Loading...
HomeMy WebLinkAboutBOARDWALK CROSSING @ MASON STREET - PDP/FDP - FDP130003 - CORRESPONDENCE - (6)Topic: General Comment Number: 1 07/16/2013: No comments. Department: Zoning Contact: Noah Beals, 970-416-2313, nbeals(a)fc4ov.com Topic: General Comment Originated: 07/16/2013 Comment Number: 3 Comment Originated: 07/16/2013 07/16/2013: Please add notes to the site plan under General Notes that reference the approved Modifications. Comment Number: 22 07/11/2013: No comments. 05/01/2013: No comments. 03/21/2013: No comments. Topic: Lighting Plan Comment Number: 32 07/11/2013: No comments. Topic: Plat Comment Originated: 03/21/2013 Comment Originated: 07/11/2013 Comment Number: 1 Comment Originated: 03/21/2013 03/21/2013: The boundary and legal description close. Comment Number: 16 Comment Originated: 03/21/2013 07/11/2013: Repeat Comment: Please remove notes 5 -7 from the Plat. 05/01/2013: These are now Notes 5-7, and have not been addressed. Please remove. 03/21/2013: Notes 7-9 appear to be ALTA or Land Survey Plat notes. Please remove. Comment Number: 31 Comment Originated: 07/11/2013 07/11/2013: Please change the Plat name in the Statement Of Ownership And Subdivision back to match the title. See redlines. Topic: Site Plan Comment Number: 19 Comment Originated: 03/21/2013 07/11/2013: There are still line over text issues, and a cut off text issue. See redlines. 05/01/2013: There are still line over text issues. 03/21/2013: There are line over text issues on sheet 1. Department: Traffic Operation Contact: Ward Stanford, 970-221-6820, wstanford fcgov.com Topic: Construction Drawings Comment Number: 1 Comment Originated: 03/18/2013 03/18/2013: The S&S Notes (and any other on other sheets if applicable) need to be revised to state the "City Traffic Engineer" at each instance where the notes state "Local Entity" engineer. The Signing and Striping installation is overseen by the City TE (or designate) versus the City Engineer (or designate). Comment Number: 2 Comment Originated: 03/18/2013 03/18/2013: Please verify the City's corner sight distance criteria is met at the Mason intersections. Topic: Traffic Impact Study Comment Number: 3 Comment Originated: 03/21/2013 TIS accepted. Department: Water -Wastewater Engineering Contact: Roger Buffington, 970-221-68540 rbuffinciton(&fc4ov.com Please replace planting note #11 with the following: A permit must be obtained from the City forester before any trees or shrubs as noted on this plan are planted, pruned or removed on the public right-of-way. This includes zones between the sidewalk and curb, medians and other city property. This permit shall approve the location and species to be planted. Failure to obtain this permit may result in replacing or relocating trees and a hold on certificate of occupancy. Please add the following statement as an additional Planting Note: The developer shall contact the City Forester to inspect all street tree plantings at the completion of each phase of the development. All trees need to have been installed as shown on the landscape plan. Approval of street tree planting is required before final approval of each phase. Failure to obtain approval by the City Forester for street trees in a phase shall result in a hold on certificate of occupancy for future phases of the development. Department: Light And Power Contact: Doug Martine, 970-224-6152, dmartinecDfcaov.com Topic: General Comment Number: 2 Comment Originated: 03/06/2013 03/06/2013: After the plans are final, an Autocad drawing (version 2008) of the site plan will need to be sent to Terry Cox at TCOX@FCGOV.COM. Department: PFA Contact: Jim Lynxwiler, 970.416-2869, jlynxwiler .aoudre-fire.org Topic: General Comment Number: 01 Comment Originated: 03/20/2013 03/20/2013: FIRE LANES Fire Lanes shall be designated on the plat as "Emergency Access Easement', not "access easement" or "vehicular access easement Department: Stormwater Engineering Contact: Jesse Schlam, 970-218-2932, iischlam()fcgov.com Topic: Erosion Control Comment Number: 4 Comment Originated: 07/17/2013 07/17/2013: Erosion Control Report was not included. Sequence Planning needed some work please use the sequence of construction vs the BMPs to clarify the needed BMPs. Dumpster Facility is too Close to the Inlets high likelihood of waste material going to the stormsewer. Department: Technical Services Contact: Jeff County, 970-221.6588, icounty(c fcaov.com Topic: Building Elevations City of . Fort Collins Community Development and Neighborhood Services 281 North College Avenue PO Box 580 Fort Collins, CO 80522 970.221.6750 970.224.6134 - fax fcgov. com/developmentreview July 17, 2013 Steve Steinbicker Architecture West, LLC 4710 S. College Ave. Fort Collins, CO 80525 RE: Boardwalk Crossing at Mason Street, FDP130003, Round Number 4 Please see the following summary of comments from City staff and outside reviewing agencies for your submittal of the above referenced project. If you have questions about any comments, you may contact the individual commenter or direct your questions through the Project Planner, Pete Wray, at 970-221-6754 or pwray@fcgov.com. Comment Summary: Department: Engineering Development Review Contact: Sheri Langenberger, 970-221.6573, slangenberger(a).fcgov.com Topic: General Comment Number: 11 Comment Originated: 03/28/2013 03128/2013: The project owes an additional $146.04 for TDRF. The fee submittal did not account for the total area being replated. Contact: Tyler Siegmund, 970-221-6501, tsiegmund(a)-fcgov.com Topic: General Comment Number: 12 Comment Originated: 05/01/2013 05/01/2013: Please add a note to the overall utility plan (sheet C3) the specifies the handicap ramp openings match the width of the sidewalk, or 6ft wide handicap ramp openings to match the width of the sidewalk. Department: Forestry Contact: Tim Buchanan, 970-221-6361, tbuchanan(&fcgov.com Topic: Landscape Plans Comment Number: 5 Comment Originated: 05/02/2013 05/02/2013: