15. Normally, projects that are subject to Type Two review are required to conduct a
neighborhood information meeting. Section 2.2.2(A), however, allows the Director to
waive the neighborhood meeting if the development proposal would not have a significant
neighborhood impact.
16. Staff was interested in discovering that the restaurant features no indoor seating. This bit
of information was not included in the packet materials. While the walk-up window and
patio meet the letter of the Land Use Code, staff is concerned that the outside facility will
not be usable on a year-round basis. Please be sure that the P.D.P. includes a full
architectural depiction of what constitutes a "partially covered" outdoor seating area and
its relationship to the dispensing window. Also, please address what other features are
being provided that will allow the walk-up component to be usable, functional and
attractive to pedestrians and bicyclists.
Pre -Submittal Meetings for Building Permits
Pre -Submittal meetings are offered for new commercial or multi -family projects.
The applicant is encouraged to meet with plan reviewers early to mid -design stage typically
scheduled after the Current Planning conceptual review meeting. Applicants of new commercial proiects are advised to
call 970-416-2341to schedule a pre -submittal meeting. Applicants should be prepared to present site plans, floor plans, and
elevations and be able to discuss code issues of occupancy, square footage and type of construction being proposed.
Construction shall comply with the following adopted codes as amended:
2012 International Building Code (IBC)
2012 International Residential Code (IRC)
2012 International Energy Conservation Code (IECC)
2012 International Mechanical Code (IMC)
2012 International Fuel Gas Code (1FGC)
2012 International Plumbing Code (IPC) as amended by the State of Colorado
2014 National Electrical Code (NEC) as amended by the State of Colorado
Accessibility: State Law CRS 9-5 & ICC/ANSI Al17.1-2009.
Snow Load Live Load: 30 PSF / Ground Snow Load 30 PSF.
Frost Depth: 30 inches.
Wind Load: 100- MPH 3 Second Gust Exposure B.
Seismic Design: Category B.
Climate Zone: Zone 5.
Energy Code Use
1. Single Family; Duplex; Townhomes: 2012 IRC Chapter 11 or 2012 IECC Chapter 4.
2. Multi -family and Condominiums 3 stories max: 2012 IECC Chapter 4 Residential
Provisions.
3. Commercial and Multi -family 4 stories and taller: 2012 IECC Chapter 4 Commercial
Provisions.
Fort Collins Amendments effective starting 2/17/2014. Building Services, Plan Review. 970-416-2341.
5. Also, the approved architectural theme calls for synthetic stucco, where used, to be tan or
off-white. Masonry must be tan or brown tones. Synthetic stone, where used, must also
be tan or brown tones. Toward this end, the two existing projects, Burger King and the
mini -storage comply. The one building under construction, Big 0 Tire, also complies.
There are two buildings that are approved but have not broken ground, Ascent Climbing
Gym and Serious Texas Barbecue, both of which comply. As indicated by the
architectural elevations in the conceptual submittal, the proposed building would not
comply.
6. It appears that the applicant is familiar with the unique attributes of this parcel. Asa
platted lot, Lot 3 is significantly encumbered by a variety of easements. Consequently,
even though the site is listed as containing .70 acre, the net developable land area is
significantly less.
7. A north -south private sidewalk is needed on the west side of the parcel such that it
connects the public sidewalk on Bear Mountain to the south to Big 0 Tire to the north.
The best approach would be to match Big 0 Tire.
8. Please be sure that the trash enclosure is of sufficient size to accommodate both trash
and recycling containers. It is important to emphasize that it is illegal to discard
cardboard into the waste stream. Consequently, recycle containers must be sized
accordingly. For further information on the proper sizing of both trash and recycling
containers, please contact Caroline Mitchell, 970-221-6288, cmitchell@fcgov.com.
9. A landscape theme has been established along Timberline Road. Burger King, Big 0
Tire and Serious Texas Barbecue all feature tightly spaced Spring Snow Crabapple
Trees flanked by Colorado Blue Spruce trees. This pattern must be continued along the
east side of Lot 3. Please note that the Spruce trees may be of the pyramidal variety
(Bakeri, Hoopsi) or the columnar variety (Iseli Fastigiate) rather than the full size Colorado
Blue Spruce. Copies of these landscape plans are available.
10. Wherever a vehicle in the drive -through lane is facing either Timberline Road or Bear
Mountain Drive, the headlight glare onto the public roadway must be screened by dense
vegetation, an earthen berm, a screen wall or any combination thereof.
11. The Landscaping Plan must address how the menu board is screened from the public
streets.
12. Please note that the electrical transformer for Big 0 Tire maybe sufficient to supply power
to the proposed building. It would seem to be more efficient to pull power from one
transformer rather than installing anew one. If a transformer is needed, it must be placed
back from the roadway and screened by either a solid enclosure (meeting the proper
clearance specifications) or by dense landscaping on three sides. Also, the transformer
must be within 10 feet of hard surface for emergency change -out without damaging
landscaping.
13. Please note that Bear Mountain Drive is a public street.
14. With exposure along two public streets, all roof or ground -mounted mechanical
equipment, utility meters, exhaust fans, and the like, must be screened with a solid screen wall.
Simply landscaping these appurtenances has proven to be inadequate as demonstrated along Timberline Road
south of Horsetooth Road. Screen walls must match the materials and pattern of the building.
VA
Planning Services
Contact: Ted Shepard, 970-221-6343, tshepard@fcgov.com
1. The parcel is Lot 3 (.70 acre) of the Timberline Center Final Plan (18.30 acres). It is
located within Convenience Shopping Center sub -district (5.97 acres) of this Final Plan.
The Final Plan further designates Lot 3 as Parcel L and is approved for a retail building
approximately 7,500 square feet in size. Conversion of the designated land use from
retail to drive -through restaurant is considered a change in character and, therefore,
would require the submittal of a Major Amendment to the Final Plan.
2. Please note that Section 3.2.2(H) is specifically related to drive -through facilities and
states:
Drive-in Facilities. Any drive-in facilities, if permitted by the zone district regulations set
forth in Article 4, shall be secondary in emphasis and priority to any other access and
circulation functions. Such facilities shall be located in side or rear locations that do not
interrupt direct pedestrian access along connecting pedestrian frontage. The design and
layout of drive-in facilities for restaurants, banks, or other uses shall:
avoid potential pedestrian/vehicle conflicts;
provide adequate stacking spaces for automobiles before and after use of the facility;
provide adequate directional signage to ensure a free -flow through the facility; and
provide a walk-up service option as well as drive-in.
3. Section 3.5.3(E)(1) of the City of Fort Collins Land Use Code states:
Character and Image. In new buildings and, to the extent reasonably feasible, in
development projects involving changes to existing building walls, facades or awnings (as
applicable), the following standards shall apply:
(1)
Site Specific Design. Building design shall contribute to the uniqueness of a zone district,
and/or the Fort Collins community with predominant materials, elements, features, color
range and activity areas tailored specifically to the site and its context. In the case of a
multiple building development, each individual building shall include predominant
characteristics shared by all buildings in the development so that the development forms a
cohesive place within the zone district or community. A standardized prototype design
shall be modified as necessary to comply with the requirements of this subsection.
Our approach is to work with chain establishments that rely on a high degree of
recognition across the chain on a case by case basis. For example, in the past few
months, Staff has worked with five drive -through restaurants with Dutch Brothers Coffee
being the sixth.
4. The architectural character for the Timberline Center was established by approval of the
Final Plan. Please refer to sheet 4 of 8 which governs the broad parameters for all of the
commercial buildings within the center. Exterior materials and colors are specifically
indicated so that all 14 lots will be unified by a cohesive theme. For example, please note
that roofs within the center, in addition to being pitched, must be colored either green or
sage if metal, or tan or charcoal if asphalt shingle.
Department: Engineering Development Review
Contact: Sheri Langenberger, 970-221-6573, slangenberger@fcgov.com
1. Marc Ragasa mragasa@fcgov.com or 221-6603 will be the Engineer assigned to this
project. Please contact him if you have further questions regarding the engineering
comments or requirements.
2. Larimer County Road Impact Fees and Street Oversizing Fees are due at the time of
building permit. Please contact Matt Baker at 224-6108 if you have any questions.
3. The City's Transportation Development Review Fee (TDRF) is due at the time of
submittal. For additional information on these fees, please see:
http://www.fcgov.com/engineering/dev-review.php
4. Any damaged curb, gutter and sidewalk existing prior to construction, as well as streets,
sidewalks, curbs and gutters, destroyed, damaged or removed due to construction of
this project, shall be replaced or restored to City of Fort Collins standards at the
Developer's expense prior to the acceptance of completed improvements and/or prior
to the issuance of the first Certificate of Occupancy. All public sidewalk, driveways and
ramps existing or proposed adjacent or within the site need to meet ADA standards, if
they currently do not, they will need to be reconstructed so that they do meet current ADA
standards as a part of this project.
5. Any public improvements must be designed and built in accordance with the Larimer
County Urban Area Street Standards (LCUASS). They are available online at:
hftpJ/www.larimer.org/engineering/GMARdStds/UrbanSt.htm
6. This project is responsible for dedicating any right-of-way and easements that are
necessary or required by the City for this project.
7. Utility plans will be required and a Development Agreement will be recorded once the
project plans are approved.
8. Adequate screening needs to be provided between the drive thru lane and Timberline
Road as to screen the headlights of the waiting cars from the traffic on Timberline. If
vegetation is used it needs to be of a kind in which it retains it foliage in the winter.
9. A Development Construction Permit (DCP) will need to be obtained prior to starting any
work on the site.
10. Bike parking required for the project cannot be placed within the right-of-way and if
placed just behind the right-of-way need to be placed so that when bikes are parked
they do not extend into the right-of-way.
11. In regards to construction of this site. The public right-of-way shall not be used for
staging or storage of materials or equipment associated with the Development, nor shall
it be used for parking by any contractors, subcontractors, or other personnel working for
or hired by the Developer to construct the Development. The Developer will need to find
a location(s) on private property to accommodate any necessary Staging and/or parking
needs associated with the completion of the Development. Information on the
location(s) of these areas will be required to be provided to the City as a part of the
Development Construction Permit application.
> Shall be designated on the plat as an Emergency Access Easemel
> Maintain the required 20 foot minimum unobstructed width & 14 foot minimum
overhead clearance.
> Be designed as a flat, hard, all-weather driving surface capable of supporting 40 tons.
> Dead-end fire access roads in excess of 150 feet in length shall be provided with an
approved area for turning around fire apparatus.
> The required turning radii of a fire apparatus access road shall be a minimum of 25
feet inside and 50 feet outside. Turning radii shall be detailed on submitted plans.
> Be visible by painting and/or signage, and maintained unobstructed at all times.
> Additional access requirements exist for buildings greater than 30' in height. Refer to
Appendix D of the 2012 IFC or contact PFA for details.
International Fire Code 503.2.3, 503.2.4, 503.2.5, 503.3, 503.4 and Appendix D;
FCLUC 3.6.2(B)2006 and Local Amendments.
2. WATER SUPPLY
A fire hydrant is required within 300' of the building as measured along the path of
vehicle travel. The existing utility infrastructure already available in the area appears to
meet minimum requirements, however it is the applicant's responsibility to verify
location, volume and pressure. Code language provided below.
> IFC 508.1 and Appendix B: COMMERCIAL REQUIREMENTS: Hydrants to provide
1,500 gpm at 20 psi residual pressure, spaced not further than 300 feet to the building.
Department: Environmental Planning
Contact: Kelly Kimple, , kkimple@fcgov.com
1. With respect to landscaping and design, the City of Fort Collins Land Use Code, in
Article 3.2.1 (E)(2)(3), requires that you use low -water -use plants and grasses in your
landscaping or re -landscaping and reduce bluegrass lawns as much as possible.
2. Our city has an established identity as a forward -thinking community that cares about the
quality of life it offers its citizens and has many sustainability programs and goals that
may benefit your project. Of particular interest may be the:
1. ClimateWise program: http://www.fcgov.com/climatewise/
2. Zero Waste Plan and the Waste Reduction and Recycling Assistance Program
(WRAP):
http://www.fcgov.com/recycling/pdf/_20120404_WRAP_ProgramOverview.pdf, contact
Caroline Mitchell at 970-221-6288 or cmtichell@fcgov.com
3. Green Building and the Climate Action Plan:
http://www.fcgov.com/enviro/green-building.php, contact Tony Raeker at 970-416-4238
or traeker@fcgov.com
4. Nature in the City Strategic Plan: http://www.fcgov.com/planning/natureinthecity/?
key=advanceplanning/natureinthecity/, contact Lindsay Ex at 970-221-6767 or
lex@fcgov.com
Please consider the City's sustainability goals and ways for your development to
engage with these efforts.
n
httpJ/www.fcgov. comic,, cities/what-we-do/stormwate r/stormwate r-quaff ity/low-impact-dev
elopment
4. Per Colorado Revised Statute §37-92-602 (8) effective August 5, 2015, criteria
regarding detention drain time will apply to this project. As part of the drainage design,
the engineer will be required to show compliance with this statute using a standard
spreadsheet (available on request) that will need to be included in the drainage report.
Upon completion of the project, the engineer will also be required to upload the
approved spreadsheet onto the Statewide Compliance Portal. This will apply to any
volume based stormwater storage, including extended detention basins and
bio-retention cells.
5. The city wide Stormwater development fee (PIF) is $7,817/acre ($0.1795 sq.-ft.) for new
impervious area over 350 sq.-ft., and there is a $1,045.00/acre ($0.024/sq.-ft.) review
fee. No fee is charged for existing impervious area. These fees are to be paid at the
time each building permit is issued. Information on fees can be found at:
http://www.fcgov.com/utilities/business/builders-and-developers/plant-investment-develo
pment-fees or contact Jean Pakech at 221-6375 for questions on fees. There is also an
erosion control escrow required before the Development Construction permit is issued.
The amount of the escrow is determined by the design engineer, and is based on the
site disturbance area, cost of the measures, or a minimum amount in accordance with
the Fort Collins Stormwater Manual.
6. The design of this site must conform to the drainage basin design of the Foothills Basin
Master Drainage Plan as well the Fort Collins Stormwater Manual.
Department: Fire Authority
Contact: Jim Lynxwiler, 970-416-2869, Ilynxwiler@poudre4ire.org
1. FIRE LANE
Fire access is required to within 150' of all exterior portions of the building. Fire access
cannot be measured from an arterial road. If the building is to be equipped with a fire
sprinkler system, fire access on the property may not be needed. Otherwise, an
Emergency Access Easement will be required and standard fire lane specifications
shall apply. Code language and fire lane specifications provided below.
> IFC 503.1.1: Approved fire Lanes shall be provided for every facility, building or
portion of a building hereafter constructed or moved into or within the jurisdiction. The
fire apparatus access road shall comply with the requirements of this section and shall
extend to within 150 feet of all portions of the facility and all portions of the exterior walls
of the first story of the building as measured by an approved route around the exterior of
the building or facility. When any portion of the facility or any portion of an exterior wall of
the first story of the building is located more than 150 feet from fire apparatus access,
the fire code official is authorized to increase the dimension if the building is equipped
throughout with an approved, automatic fire -sprinkler system.
FIRE LANE SPECIFICATIONS
A fire lane plan shall be submitted for approval prior to installation. In addition to the
design criteria already contained in relevant standards and policies, any new fire lane
must meet the following general requirements:
Department: Water -Wastewater Engineering
Contact: Shane Boyle, 970-221-6339, sboyle@fcgov.com
1. Existing water and sewer mains in the vicinity include 8-inch water mains in Bear
Mountain and the driveway to the west and an 8-inch sewer main in the driveway to the
west. Existing 1-inch water service, 6-inch fire line, and a sewer services are stubbed
into the site. These services must be reused with this development or abandoned at the
main.
2. The water conservation standards for landscape and irrigation will apply. Information on
these requirements can be found at: http://www.fcgov.com/standards
3. Development fees and water rights will be due at building permit.
Department: Traffic Operations
Contact: Martina Wilkinson, 970-221-6887, mwilkinson@fcgov.com
1. Since this type of use was anticipated with the original approvals, not further traffic
analysis is needed.
2. It would be very helpful to include a north/south sidewalk along the western edge of the
parcel to support pedestrians connectivity among uses in the overall area.
Department: Stormwater Engineering
Contact: Shane Boyle, 970-221-6339, sbovle@fcgov.com
1. A drainage report, erosion control report, and construction plans are required and they
must be prepared by a Professional Engineer registered in Colorado. The drainage
report must address the four -step process for selecting structural BMPs. There is a final
site inspection required when the project is complete and the maintenance is handed
over to an HOA or another maintenance organization. The erosion control report
requirements are in the Fort Collins Stormwater Manual, Section 1.3.3, Volume 3,
Chapter 7 of the Fort Collins Amendments. If you need clarification concerning this
section, please contact the Erosion Control Inspector, Jesse Schlam at 224-6015 or
jschlam@fcgov.com.
2. The proposed site plan must meet the engineering assumptions from the approved plan
for Timberline Center with regards to percent impervious. Detention and water quality
are provided in the existing detention pond to the north as long as there is no increase in
percent impervious from the approved plan. The development will need to provide
drainage infrastructure to get onsite runoff into the detention pond.
3. Low Impact Development (LID) requirements are required on all new or redeveloping
property which includes sites required to be brought into compliance with the Land Use
Code. These require a higher degree of water quality treatment for 50% of the new
impervious area and 25% of new paved areas must be pervious. Standard operating
procedures (SOPs) for all onsite drainage facilities will be included as part of the
Development Agreement. More information and links can be found at:
2
Form of
Community Development and
Neighborhood Services
281 North College Avenue
PO Box 580
Fort Collins, CO 80522
970.221.6750
970.224.6134 - fax
fcgov.com
October 08, 2015
Lee Martin
Landmark Engineering
3521 W Eisenhower Blvd.
Loveland, CO 80537
Re: 2039 Timberline Rd. - Drive-thru Restaurant
Description of project: This is a request to construct a drive-thru coffe shop at 2039
Timberline Rd. (parcel #8719144003), Lot 3, Timberline Center Final Plan. The proposed
site plan shows a 720 sq. ft. building with one drive-thru lane, a walk-up window and
outdoor seating. 13 parking spaces are shown on the proposed site plan. The site is
located at the northwest corner of Timberline Road and Bear Mountain Drive and zoned
Industrial (1) zone district. This proposal will be subject to Planning & Zoning Board (Type II)
review as a Major Amendment..
Please see the following summary of comments regarding the project request referenced
above. The comments offered informally by staff during the Conceptual Review will assist you
in preparing the detailed components of the project application. Modifications and additions
to these comments may be made at the time of formal review of this project. If you have any
questions regarding these comments or the next steps in the review process, you may contact
the individual commenter or direct your questions through the Project Planner, Ted Shepard,
at 970-221-6343 or tshepard @fcgov.com.
Comment Summary:
Department: Zoning
Contact: Gary Lopez, 970-416-2338, glopez@fcgov.com
1. Please remove any notes regarding signage as a separate review and permit is
required for such.
2. Zoning would prefer to seethe menu/order board located further north at the turn of the
queuing driveway and at a 45 degree angle. This is to restrict any illumination toward
Timberline.
3. Note that the property is located in the Residential Neighborhood Sign District which will
restrict signage. The development will be considered a Neighborhood Service Center.
LUC 3.8.7(E) will apply.