HomeMy WebLinkAboutTIMBERVINE PDP - PDP140002 - CORRESPONDENCE - (5)Topic: Landscape Plan.
Comment Number: 3 Comment Originated: 05/13/2014
05/13/2014: Note 13 on LP103 needs to be corrected to show "shall NOT be planted...".
Comment Number: 4
Comment Originated: 05/13/2014
05/13/2014: Please add the following note: Landscape plantings installed within the public
street right-of-way need to conform to the current Sight Distance and intersection Sight Triangle
standards in Chapters 7 through 9 of the Larimer County Urban Area Street Standards. Tree
canopies should not obstruct visibility of traffic related Regulatory signage.
Topic: Traffic Impact Study
Comment Number: 5
Comment Originated: 05/13/2014
05/13/2014: This development is in an area with multiple challenging intersections and the TIS
analyzes the issues. We concur that TimberVine's contribution to various off -site traffic
operations are either temporary conditions or cannot be considered significantly negative.
Please provide an official variance request (and justification) for those locations where the
LCUASS Level of Service cannot be met.
Comment Number: 6
Comment Originated: 05/16/2014
05/16/2014: Pedestrian Level of Service: Destination 2 is the mobile home park to the east
and directness LOS is shown as A. With the existing ditch, this is not possible. Destination 3
is the neighborhood to the south. This neighborhood is not yet constructed and in fact no
sidewalks exist. TimberVine will be required to construct a sidewalk to and through this area to
connect to an existing sidewalk on International.
NGVD29 + 3.18, - imilar.
Comment Number: 6 Comment Originated: 05/13/2014
05/13/2014: There are line over text issues on several sheets. See redlines.
Comment Number: 7 Comment Originated: 05/14/2014
05/14/2014: There are text over text issues on several sheets. See redlines.
Comment Number: 8 Comment Originated: 05/14/2014
05/14/2014: There is text on sheets SS04 & SS05 that needs to be rotated 180 degrees. See
redlines.
Comment Number: 9 Comment Orginated: 05/14/2014
05/14/2014: The keymap needs to be corrected on sheet SS05. See redlines.
Topic: Easements
Comment Number: 10 Comment Originated: 05/14/2014
05/14/2014: The drainage easement is okay.
Topic: Landscape Plans
Comment Number: 11 Comment Originated: 05/14/2014
05/14/2014: Please change the legal description to match the Subdivision Plat.
Comment Number: 12 Comment Originated: 05/14/2014
05/14/2014: Please change the matchline numbering on sheets LP101 & LP102.
Topic: Plat
Comment Number: 14 Comment Originated: 05/14/2014
05/14/2014: There are many issues. Please make changes as shown on redlines.
Topic: Site Plan
Comment Number: 13 Comment Originated: 05/14/2014
05/14/2014: Please change the legal description to match the Subdivision Plat.
Department: Traffic Operation
Contact: Martina Wilkinson, 970-221-6887, mwilkinson(a)fcaov.com
Topic: Construction Drawings
Comment Number: 1 Comment Originated: 05/13/2014
05/13/2014: A signing and striping plan will be needed. This should include speed limit signs,
intersection control (stop signs internal to neighborhood), signs at median noses, etc. Street
name signs also need to be shown. Standard traffic signing and pavement marking
construction notes need to be included (contact me if you need a copy of those).
Comment Number: 2 Comment Originated: 05/16/2014
05/16/2014: Sight Distance at Mexico and International will need to accommodated.
Department: Stormwater Lugineering
Contact: Jesse Schlam, 970-218.2932, ischiam@fc-gov.com
Topic: Erosion Control
Comment Number: 1 Comment Originated: 05/14/2014
05/14/2014: The site disturbs more than 10,000 sq-ft and in a sensitive area, therefore Erosion
and Sediment Control Materials need to be submitted for FDP. The erosion control
requirements are in the Stormwater Design Criteria under the Amendments of Volume 3 Chapter
7 Section 1.3.3. Current Erosion Control Materials Submitted dose not meet requirements.
Please submit; Erosion Control Plan, Erosion Control Report, and an Escrow / Security
Calculation. If you need clarification concerning this section, or if there are any questions
please contact Jesse Schlam 970-218-2932 or email @ jschlam@fcgov.com
Contact: Wes Lamarque, 970-416-2418, wlamargue(Dfcaov.com
Topic: General
Comment Number: 2 Comment Originated: 05/15/2014
05/1512014: Amore defined LID treatment for basin A is needed and shown on the plans
before hearing. The City suggests doing another PLD pond at the northeast comer of Pond A.
Comment Number: 3 Comment Originated: 05/15/2014
05/15/2014: At final, Pond B needs more natural features including undulating contours to meet
our Landscape Standards.
Comment Number: 4 Comment Originated: 05/15/2014
05/15/2014: At final, lot grading needs to include building footprints and detailed contours with
spot elevations.
Comment Number: 5 Comment Originated: 05/15/2014
05/15/2014: At final, detailed design and construction details for the LID treatments need to be
included.
Department: Technical Services
Contact: Jeff County, 970-221-6588, jcountyCa)fcaov.com
Topic: Building Elevations
Comment Number: 1 Comment Originated: 05/13/2014
05/13/2014: Please clean up the text. It is hard to read.
Topic: Construction Drawings
Comment Number: 2 Comment Originated: 05/13/2014
05/13/2014: Please correct the spelling of "utility" in the title on sheet CV01.
Comment Number: 3 Comment Originated: 05/13/2014
05/13/2014: Sheets EX01 & PH01 are switched in the plan set from what is shown in the index
on sheet CV01.
Comment Number: 4 Comment Originated: 05/13/2014
05/13/2014: The sheet index shows 13 sheets of road plans, but there are only 11 in the set.
Comment Number: 5 Comment Originated: 05/13/2014
05/13/2014: If the NGVD 1929 Unadjusted elevations were used, please remove the NAVD
1988 elevations, and provide an equation to get from NGVD 1929 to NAVD 1988. NAVD88 =
• Show existing ub.._, crossings in profile at approximately STA
Sheet SS02
• Callout at profile STA 20+30.57 seems labeled incorrectly.
• Provide profile callout for segment upstream of SSMH-9
Sheet SS03
• Callout arrow at profile STA 32+47.98
• Readability at STA 40+00 in plan.
Sheet SS04
• Crossing at STA 18+91.87 in profile.
Sheet SS05
• Provide profile callout for segment downstream of SSMH5-4.
• Missing station in plan.
Comment Number: 5
05/13/2014: BSD - Signature Block insert:
BOXELDER SANITATION DISTRICT
+50, and STA 11+50.
Comment Originated: 05/13/2014
UTILITY PLAN REVIEW
Reviewed By:
General Manager Date
Review does not constitute "approval' of plans. Plan Engineer is responsible for accuracy and
completeness of plans.
Department: PFA
Contact: Jim Lynxwiler, 970-416.2869, llynxwiler .aoudre-fire.ora
Topic: General
Comment Number: 1
05/12/2014: WATER SUPPLY
Comment Originated: 05/12/2014
Overall the hydrant plan for the development is sufficient however, a few adjustments should be
made. As I will be out of town and unable to attend the PDP meeting on 5/14/14, 1 would like to
follow up this comment over the phone or by meeting with the project team in person. Please
contact me after 5/20/14 to discuss this further (970-416-2869).
Comment Number: 2
05/12/2014: FIRE LANES
Comment Originated: 05/12/2014
In order to meet minimum fire access requirements, no parking is to be allowed in the alleys.
Comment Number: 3 Comment Originated: 05/12/2014
05/12/2014: ADDRESSING
Please provide information showing how the alley loaded lots (not fronting a named street) are
intended to be addressed.
Comment Number: 4
05/13/2014: BSD General Comments:
Comment Originated: 05/13/2014
General Review Notes
1. Boxelder is spelled without a space.
2. Provide 0.2 FT drop across all manholes.
3. Shift sewer segments to be more in the center of the road and manholes away from gutters
as much as practical.
4. Add the Plan and Profile notes included.
5. Add the Plat notes and signature block included.
Utility Plan Review Notes
Sheet U4
• Add "INT2020" at EXMH-1.
• Call out 15-inch PVC for existing sanitary sewer to/from EXMH-1.
Sheet SS01
• Add "INT2020" at EXMH-1.
• Call out 15-inch PVC for existing sanitary sewer to/from EXMH-1.
• Confirm that EXMH-1 can accept a new core for the proposed 10-inch sewer. Angle may be
too acute between the proposed 10-inch sewer and the existing 15-inch sewer from the west to
allow for a core. Indicate flowline to be created from the 10-inch proposed sewer.
Comment Number: 3 Comment Originated: 05/13/2014
05/13/2014: Boxelder Sanitation - Easement use language:
Boxelder Sanitation District Easement Use Language
(for Platted Easements Where Sanitary Sewer Will be Installed - to be Included on all Plats)
1.
There shall be no erection or construction of any building or other structure, or any permanent
obstruction, or decrease or substantial increase in ground level, from the finished elevations on
this set of plans, in a manner that will interfere with use of the utility easement or impede access
over and across the easement for purposes of operation, maintenance or future installation,
repair or replacement of an existing or future sanitary sewer.
2.
Landscaping in the area of the easement where a sanitary sewer is installed shall not create
impediments to ingress and egress, nor shall landscaping material be installed or any trees or
shrubs whose height is greater than 2-feet be planted in the easement area that may impinge
on the overall operation and maintenance of the infrastructure placed in the easement. Driplines
of all trees shall not extend over the installed sanitary sewer line(s).
3.
No fence, which may impede access to and across the easement, shall be installed without
prior approval from Boxelder Sanitation District. Any such fence, installed with the Boxelder
Sanitation District's approval, must have gates to allow access to and across the easement of
Boxelder Sanitation District's maintenance vehicles, and must be paid for by the developer or
property owner.
4.
Boxelder Sanitation District, which owns infrastructure installed in the utility easement, has the
right from time to time to enlarge, improve, reconstruct, relocate and replace any underground
utility lines, improvements or other appurtenances constructed hereunder with any other
number or type of underground utilities and pipelines, or other structures either in the original
location or at any alternate location or locations within said utility easement.
5.
Boxelder Sanitation District shall have the right to mark the location of its infrastructure by
suitable markers set in or on the ground; provided that permanent markers shall be placed in
locations which will not interfere with any reasonable use of said utility easement.
6.
Boxelder Sanitation District shall have the right to install and maintain a gravel access road
within the utility easement for use by District personnel, equipment and vehicles.
"Standards and bpecifications for Sanitary Sewer Pipeline CotI.Lructlon and Improvements."
2.
All sewer services shall be minimum 4-inch diameter constructed at a slope of 2% from the
building to the sewer main, unless otherwise specified and approved by the District.
3.
All 6-inch diameter sewer services shall be constructed at a slope of 1 % from the building to
the sewer main.
4.
When groundwater is encountered clay cut off walls shall be installed on the upstream side of
all manholes, in the mid -section of each main line run at intervals not to exceed 300-feet, or as
required by the District. See detail sheets for clay cut-off wall detail.
5.
Field verify invert elevation of sanitary sewer and basement finished floor elevation for gravity
flow prior to constructing foundations.
6.
The Contractor shall schedule a pre -construction meeting with Boxelder Sanitation District a
minimum of one week before construction to coordinate schedules and clarify any additional
District requirements. Contact number is 970-498-0604.
7.
Contractor shall notify the District's inspector forty-eight hours prior to start of construction.
8.
Contractor shall be responsible for coordinating field locates of all existing utilities prior to any
construction.
9.
Service connections to structures require an elder valve (sewer shut-off valve) and a cleanout.
Elder valves must be installed upstream of the cleanout and a minimum 3-feet from any wall,
overhang or other structure that might limit access to the valve. Elder valves may be purchased
from vendors in Fort Collins, Colorado.
10.
All construction shall be inspected by District inspector prior to backfill.
For off -site sewer line manholes: Manhole rims shall be set flush with the surface when within an
all-weather access roadway, rims shall be set 6-inches above grade if they are not within an
all-weather access roadway.
Comment Number: 2 Comment Originated: 05/13/2014
05/13/2014: Bowelder Sanitation - Sanitary Sewer Notes for all plan and profile sheets:
Notes
1.
All sanitary sewer line construction shall conform to the latest Boxelder Sanitation District
Department: Light And Power
Contact: Justin Fields, 970-224-6150, ifields(dfcgov.com
Topic: General
Comment Number: 1 Comment Originated: 05/12/2014
05/12/2014: Electric development and system modification charges will apply. An online
estimator for these charges is available at
http://www.fcgov.com/utilities/business/builders-and-developers/plant-investment-development-
fees/electric-development-fee-estimator.
Comment Number: 2 Comment Originated: 05/12/2014
05/12/2014: Light and Power Engineering will design the street lighting system. Street trees
will need to be adjusted based on the location of the streetlights. Forty feet of clearance to the
streetlight will need to be maintained by shade trees and fifteen feet by ornamental trees.
Comment Number: 3 Comment Originated: 05/12/2014
05/12/2014: The location of the water and electric services will need to be coordinated with
Light and Power Engineering, 970-221-7600.
Comment Number: 4 Comment Originated: 05/12/2014
05/12/2014: Meter locations for the single family attached units will need to be coordinated with
Light and Power Engineering.
Department: Outside Agencies
Contact: Alden Hill, ,
Topic: General
Comment Number: 1
05/13/2014: Lake Canal
Board of Directors).
Contact: Eric Garner, ,
Topic: General
Comment Originated: 05/13/2014
Replace representative Roy Roth with Al -den V. Hill (Secretary of the
04/30/2014:
Building Permit Pre -Submittal Meeting
Pre -Submittal meetings are offered to assist the designer/builder by assuring, early on in the
design, that the new commercial or multi -family projects are on track to complying with all of the
adopted City codes and Standards listed below. The proposed project should be in the early
to mid -design stage for this meeting to be effective and is typically scheduled after the Current
Planning conceptual review meeting. Applicants of new commercial or multi -family projects are
advised to call 416-2341 to schedule a pre -submittal meeting. Applicants should be prepared
to present site plans, floor plans, and elevations and be able to discuss code issues of
occupancy, square footage and type of construction being proposed.
Construction shall comply with the following adopted codes as amended:
2012 International Building Code (IBC)
2012 International Residential Code (IRC)
2012 International Energy Conservation Code (IECC)
2012 International Mechanical Code (IMC)
2012 International Fuel Gas Code (IFGC)
2009 International Plumbing Code (IPC) as amended by the State of Colorado
2011 National Electrical Code (NEC) as amended by the State of Colorado
Accessibility: State Law CRS 9-5 & ]CC/ANSI Al17.1-2009.
Snow Load Live Load: 30 PSF / Ground Snow Load 30 PSF.
Frost Depth: 30 inches.
Wind Load: 100- MPH 3 Second Gust Exposure B.
Seismic Design: Category B.
Climate Zone: Zone 5
Energy Code Use
1. Single Family; Duplex; Townhomes: 2009 IRC Chapter 11 or 2009 IECC Chap 4.
2. Multi -family and Condominiums 3 stories max: 2009 IECC Chapter 4.
3. Commercial and Multi -family 4 stories and taller: 2009 IECC Chapter 5.
Fort Collins Green Code Amendments effective starting 1-1-2012. A copy of these
requirements can be obtained at the Building Office or contact the above phone number.
Project specific concerns:
1. A new code amendment effective in Aug 1-2014 will require a sprinkler system in all
property -line townhomes and duplexes.
2. New Green Code requires:
a. Upgraded insulation is required for buildings using electric heat or cooling.
b. Low -flow Watersense plumbing fixtures (toilet, faucets, shower heads) are required.
c. Special combustion safety requirements for natural draft gas appliances.
d. Low VOC interior finishes.
3. Any project with more than 6 townhomes must provide accessible units per CRS 9-5.
City of Fort Collins
Building Services
Plan Review
416-2341
Comment Number: 1 Comment Originated: 04/30/2014
Department: Internal Services
Contact: Russell Hovland, 970-416-2341, rhovlandcDfcgov.com
Topic: Building Insp Plan Review
Provide street trey_ ,n generally smaller groupings where group. of the same species are
large. There are a few groupings that have over 10 or more of the same species. Review and
apply the following standard in the City of Fort Collins Streetscape Standards.
4.1.1 (Page 8) Species groupings within tree rows:
To the extent reasonably feasible, street tree rows in landscape areas, whether inside or
outside of the sidewalk, shall be in groupings of three, five, or more of a single species. The
intent is to provide a degree of species diversity within a deliberate, repeating design pattern.
Designers are encouraged to arrange changes in species to reflect roadway conditions, such
as open stretches of roadway between access points, stretches approaching intersections and
driveways and for changes in adjoining lands use.
Comment Number: 7
05/14/2014:
Comment Originated: 05/14/2014
Please provide a separate category of notes with the heading Street Tree Notes that include
landscape notes 9,10 and 15 as well as the following two notes.
All street tree planting shall be the responsibility of the developer for planting. Actual planting of
street trees shall be done by a qualified landscape contractor.
Street tree locations and numbers may be adjusted to accommodate driveway locations, and
separation standards for actual water and sewer service lines, street signs and street lights.
Street trees to be centered in the middle of the lot to the extent feasible. Quantities shown on
plans must be installed unless a reduction occurs to meet separation standards.
Comment Number: 8 Comment Originated: 05/14/2014
05/14/2014:
Add this note in larger print within bolded box around it to each of the landscape sheets. This is
in addition to the similar note that is included in the street tree notes.
A permit must be obtained from the City Forester before any trees noted on these plans are
planted in parkways between the sidewalk and curb. Street tree locations and numbers may
change to meet actual utility tree separation standards. Landscape contractor must obtain
approval of street tree locations after utility locates. Street tree must be inspected and
approved before planting. Failure to obtain this permit is violation of the code of the City of Fort
Collins.
Comment Number: 9
Comment Originated: 05/14/2014
05/14/2014:
Please edit landscape note number 20 to say City of Fort Collins in place of the other
jurisdiction mentioned.
Comment Number: 10
05/14/2014:
Forestry comments pertain only to trees.
Comment Number: 11
05/21 /2014:
Comment Originated: 05/14/2014
Comment Originated: 05/21/2014
Please change the Sensation Boxelder used as street trees to Greenspire Linden. The
Boxelder is not on the street tree list and is used only for special situations.
Chanticleer Pear, wnich can be planted 15 feet from the light.
Comment Number: 3 Comment Originated: 05/14/2014
05/14/2014:
Private Property tree Selection:
Consider using a more upright ornamental tree near the buildings such as Red Barron
Crabapple or Chanticleer Pear for a possibly a better fit.
Comment Number: 4
05/14/2014:
Comment Originated: 05/14/2014
Show on the plans the locations of all streetlights, water and sewer service lines to each lot, the
anticipated driveway locations as well as the position of stop signs. Provide street tree
placements that meet the following separation standards.
Street Lights: 40 feet for Shade trees and 15 feet for ornamental trees
Water and Sewer Service lines: 6 feet tree utility line separation
Driveways: 8 feet separation between driveway and street tree
Stop Signs: 20 feet between tree and sign
Comment Number: 5
Comment Originated: 05/14/2014
05/14/2014:
Please provide a detail of a corner lot and mid -bock lot with the street trees located to meet the
separation standards for water and sewer service lines (6 feet), streetlights (40' shade tree 15'
ornamental tree), stop sign (20'), and driveway (8'). Scale dimensions on these details.
Comment Number: 6
05/14/2014:
Comment Originated: 05/14/2014
Comment Number: 2 Comment Originated: 05/14/2014
05/14/2014:
Street Tree Species Selection:
List American linden as American Sentry Linden - Tilia americana 'Sentry'
List Coffeetree as Expresso Kentucky Coffeetree - Gymnocladus dioica'Expresso'
Use around 15 fewer Chinkapin Oak and around 15 fewer Texas Red Oak. Change these
approximately 30 street trees to Shademaster honeylocust. Market availability of these oaks
has been low.
Change the eight Spring Snow Crabs in the median in Mexico Way to Thunderchild
Crabapples.
Consider for any lot that does not have a street tree in front due to a street light location using
spurge on the site.
Comment Number: 4 Comment Originated: 05/14/2014
05/14/2014: Would the groundwater levels support cottonwood plantings within the buffer
zone? It would be good to mix these in with the boxelder and hackberry canopy cover.
Comment Number: 5 Comment Originated: 05/14/2014
05/14/2014: A raptor survey will be required prior to a DCP being issued to ensure no raptors
are nesting, should the project gain final approval.
Comment Number: 6 Comment Originated: 05/14/2014
05/14/2014: Please label the south detention ponds as buffer zones as they are buffering the
wetlands to the south.
Comment Number: 7 Comment Originated: 05/14/2014
05/14/2014: Please include a note on the tree mitigation plan or landscape plan, as
appropriate, that requires a tree removal to occur outside of the migratory songbird nesting
season (February 1-July 31), or that a survey be conducted prior to removal to ensure no
active nests in the area.
Comment Number: 8
Comment Originated: 05/14/2014
05/14/2014: Let's discuss the buffer zone area a bit more and identify if less areas can be
disturbed from a grading perspective. Even though the cover is smooth brome right now, which
is non-native, it is an established grass cover and disturbing it to plant natives could only
enhance weed establishment on the site. This can be resolved at final plan.
Comment Number: 9
Comment Originated: 05/14/2014
05/14/2014: When the tree mitigation issue is resolved with the Russian olives and the south
detention ponds are labeled as buffer zones, I will be ready for a hearing.
Comment Number: 10 Comment Originated: 05/15/2014
05/15/2014: Please include the road within the ECS - will the south wetlands or their buffers be
impacted?
Topic: Plat
Comment Number: 11 Comment Originated: 05/15/2014
05/15/2014: Sheet 3 of the Plate - buffer lines aren't shown and top of bank isn't shown as well.
Department: Forestry
Contact: Tim Buchanan, 970.221-6361, tbuchanan(a.fcaov.com
Topic: Landscape Plans
Comment Number: 1
05/14/2014:
Comment Originated: 05/14/2014
Please set an on -site meeting with the City Forester and Environmental Planner at the project
buffer area along the Lake Canal to refine the tree inventory, discuss new tree selection and the
management objectives for this area.
Comment Number. 1 Uomment Originated: 05/14/2014
05/14/2014: In the submittal packet there was a letter referring to an easement dedication but I
did not see a legal and exhibit that accompanied the deed of dedication.
Comment Number: 10 Comment Originated: 05/14/2014
05/14/2014: See redlines for additional comments on street profiles. These will be available
on Friday.
Comment Number: 11
Comment Originated: 05/16/2014
05/16/2014: The right of way dedicated for Mexico Way needs to be 72' to accomodate a
Commercial Local and not a Connector Local as proposed. The existing zoning adjacent to
Mexico Way as well as the need for bike lanes to serve the residential project were some of
the reasons for making this determination.
Comment Number: 12
Comment Originated: 05/16/2014
05/16/2014: Mexico Way will need to have at least one sidewalk provided from the Timbervine
Development to International. This sidewalk should exist on the east side of Mexico Way to tie
into the existing attached sidewalk on International.
Comment Number: 13
Comment Originated: 05/16/2014
05/16/2014: The Median proposed on Mexico Way near the south end of the timbervine
development constricts the travel lanes to 15' total from flow line to flow line. This needs to be
widended to allow at least 18' of width for engineering standards and potentially 20' flow to flow
line for PFA requirements.
Comment Number: 14 Comment Originated: 05/16/2014
05/16/2014: Sight distance is an ongoing concern on the intersection of Mexico Way and
International. The applicant needs to provide some data showing the sight distance and
proposed easements if they are required.
Comment Number: 15
Comment Originated: 05/16/2014
05/16/2014: Additional information needs to be provided regarding the drainage from private
alley/driveways within the development that drain onto public right of way. It is understood that
the inverted crown of these alleys and driveways will be lined with porous pavers but there is
no information to support if all drainage can be captured by these pavers or if an inlet should
be proposed at the interface of the alley and the right of way to catch any excess drainage.
Department: Environmental Planning
Contact: Lindsay Ex, 970-224-6143, lex a(-fcgov.com
Topic: General
Comment Number: 1
Comment Originated: 05/14/2014
05/14/2014: Please show an easement for the Lake Canal on the plans, so we can ensure any
landscape plans are in alignment with the ditch companies requirements.
Comment Number: 2
Comment Originated: 05/14/2014
05/14/2014: The tree mitigation table is missing some of the Russian Olives found on the site;
as covered in the ECS. Please update accordingly.
Comment Number: 3
Comment Originated: 05/14/2014
05114/2014: A weed management plan will need to be developed with the first season of
construction, should the project be approved, to ensure removal of the Canada thistle and leafy
Mexico Way - aou sidewalk ramps to street on both sides and ,Ajust parkway landscaping.
Comment Number: 4 Comment Originated: 05/13/2014
05/13/2014: A1.01 - SF Attached Elevations. Dimensions are hard to read - enlarge and make
clear.
Comment Number: 5 Comment Originated: 05/13/2014
05/13/2014: Landscape Notes (LP103). Add note -Street parkway landscaping in accordance
with Fort Collins Streetscape Standards.
Comment Number: 6 Comment Originated: 05/13/2014
05/13/2014: LP402. Add note to sidewalk stub -out near park, "connect sidewalk to future trail
system'
Comment Number: 7 Comment Originated: 05/16/2014
05/16/2014: In response to the magnitude of staff comments from Round 1, 1 conclude we
need another round to process needed revisions to the PDP. Please coordinate with the
Development Review Center for next submittal.
Department: Engineering Development Review
Contact: Andrew Gingerich, 970-221-6603, agingerichanfcgov.com
Topic: Construction Drawings
Comment Number: 2 Comment Originated: 05/14/2014
05/14/2014: Label alley on the cover sheet as "private"
Comment Number: 3 Comment Originated: 05/14/2014
05/14/2014: On the final plans please call out the utilties that will be built in each phase. See
redlines for longer explanation.
Comment Number: 4 Comment Originated: 05/14/2014
05/14/2014: Estimate and label length and area of materials to be sawcut or removed.
Comment Number: 5 Comment Originated: 05/14/2014
05/14/2014: relook at some of the contours on the grading plan and ensure that proposed
contours are labeled in the vicinity of existing contours near project boundaries so that I can
verify grading ties and does not occur off site.
Comment Number: 6 Comment Originated: 05/14/2014
05/14/2014: Is the 30' easement shown on G4 existing or proposed? If proposed than we will
need a letter of intent of adjacent property owner prior to public hearing.
Comment Number: 7
Comment Originated: 05/14/2014
05/14/2014: Please relook at the placement of Handicap ramps on the plan as there are
locations were ramps are missing and other areas where they can be removed.
Comment Number: 8
Comment Originated: 05/14/2014
05/14/2014: Our minimum cover over storm pipes is 3' from top of pipe to top of asphalt.
Sheet SD01 shows SDMHA5-3 and on SD04 as less than 3of cover.
Comment Number: 9
Comment Originated: 05/14/2014
05/14/2014: There area few intersections that do not intersect at 90 degrees. Please show the
angle of intersection so that it can be verified they are within standard.
Topic: General
Fort Collins
Community Development and
Neighborhood Services
281 North College Avenue
PO Box 580
Fort Collins, CO 80522
970.221.6750
970.224.6134 - fax
fcgov. com/developmentre view
May 27, 2014
Craig Russell
Russell + Mills Studio
141 S. College Ave, Ste 104
Fort Collins, CO 80524
RE: Timbervine, PDP140002, Round Number 1
Please see the following summary of comments from City staff and outside reviewing agencies for your
submittal of the above referenced project. If you have questions about any comments, you may contact the
individual commenter or direct your questions through the Project Planner, Pete Wray, at 970-221-6754 or
pwray@fcgov.com.
Comment Summary:
Department: Current Planning
Contact: Pete Wray, 970-221-6754, pwrayuDfcgov.com
Topic: General
Comment Number: 1
05/13/2014: GIS:
Comment Originated: 05/13/2014
1. Addresses will be assigned by the GIS Department after the plans have met final approval
through Development Review and are recorded with the City.
2. The following street names are approved: Lager, Stout, Bock, Saison.
3. The following street names are denied: Tripel, Maibock, Hefeweizen. Replacement names
can be resubmitted through the development review process. See http://Iadmer.org/streets/
for street names already in use and street naming rules.
4. The existing Mackinac St extends into this subdivision and must keep the same name as it
continues on the same path. This was marked as Maibock, so only Tripel and Hefeweizen will
need new names.
Comment Number: 2
Comment Originated: 05/13/2014
05/13/2014: Phasing Plan - LS101: On plan view make phasing delineation more pronounced
(bold/larger dashed lines). In legend and plan, make phase 1 hatching symbol more
pronounced and darker.
Comment Number: 3 Comment Originated: 05/13/2014
05/13/2014: Site/Landscape Plans (LS 402, LP 104/402). Perimeter sidewalk that connects to