HomeMy WebLinkAboutSPRING CREEK FARMS NORTH FOURTH FILING - PDP - PDP130014 - SUBMITTAL DOCUMENTS - ROUND 2 - LETTER OF INTENTPlease confirm by your signature that based on design methodology presented to you and shown to date in the
preliminary utility plans, dated October 9, 2013, by Aspen Engineering, the proposed utility plans and existing
irrigation lateral and associated easement appears to be acceptable.
Sincerely,
JOHN GOOCH, PE
ASPEN ENGINEERING
DEVELOPER:
Printed Name/ Title:
Signature:
PROPERTY OWNER:
Printed Name/ Title: i )
S'fCae 5�'Gtv76I Mc,. CrJ �q[, li ��/ ihA/t4
Signature:
0
1, 11" 1'c
Date: t "1 13
Date I o f /I
October 9, 2013
Cargill
c/o Mr. Steve Stadelmaier,
2540 East Drake Road
Fort Collins, CO 80525
Re: Letter of Intent for Proposed Spring Creek Farms North Filing No. 4 Development and its relation
to the Existing Cargill Irrigation Lateral and Easement
Dear Mr. Stadelmaier,
The purpose of this letter of intent is to document our coordination with you in regards to the proposed Spring
Creek Farms North Filing No. 4 proposed single family development and any impacts the development could
potentially have on Cargill's existing 21" RCP irrigation lateral and associated easement that runs west -east
along the north side of Nancy Gray Avenue. The proposed development does not intend to propose any
changes or modifications to the existing irrigation lateral itself or the integrity of the lateral. However, Aspen
has noted that the proposed development will entail proposed grading and roadway and utility infrastructure
improvements to serve the development crossing over and under the existing irrigation lateral.
Aspen's preliminary -engineering plans provide for a residential local street (Adobe Drive- roadway running
north -south through the development) crossing over the existing irrigation line, with proposed 8" sanitary sewer
and 8" waterline crossing under the existing 21" RCP irrigation lateral. Aspen's preliminary grading plan
shows a cut below existing grade of approximately 2.0' in the area of the existing line. The resulting cover over
the existing irrigation line will be approximately 2.5', as shown on sheet C-013 of the preliminary engineering
plans. I
This letter of intent serves as record of the design effort and communication produced to date, and does not
signify acceptance of the improvements in relationship to the existing irrigation lateral and associated easement.
Aspen will continue to work with Cargill on design items related to the existing irrigation lateral with final
engineering design of the proposed utility plans and provisions to protect and uphold the integrity of the
existing irrigation lateral and the associated easement within the Spring Creek Farms North Filing No. 4 project