings, landscaping, parking/drive areas, water treatment/detention, drainage), existing natural features (water bodies, wetlands, large trees, wildlife, canals, irrigation ditches), utility line locations (if known), photographs (helpful but not required). Things to consider when making a proposal: How does the site drain now? Will it change? If so. what will change? Community Development & Neighborhood Services — 281 N College Ave — Fort Collins, CO 80522-0580 Conceptual Review Agenda Schedule for 09/16/13 to 09/16/13 281 Conference Room A Monday, September 16, 2013 Time Project Name Applicant Info Project Description Planner 9:30 Vine Dr d Timberline Rd - Single Craig Russell This is a request to create single family lots located Pete Wray Family 970-484-8855 on land south and west of the Timberline Road and crussell russellmillsstudlos.com Vine Drive intersection Parcel# 87082-00-048 . The ( ) overall site is 39.5 acres and would contain 168 single family lots in four housing types. The site is located in the Low Density Mixed -Use Neighborhood (L-M-N) Zone District. Single family homes are subject to Administrative (Type 1) review in the LMN 10:15 1032 W Mountain Ave Mixed -Use Justin Larson This is a request to construct a mixed -use building Courtney Levingston 970-224-1191 located at 1032 West Mountain Ave (Parcel# iustinAv0a.co 97113-02.017). The existing fuel station would be replaced with a new mixed -use building consisting of six single family attached dwelling units and commerciallretail space. The site is located in the Low Density Mixed -Use Neighborhood (L-M-N) Zone District. Mixed -use dwellings are subject to Administrative (Type 1) review in the LMN Zone 11:00 409 Linden St - Parking Jesse Godinez This is a request to add parking behind an existing Noah Beals 970-310-71 DB single family home at 409 Linden Street (Parcel# 97122-08-006). The site is located in the River Downtown Redevelopment (R-D-R) Zone District Agenda as of 09/06/13 at 1:52 pm Page 1 of 1