Loading...
HomeMy WebLinkAbout2590 MIDPOINT DRIVE - PDP - PDP160010 - CORRESPONDENCE - REVISIONS (3)RESPONSE: The fence is solid wood and is surrounding the Liberty Commons outdoor track and field. Comment Number: 4 Comment Originated: 04/12/2016 04/12/2016: Why are there not trees in all the landscape islands in the parking lot? RESPONSE: See above response for the 6% interior parking lot landscape. We do have some utility services prohibiting trees from being placed in the landscape Islands, however, we have deleted most of them due to potential conflicts with trees and trucks. Page 11 of 10 Comment Number: 2 Comment Originated: 04/12/2016 04/12/2016: A 6" sanitary service connection into an 8" main requires either connecting at a manhole or cutting in atee. RESPONSE: 6" SS Line has been changed to a 4" SS line with an 8"x4" tee connection into the main line. Comment Number: 3 Comment Originated: 04/12/2016 04/12/2016: Is the proposed fire hydrant required? If not required, it would be preferable to remove it from the design. If required, the main and hydrant will need to be located within an easement. RESPONSE: Fire Hydrant has been removed from the plans per City request Comment Number: 4 Comment Originated: 04/12/2016 04/12/2016: Please add valves on fire line and hydrant per redlines. RESPONSE: Fire Hydrant has been removed from the plans per City request Comment Number: 5 Comment Originated: 04/12/2016 04/12/2016: Please utilize City details for hydrant, bedding, etc. Please note that all City construction detail drawings are to be used in their original, unaltered state. ANY modification(s) must be clearly distinguished and all City logos/identifiers must be removed from the modified detail. Detail drawings can be found in both .pdf and .dwg formats through the links to "Construction Drawings" on www.fcgov.com/utility-development. RESPONSE: City of Fort Collins construction drawings have replaced previous standard details. Comment Number: 6 Comment Originated: 04/12/2016 04/12/2016: Please see redlines and return with resubmittal. RESPONSE: Redlines have been addressed and will be returned with this resubmittal. Comment Number: 7 Comment Originated: 04/12/2016 04/12/2016: Please note that additional comments may be forthcoming upon future submittals as additional details arediscovered. RESPONSE: Noted. Department: Zoning Contact: Noah Beals, 970-416-2313, nbeals fcgov.com Topic: General Comment Number: 1 Comment Originated: 04/12/2016 04/12/2016: The trash/recycling enclosure needs a separate walk-in access from the main service gate. RESPONSE: The trash/recycling enclosure has been updated with walk-in access. See updated building elevations sheet Comment Number: 2 Comment Originated: 04/12/2016 04/12/2016: Please label the length dimension of the stalls along the west side. RESPONSE: The dimension is labeled. Comment Number: 3 Comment Originated: 04/12/2016 04/12/2016: Please identify the fence material of the existing fence? Will it provide screening? Is it more than chain link? Page 10 of 10 RESPONSE: Title Block has been revised. Topic: Lighting Plan Comment Number: 8 Comment Originated: 04/13/2016 04/13/2016: Please change "Fort Collins" to "Prospect Industrial Park" in the title block. See redlines. RESPONSE: Title block has been updated Topic: Site Plan Comment Number: 1 Comment Originated: 04/13/2016 04/13/2016: There are line over text issues. See redlines. RESPONSE Comment Number: 2 Comment Originated: 04/13/2016 04/13/2016: Please provide information documenting a 9' Utility Easement along Midpoint Drive. The Plat shows a 6' Utility Easement. RESPONSE Comment Number: 3 Comment Originated: 04/13/2016 04/13/2016: Please add Lot 18, Prospect Industrial Park" to the title block. RESPONSE: Title Block has been revised. Department: Traffic Operation Contact: Martina Wilkinson, 970-221-6887, mwiikinson(&fcaov.com Topic: General Comment Number: 1 Comment Originated: 04/12/2016 04/12/2016: no comments from traffic or transportation planning. RESPONSE: Thank you. Department: Water Conservation Contact: Eric Olson, 970-221-6704, eolson fcaov.com Topic: General Comment Number: 1 Comment Originated: 04/11/2016 04/11/2016: Irrigation plans are required no later than at the time of building permit. The irrigation plans must comply with the provisions outlined in Section 3.2.1(J) of the Land Use Code. Direct questions concerning irrigation requirements to Eric Olson, at 221-6704 oreolson@fcgov.com RESPONSE: Acknowledged. Department: Water -Wastewater Engineering Contact: Dan Mogen, 970-224-6192, dmoaen fcaov.com Topic: General Comment Number: 1 Comment Originated: 04/12/2016 04/12/2016: Please show curb stop on 1" waterservice. RESPONSE: Curb stop has been drawn in on Civil Plan C-3.0. Page 9 of 10 ELEVATION: PLEASE NOTE: THIS PLAN SET IS USING NAVD88 FOR A VERTICAL DATUM. SURROUNDING DEVELOPMENTS HAVE USED NGVD29 UNADJUSTED FOR THEIR VERTICAL DATUMS. IF NGVD29 UNADJUSTED DATUM IS REQUIRED FOR ANY PURPOSE, THE FOLLOWING EQUATION SHOULD BE USED: NGVD29 UNADJUSTED = NAVD88 RESPONSE: The Benchmark Statement has been updated and conversion has been shown for NGVD Unadjusted. Comment Number: 10 Comment Originated: 04/13/2016 04/13/2016: Some of the sheet titles in the sheet index do not match the sheet titles on the noted sheets. See redlines. RESPONSE: All sheet titles have been updated to match the Cover Sheet Comment Number: 11 Comment Originated: 04/13/2016 04/13/2016: All benchmark statements must match on all sheets. RESPONSE: Benchmark statements have been updated accordingly. Comment Number: 12 Comment Originated: 04/13/2016 04/13/2016: There are line over text issues. See redlines. RESPONSE: Line over text issues have been corrected on all sheets Comment Number: 13 Comment Originated: 04/13/2016 04/13/2016: There is text that needs to be rotated 180 degrees. See redlines. RESPONSE: Text issues have been corrected on all sheets. Comment Number: 14 Comment Originated: 04/13/2016 04/13/2016: There are cut off text issues. See redlines. RESPONSE: Text issues have been addressed. Comment Number: 15 Comment Originated: 04/13/2016 04/13/2016: There are duplicated text issues. See redlines. RESPONSE: Text issues have been addressed Comment Number: 16 Comment Originated: 04/13/2016 04/13/2016: There is text that needs to be masked. Mask all text in hatched areas. See redlines. RESPONSE: Text has been masked in all hatched areas. Topic: Landscape Plans Comment Number: 4 Comment Originated: 04/13/2016 04/13/2016: Please change the "Lightfield Enterprises Lot 2" to "Lot 1, LEI Subdivision" or remove completely. See redlines. RESPONSE: The note has been removed. Comment Number: 5 Comment Originated: 04/13/2016 04/13/2016: Please add Lot 18, Prospect Industrial Park' to the title block. Page 8 of 10 ANY modification(s) must be clearly distinguished and all City logos/identifiers must be removed from the modified detail. Detail drawings can be found in both .pdf and .dwg formats through the links to "Construction Drawings" on www.fcgov.com/utility-development. RESPONSE: Noted and addressed as required. Comment Number: 13 Comment Originated: 04/12/2016 04/12/2016: Please see redlined plans and drainage report. Please return with resubmittal. RESPONSE: Noted Comment Number: 14 Comment Originated: 04/12/2016 04/12/2016: Please note that additional comments may be forthcoming upon future submittals as additional details arediscovered. RESPONSE: Noted. Contact: Jesse Schlam, 970-218-2932, ischlam fcaov.com Topic: Erosion Control Comment Number: 1 Comment Originated: 03/29/2016 03/29/2016: Current Erosion Control Materials Submitted do not meet requirements. Please submit; Erosion Control Plan (based upon redlines), Erosion Control Report (Based upon comments returned to the planner on 3/29/2016) , and an Escrow / Security Calculation (with the correct method for calculating an escrow see redline comments in the report). If you need clarification concerning the erosion control section, or if there are any questions please contact Jesse Schlam 970-218-2932 or email @jschlam@fcgov.com RESPONSE: Erosion Control Redlines have been addressed. Department: Technical Services Contact: Jeff County, 970-221-6588, "county fcaov.com Topic: Building Elevations Comment Number: 6 Comment Originated: 04/13/2016 04/13/2016: There are text over text issues. See redlines. RESPONSE: Has been updated and corrected Comment Number: 7 Comment Originated: 04/13/2016 04/13/2016: Please change "Fort Collins" to 'Prospect Industrial Park" in the title block. See redlines. RESPONSE: Title block has been updated Topic: Construction Drawings Comment Number: 9 Comment Originated: 04/13/2016 04/13/2016: Please provide the following information for the Benchmark Statement in the E ACT format shown below. PROJECT DATUM: NAVD88 BENCHMARK # w/ DESCRIPTION ELEVATION: BENCHMARK # w/ DESCRIPTION Page 7 of 10 RESPONSE: Existing Volume, Required Volumes, and Proposed Volumes are included within the Drainage Map. Comment Number: 4 Comment Originated: 04/12/2016 04/12/2016: Please review Fort Collins Criteria for C-factor and recalculate. RESPONSE: C-factor has been revised per COFC requirements. Comment Number: 5 Comment Originated: 04/12/2016 04/12/2016: Please review the time of concentration and associated rainfall intensities using in the runoff calculations. RESPONSE: These items have been reviewed and revised appropriately based on the COFC requirements. Comment Number: 6 Comment Originated: 04/12/2016 04/12/2016: What is sub -basin P1? It is seen in the calculations, but other references remain unseen. RESPONSE: This was the existing basin, this information has been modified per the newly revised report. Comment Number: 7 Comment Originated: 04/12/2016 04/12/2016: If the effective imperviousness is to be used for WQCV calculations, please use Level 1 as it doesn't appear that Level 2 is being met. RESPONSE: Level 1 has been used and discussed within the updated report. Comment Number: 8 Comment Originated: 04/12/2016 04/12/2016: Please revise methods used to calculate detention volumes as the Urban Drainage spreadsheet used does not use Fort Collins Criteria. RESPONSE These methods have been revised and coordinated with City staff. Comment Number: 9 Comment Originated: 04/12/2016 04/12/2016: How was the designed outfall rate of 0.14 cfs/acre determined? Please show calculation for 2-year historic runoff rate. RESPONSE: The Release Rates have been redesigned based on the allowed rate per acre. Please see the revised report and calculations. Comment Number: 10 Comment Originated: 04/12/2016 04/12/2016: Please expand the drainage report narrative overall to give a better understanding of the proposed development. A number of things are currently unclear with the project including how the LID requirements are being met and what is ultimately being proposed for the 2 detention basins. Are both water quality and LID being proposed for the detention basin bottoms? Please expand to help clarify the overall design. RESPONSE: Report has been revised to include discussions on the LID requirements and the proposed Rain Gardens. Comment Number: 11 Comment Originated: 04/12/2016 04/12/2016: Please discuss and document how LID requirements are being met. A table would be helpful for this and a sample table can be downloaded at: http://tinyurl.com/Samp]eLIDTable. RESPONSE: A LID Table has been added to the Drainage Plan and within the Appendix of the Drainage Report. Comment Number: 12 Comment Originated: 04/12/2016 04/12/2016: Please use City details in their original state if they are not being altered. Page 6 of 10 Comment Number: 1 Comment Originated: 03/31/2016 03/31/2016: FIRE LANE Emergency Access Easement details will be provided by time of FDP. The fine lane will need to extend onto the property, along the north side of the building, to 150' in length and no turnaround will be required. The building will be approximately 60' out of access as defined by IFC 503.1.1, however as the building will be provided with an automatic fire sprinkler system, the out of access condition is allowable. Code language provided below. RESPONSE: Acknowledged > IFC 503.1.1: Approved fire Lanes shall be provided for every facility, building or portion of a building hereafter constructed or moved into or within the jurisdiction. The fire apparatus access road shall comply with the requirements of this section and shall extend to within 150 feet of all portions of the facility and all portions of the exterior walls of the first story of the building as measured by an approved route around the exterior of the building or facility. When any portion of the facility or any portion of an exterior wall of the first story of the building is located more than 150 feet from fire apparatus access, the fire code official is authorized to increase the dimension if the building is equipped throughout with an approved, automatic fire -sprinkler system. Comment Number: 2 Comment Originated: 03/31/2016 03/31/2016: FIRE LANE SIGNAGE & RED CURB Limits of the fire lane need to be identified with signage or red curbing throughout. Please label sign locations on subsequent plans. Code language below. RESPONSE: Fire Lane signs have been added to the pains. > IFC D103.6: Where required by the fire code official, fire apparatus access roads shall be marked with permanent NO PARKING - FIRE LANE signs complying with Figure D103.6. Signs shall have a minimum dimension of 12 inches wide by 18 inches high and have red letters on a white reflective background. Signs shall be posted on one or both sides of the fire apparatus road as required by Section D103.6.1 or D103.6.2. Comment Number: 3 04/12/2016: WATER SUPPLY The proposed hydrant on the property is notrequired. RESPONSE: Hydrant will be removed Department: Stormwater Engineering Contact: Dan Mogen, 970-224-6192, dmoaen fcaov.com Topic: General Comment Originated: 04/12/2016 Comment Number: 2 Comment Originated: 04/12/2016 04/12/2016: Please provide a drainage basin map with the report/plans. RESPONSE: Drainage Basin Map has been included in the Drainage Report Comment Number: 3 Comment Originated: 04/12/2016 04/12/2016: It is noted that Basin 1 will be sharing a detention basin with the adjacent property. It doesn't appear that easement will be required as the properties are owned by the same party. Please document the required volume for the adjacent property or include in the basin sizing calculations. Page 5 of 10 Comment Number: 3 Comment Originated: 04/13/2016 04/13/2016: If there are any existing trees on site contact the City Forester for an onsite meeting to get tree inventory and protection information. For existing trees to retain add the City of Fort Collins Planning Department tree protection notes. RESPONSE: There are no trees on -site. Department: Historical Preservation Contact: Maren Bzdek, 970-221-6206, mbzdek fcaov.com Topic: General Comment Number: 1 Comment Originated: 04/01/2016 04/01/2016: The property does not contain buildings 50 years old or older, and the proposed plans are unlikely to affect adjacent historic properties, if any. RESPONSE: Acknowledged Department: Light And Power Contact: Rob Irish, 970-224-6167, rirish fcaov.com Topic: General Comment Number: 1 Comment Originated: 04/11/2016 04/11/2016: Electric power for this site is shown coming from an existing 120/208v 3-phase transformer NW of the site. This transformer does not look to be in a utility easement. Verify that the transformer is in a utility easement. If a utility easement does not exist, one will need to be dedicated for the service to come from this transformer. RESPONSE: An easement for electrical service has been added Comment Number: 2 Comment Originated: 04/11/2016 04/11/2016: Any relocation or modification to existing electric facilities will be at the expense of the owner/developer. If Light & Power's existing electric facilities are to remain within the limits of the project they must be located within a utility easement. RESPONSE Acknowledged. Comment Number: 3 Comment Originated: 04/11/2016 04/11/2016: A C-1 Form and a One -line diagram will need to be submitted to Light & Power Engineering for review. Please click on the following link for the C-1 Form. http://www.fcgov. com/util ities/business/bu ilders-and-developers/development-forms -guidelines-regulations RESPONSE: Acknowledged. Comment Number: 4 Comment Originated: 04/11/2016 04/11/2016: Electric Capacity Fee and Building Site charges will apply to this development. Please click on the following link for Estimated Light & Power charges and the Light & Power Fee calculator. http://www.fcgov.com/utilities/business/builders-and-developers/plant-investment-de velopment-fees RESPONSE: Acknowledged. Department: PFA Contact: Jim Lynxwiler, 970-416-2869, ilvnxwiler(a)ooudre-fire.ora Topic: General Page 4 of 10 RESPONSE: Pedestrian ramps are no longer needed. Sidewalk is level with edge of pavement. Comment Number: 7 Comment Originated: 04/12/2016 04/12/2016: Sidewalk chase detail needs to be updated -I can send this to you if necessary. RESPONSE: Sidewalk chase detail is updated. Comment Number: 8 Comment Originated: 04/12/2016 04/12/2016: Notes 19, 41, EC 16 need to be revised. RESPONSE: Notes have been revised. Department: Environmental Planning Contact: Rebecca Everette, 970-416-2625, reverettengfcgov.com Topic: General Comment Number: 1 Comment Originated: 04/08/2016 04/08/2016: Please provide a seed mix (including scientific names) for the native seed areas. RESPONSE: Seed mix has been added. Comment Number: 2 Comment Originated: 04/08/2016 04/08/2016: The side slopes of the detention area should vary and range from 4:1 to 20:1 in slope, per the City of Fort Collins Stormwater Standards, which would also create a more naturalistic appearance. RESPONSE: The edges of the pond have been shaped to be a little more natural while still maintaining the required volume needed for detention. Comment Number: 3 Comment Originated: 04/08/2016 04/08/2016: Please add a note to the lighting plan that light fixture B should only be installed in the down -directional configuration. RESPONSE: Note added Department: Forestry Contact: Tim Buchanan, 970-221-6361, tbuchanan()fcgov.com Topic: Landscape Plans Comment Number: 1 Comment Originated: 04/13/2016 04/13/2016: In the plant list record sizes of trees and transplant method as B&B. Size trees as follows. Shade Trees 2.0 inch caliper Ornamental Trees 1.5 inch caliper Evergreen Trees 6 feet height RESPONSE: Caliper added to plant list on 1st sheet. Comment Number: 2 Comment Originated: 04/13/2016 04/13/2016: Shift the two street trees closest to the curb cut away some from the entry drive to prove increase visibility. RESPONSE: Trees have been shifted. Page 3 of 10 04/12/2016: There does not appear to be any landscaping in the shrub beds along the northeast lot line or on the southeast lot line. Consider adding shrubs to enhance visual interest, particularly along the southeast side of the building near Midpoint Drive. RESPONSE: Shrubs have been added as requested. Topic: Site Plan Comment Number: 5 Comment Originated: 04/12/2016 04/12/2016: A total of 8 bicycle parking spaces will required. The requirement for office use is a minimum of 4 bicycle parking spaces, regardless of the size of the office space. The site plan currently shows 5 bicycle spaces, so 3 more will need to be added. RESPONSE: 8 bicycle spaces are now shown on the plans. Department: Engineering Development Review Contact: Katie Sexton, 970-221-6501, ksexton fcoov.com Topic: General Comment Number: 1 Comment Originated: 04/12/2016 04/12/2016: Current driveway configuration does not conform to LCUASS access spacing standards (Table 7-3). A variance request letter will need to be prepared by a PE registered in the State of Colorado which outlines why the current design meets or exceeds the intent of the standard. RESPONSE Comment Number: 2 Comment Originated: 04/12/2016 04/12/2016: Additional right-of-way needs to be dedicated to accommodate the master street planned major collector cross section (LCUASS Figure 7-41F). ROW required for this cross section is 33 feet from the centerline. The sidewalk should be designed and constructed in the ultimate location - the back of walk should be the ROW line. Please label proposed vs existing ROW on site and utility plans. RESPONSE: Back of walk is the ROW line. Comment Number: 3 Comment Originated: 04/12/2016 04/12/2016: The existing easement along Midpoint Drive (dedicated by Prospect Industrial Park) appears to be about 6 feet long, which is what is shown on the utility plans. New easement area will need to be dedicated by separate document so that there is a 9 foot easement corridor behind the new ROW line. The proposed easement should be shown on site and utility plans. For more information about dedicating easements by separate document see: hftp://www.fcgov.com/engineering/pdf/Easrowdedications20lO.pdf RESPONSE. Utility Plan easement has been updated to match Site Plan, showing a 3' ROW dedication and a new 9' Utility and Drainage Easement. Comment Number: 4 Comment Originated: 04/12/2016 04/12/2016: A slope easement is shown on the site plan but not the utility plans. RESPONSE: Slope easement has been added to Utility Plar Comment Number: 5 Comment Originated: 04/12/2016 04/12/2016: Please show pedestrian ramps on utility plans plan view. Page 2 of 10 Fort Collins April 15, 2016 Cathy Mathis TB GROUP 444 MOUNTAIN AVENUE Berthoud, CO 80525 RE: 2590 Midpoint Drive, PDP160010, Round Number 1 Community Development and Neighborhood Services 281 North College Avenue PO Box 580 Fort Collins, CO 80522 970.221.6750 970.224.6134 - fax fcgov. com 0evelopmentreview Please see the following summary of comments from City staff and outside reviewing agencies for your submittal of the above referenced project. If you have questions about any comments, you may contact the individual commenter or direct your questions through the Project Planner, Meaghan Overton, at 970-416-2283 or moverton@fcgov.com. Comment Summary: Department: Planning Services Contact: Meaghan Overton, 970-416-2283, movertonCc0caov.com Topic: Building Elevations Comment Number: 4 Comment Originated: 04/12/2016 04/12/2016: What is the material proposed for the non-metal portions of the building facade? The elevations show "RV but this refers to a roof system element. The only wall systems I see listed are both metal accent panels. RESPONSE: Elevations have been updated with correct callouts Topic: General Comment Number: 1 Comment Originated: 04/12/2016 04/12/2016: What is the intended use of the asphalt area at the back of the site? Additional screening may berequired. RESPONSE: The asphalt area will be used as storage and fencing will be added as required for screening Topic: Landscape Plans Comment Number: 2 Comment Originated: 04/12/2016 04112/2016: The response letter indicated that there is a calculation showing that 6% of the parking lot interior is devoted to landscaping. I don't see that on the landscape plan. Please include this calculation. RESPONSE: We have added a calculation on the landscape plan. The total interior landscape area is 4.3%. The owner requested that we remove the landscape islands and trees at either side of the overhead doors due to the potential of large trucks and conflicts with the tree branches. Comment Number: 3 Comment Originated: 04/12/2016 Page 1 of 10