Loading...
HomeMy WebLinkAboutDISCOUNT TIRE @ NORTH COLLEGE MARKETPLACE - FDP - FDP130009 - CORRESPONDENCE -Department: Technical Services Contact: Jeff County, 970-221-6588, *county@fcgov.com Topic: Landscape Plans Comment Number: 10 04/30/2013: There are line over text issues on sheet LS-03. Topic: Site Plan Comment Number: 11 05/01/2013: There are line over text issues on sheet 1. See redlines. Comment Number: 12 05/01/2013: There are text over text issues on sheet 1. See redlines. Department: Water Conservation Contact: Eric Olson, 970.221-6704, eolsonna.fcgov.com Topic: General Comment Originated: 04/30/2013 Comment Originated: 05/01/2013 Comment Originated: 05/01/2013 Comment Number: 1. Comment Originated: 04/30/2013 04/30/2013: The irrigation plan is incomplete. Refer to Division 3.2 Section 3.2.1 (J) Irrigation: from our Landscape and Irrigation Standards to complete irrigation plan. Questions, contact Eric Olson, eolson@fcgov.com. Department: Water -Wastewater Engineering Contact: Roger Buffington, 970-221-6854, rbuffington(afcgov.com Topic: Construction Drawings Comment Number: 1 Comment Originated: 04/3012013 04130/2013: There is an existing valve on the fire line at the point where the 6" fire line connects to the 8" water main in the north/south drive. The additional valve shown on the utility plan is redundant and seems unnecessary. Topic: Landscape Plans Comment Number: 2 Comment Originated: 04/30/2013 04/30/2013: Show the water and sewer services on the landscape plan and adjust plantings to provide required separation distances. r Department: Stormwater Engineering Contact: Jesse Schlam, 970.218-2932, ischlam(cDfcgov.com Topic: Erosion Control Comment Number: 1 Comment Originated: 05/02/2013 05/02/2013: 1. SWMP Narrative - Identification of Pollutant Sources a. Note specific BMPs intended to be utilized to control Pollutant Sources. 2. Temporary / Permanent Seeding c. Attach Landscape Plans to SWMP Report. 3. Construction Sequence a. Provide detailed Construction Sequence — Reference attached Sheet C7A 4. Opinion of Cost — Security Calculations a. Add a 1.5 Multiplier for Total Security Cost. Department: Technical Services Contact: Jeff County, 970.221.6588, *county@fcgov.com Topic: Building Elevations Comment Number: 1 Comment Originated: 04/30/2013 04/30/2013: Please mask the text or bring it on top of the hatching on sheet A.1. See redlines. Comment Number: 2 Comment Originated: 04/30/2013 04/30/2013: There was not a full size sheet A.3 in our review set. Is this sheet still part of the full size plan set? If so, please provide a copy with the next review. Comment Number: 3 Comment Originated: 04/30/2013 04/30/2013: There are line over text issues on sheet A.4. See redlines. Topic: Construction Drawings Comment Number: 4 Comment Originated: 04/30/2013 04/3012013: Please update the benchmarks shown on sheet C1. Benchmark #42-01 is gone. Comment Number: 5 Comment Originated: 04/30/2013 04/30/2013: Please add a second benchmark to sheet C2. Comment Number: 6 Comment Originated: 04/30/2013 04130/2013: There are line over text issues on sheets C4, C5 & C8. Comment Number: 7 Comment Originated: 04/30/2013 04/30/2013: Please mask the text shown in hatching on sheets C9 & C10. Comment Number: 8 Comment Originated: 04/30/2013 04/30/2013: Why are the Landscape & Irrigation Plans included in the Utility Plan Set? Topic: General Comment Number: 9 Comment Originated: 04/30/2013 04/30/2013: There are line over text issues on sheet IR-02 of the Irrigation Plans. Topic: Landscape Plans Department: Engineering Development Review Contact: Marc Virata, 970-221.6567, mvirata(o)fcgov.com Topic: General Comment Number: 1 Comment Originated: 04/30/2013 04/30/2013: The construction plans shows "Preliminary Utility Plans" in the title on top of the cover sheet. Please remove "Preliminary". At the time of approval of the mylars for construction plans, only "Utility Plans" should be indicated. Comment Number: 2 Comment Originated: 04/30/2013 04130/2013: Any sets with "Final Development Plan" in the title will need to have Final Development Plan removed with the mylars for recording. Comment Number: 3 Comment Originated: 04/30/2013 04/30/2013: Given that Environmental Planning has no comments, the "Environmental Planner" signature on the approval of the construction plan set should be removed. Comment Number: 4 Comment Originated: 04/30/2013 04130/2013: The Landscape and Irrigation sheets that are attached to the construction plan set will not be bundled and filed with the construction plan set. It should be verified whether the sheets (especially the Irrigation sheets) are to be incorporated into the planning set. Comment Number: 5 Comment Originated: 04/30/2013 04/30/2013: The Lighting Plan should have Discount Tire at North College Marketplace in the title. Comment Number: 6 Comment Originated: 04/30/2013 04130/2013: After approval of the final plan, the project will be required to pull an excavation permit for the public infrastructure (in lieu of a more in depth Development Construction Permit). The excavation permit will need to be pulled prior to Engineering Inspection allowing an F&F permit. The cost of the excavation permit will total $419.90, comprising of a $30 application fee for the excavation permit, and $389.90 for inspection of the public infrastructure which was determined to be the fire line brought into the building. A spreadsheet with the Engineering Inspection Manager's determination of the $389.90 is provided. The excavation permit is available to be filled out by the contractor at: http://www.fcgov.com/engineering/pdf/Excavation PermitDigital. pdf Department: Environmental Planning Contact: Lindsay Ex, 970.224-6143, lex(&fcgov.com Topic: General Comment Number: 1 04/18/2013: No comments. Department: Stormwater Engineering Contact: Jesse Schlam, 970.218.2932, ischlam(ci)fcgov.com Topic: Erosion Control Comment Originated: 04/18/2013 City of Fort Collins ��- May 03, 2013 Angela Pinley KIMLEY-HORN & ASSOCIATES 990 S Broadway Suite 200 Denver, CO 80209 Community Development and Neighborhood services 281 North College Avenue Po Box 580 Fort Collins, CO 80522 970.221.6760 970.224.6134 - fax fcgov. com/develo pmentreview RRE: Discount Tire at North College Marketplace PDP with Addition of a Permitted Use, FDP130009, Please see3erfollowing summary of comments from City staff and outside reviewing agencies for your submittal of the above referenced project. If you have questions about any comments, you may contact the individual commenter or direct your questions through the Project Planner, Jason Holland, at 970-224-6126 orjholland@fcgov.com. Comment Summary: Department: Current Planning Contact: Jason Holland, 970-224.6126, iholland(afcgov.com Topic: General Comment Number: 1 Comment Originated: 05/0112013 04/30/2013: Please remove the words Final Development Plan from all title blocks and sheets. Comment Number: 2 Comment Originated: 05/01/2013 04/30/2013: Building Elevations — Please remove the word Conceptual from the plan sheets. Comment Number: 3 Comment Originated: 05/01/2013 04/30/2013: Please add a note 14. to the site plan: The Parking quantity provided has been reviewed and does not exceed the maximum permitted quantity for the overall North College Marketplace plan. Comment Number: 4 Comment Originated: 05/02/2013 05/02/2013: Comcast would like to have the builder provide a 2 inch conduit at the southwest corner of the lot to the building so service could be supplied. Contact: Dennis Greenwalt 970-484-7166 Department: Engineering Development Review Contact: Marc Virata, 970.221.6567, mvirata(cDfcgov.com Topic: General