Loading...
HomeMy WebLinkAboutDISCOUNT TIRE AT NORTH COLLEGE MARKETPLACE - PDP & APU - PDP120024 - CORRESPONDENCE - (3)12. PDP Site Plan 13. PDP Landscape Plan 14. PDP Architectural Elevations 15. PDP Lighting Plan 16. Preliminary Utility Plan Checklist 17. Preliminary Utility Plans 18. Drainage Compliance Letter 19. Discount Tire Acoustical Study 20. Traffic Impact Analysis Statement Letter 21. North College Marketplace Plat 22. North College Marketplace Lot Line Adjustment 23. North College Marketplace Geotechnical Engineering Study APU / PDP Re -Submittal —October 24v, 2012 1. Comment Response Letter 2. PDP Site Plan 3. PDP Landscape Plan 4. PDP Architectural Elevations 5. PDP Lighting Plan 6. Preliminary Utility Plans 7. North College Marketplace Plat 8. North College Marketplace Lot Line Adjustment 9. Drainage Compliance Letter APU / PDP Re -Submittal — November 29" , 2012 (Via Email) 1. PDP Site Plan 2. PDP Landscape Plan 3. PDP Architectural Elevations 4. PDP Lighting Plan S. Preliminary Utility Plans APU / PDP Re -Submittal — December 4"', 2012 1. PDP Landscape Plan APU / PDP Re -Submittal — December 6"', 2012 (Via Email) 1. Acoustical Study Update Thank you for your consideration in this request. Should you have any questions, please feel free to contact me at 303.228.2300. Sincerely, KIMLEY-HORN AND ASSOCIATES, INC. X�"ZK Gabri rell � �M -� and IGmley-lion Assodates, Inc. December 12th, 2012 Mr. Jason Holland City of Fort Collins Planning Department 281 North College Avenue Fort Collins, Colorado 80522 Re: Discount Tire at North College Marketplace Project Development Plan / Addition of a Permitted Use Submittal Documents Dear Mr. Holland, ■ Suite 200 990 South Broadway Denver, Colorado 80209 The following items have been submitted to the City for review in connection with the Addition of a Permitted Use (APU) and Project Development Plan (PDP). We request, therefore, that all of the items be entered into the record of the Planning and Zoning Board hearing scheduled for December 20, 2012. Concept Review Submittal — February 215t, 2012 1. Conceptual Review Application 2. Concept Site Plan 3. Concept Architecture (Submitted in the Concept Review) 4. Concept Landscape (Submitted in the Concept Review) Concept Review Site Plan Alternatives — March Sth, 2012 (Via Email) 1. Site Plan Alternative 1 2. Site Plan Alternative 2 Concept Review Site, Architecture and Landscape Package —July 6`s 2012 (Via Email) 1. Concept Review Comment Response Letter 2. City of Fort Collins Concept Plans 3. Applicant Concept Plans Initial APU / PDP Submittal —September 19", 2012 1. Development Review Application 2. Transportation Development Review Fee Application 3. Development Review Fees (Check Number 050056668 - $9,563.75) 4. Statement of Planning Objectives Letter 5. Hazardous Materials Statement Letter 6. Concept Review Comment Response Letter 7. Petition for an Addition of a Permitted Use Letter 8. Affected Homeowner Distribution Labels 9. Project Legal Description 10. PDP Checklist 11. PDP Routing Sheet ■ TEL 303 228 2300 I C=/1 Wey-Wom = and Associates, Inc. December 121h, 2012 Mr. Jason Holland City of Fort Collins Planning Department 281 North College Avenue Fort Collins, Colorado 80522 Re: Discount Tire at North College Marketplace Project Development Plan / Addition of a Permitted Use Additional Documents for Record of Planning and Zoning Hearing Dear Mr. Holland, ■ Suite 200 990 south Broadway Denver, Colorado 80209 Please find attached the following items for inclusion within the record of the December 20th, 2012 Planning and Zoning Board hearing. These documents are being transmitted via email in electronic format. Additionally a hard copy of the documents will be delivered to your attention. Attachments: 1. Transportation Impact Study (August, 2008) 2. Targeted Infill and Redevelopment Areas Map 3. North College Marketplace Overall Development Plan 4. North College Marketplace Architectural Elevations 5. Planning and Zoning Board Minutes a. Approval of ODP (January 151h, 2009) b. Approval of Amended ODP (May 21't, 2009) C. Regarding Rezoning to C-N (July 17th, 2008) d. Regarding Addition of Uses to North College Marketplace (August 21", 2008) e. Regarding Addition of Supermarket use toC-C-NZoning (November 4th,2008) 6. North College Marketplace Drainage and Erosion Control Report (August, 2009) 7. AIS to City Council (November 21st, 1995). Regarding Adoption of B-C and H-C Zones 8. AIS to City Council (December 17th, 2002). Regarding Addition of Supermarket Use 9. North College Urban Renewal Plan (December 21st, 2004) 10. North College Corridor Plan (March 14th, 2007) Thank you for your consideration in this request. Should you have any questions, please feel free to contact me at 303.228.2300. Sincerely, KIMLEY-HORN AND ASSOCIATES, INC. Gabri rell ■ TEL 303 228 2300