PLEASE NOTE: THIS PLAN SET IS USING NAVD88 FOR A VERTICAL
DATUM. SURROUNDING DEVELOPMENTS HAVE USED NGVD29
UNADJUSTED FOR THEIR VERTICAL DATUMS.
IF NGVD29 UNADJUSTED DATUM IS REQUIRED FOR ANY PURPOSE,
THE FOLLOWING EQUATION SHOULD BE USED: NGVD29 UNADJUSTED
= NAVD88 - X.XX�.
Comment Number: 15
Comment Originated: 01/11/2016
02/16/2016: All benchmark statements must match on all sheets.
01/11/2016: All benchmark statements must match on all sheets.
Comment Number: 16
02/16/2016: There are line over text issues. See redlines.
01/11/2016: There are line over text issues. See redlines.
Topic: Site Plan
Comment Number: 18
02/16/2016: There are spelling issues. See redlines.
Department: Water Conservation
Contact: Eric Olson, 970-221-6704, eolson@fcgov.com
Comment Number: 1
Comment Originated: 01/11/2016
Comment Originated: 02/16/2016
Comment Originated: 01/05/2016
01/05/2016: Irrigation plans are required no later than at the time of building
permit. The irrigation plans must comply with the provisions outlined in Section
3.2.1(J) of the Land Use Code. Direct questions concerning irrigation
requirements to Eric Olson, at 221-6704 or eolson@fcgov.com
Comment Number: Comment Originated: 01/05/2016
Department: Water -Wastewater Engineering
Contact: Wes Lamarque, 970-416-2418, wlamargue@fcgov.com
Topic: General
Comment Number: 5 Comment Originated: 02/16/2016
02/16/2016: On the Utility plan, the meter pit leader references Note 1, but no
note is located on the sheet.
4
02/17/2016: Electric capacity charges for underground electric systems for
Timberline Center lots 1-14 have already been paid. kVA charges and
secondary service charges will still apply to this project. Please refer to the web
site referenced in comment number 6 for electric fee details.
Comment Number: 3
Comment Originated: 02/17/2016
02/17/2016: Contact Light and Power Engineering to coordinate the
transformer and electric meter locations, please show the locations on the utility
plans.
Comment Number: 4 Comment Originated: 02/17/2016
02/17/2016: Transformer locations shall be within 10' of a paved surface and
must have a minimum of an 8' clearance from the front side and a 3' clearance
around the sides and rear. (1000 kVA up to 2500 kVA requires 4' around the
sides and rear.)
Comment Number: 5
Comment Originated: 02/17/2016
02/17/2016: Please provide a one line diagram and a C-1 form to Light and
Power Engineering. The C-1 form can be found at:
http://zeus.fcgov.com/utils-procedures/files/EngWiki/WikiPdfs/C/C-1 Form.pdf
Comment Number: 6
Comment Originated: 02/17/2016
02/17/2016: Please contact Light & Power Engineering if you have any
questions at 221-6700. Please reference our policies, development charge
processes, and use our fee estimator at
http://www.fcgov.com/uti I ities/b usiness/b u i lders-and-developers.
Department: PFA
Contact: Jim Lynxwiler, 970-416-2869, Ilynxwiler@poudre-fire.ory
Topic: General
Comment Number: 1
Comment Originated: 02/17/2016
02/17/2016: SIGNS
The dedicated fire lane shall be signed at a minimum of two locations (with
indicating arrows) as per our development review meeting of 2/17/16. Code
language provided below.
> IFC D103.6: Where required by the fire code official, fire apparatus access
roads shall be marked with permanent NO PARKING - FIRE LANE signs
complying with Figure D103.6 of the IFC. Signs shall have a minimum
dimension of 12 inches wide by 18 inches high and have red letters on a white
reflective background. Signs shall be posted on one or both sides of the fire
apparatus road as required by Section D103.6.1 or D103.6.2.
Department: Technical Services
Contact: Jeff County, 970-221-65889 'county@fcgov.com
Topic: Construction Drawings
Comment Number: 13 Comment Originated: 01/11/2016
02/16/2016: This does not match the format in previous comment. See
redlines.
01/11/2016: Please provide the following information for the Benchmark
Statement in the EXACT format shown below.
3
Comment Number: 18 Comment Originated: 02/16/2016
02/16/2016: Please remove the logo from the Cover Sheet Title.
Department: Engineering Development Review
Contact: Marc Ragasa, 970.221.6603, mragasa@fcgov.com
Topic: General
Comment Number: 7 Comment Originated: 01/12/2016
02/12/2016: Label all sidewalk ramps on Timberline Road and Bear Mountain
Drive.
01/12/2016: Provide existing infrastructure 150' beyond property limits. Include
items such as sidewalks, ramps, etc. Label sidewalk width on Timberline Road
and Bear Mountain.
Comment Number: 9
Comment Originated: 01/12/2016
01/12/2016: A letter of intent to complete offsite tie in to Lot 2 to the north is
required prior to hearing.
Comment Number: 14 Comment Originated: 02/12/2016
02/12/2016: Please add the standard sidewalk repair note to Sheet 4 (Utility &
Demolition Plan) of the utility plan and the site plan:
"Any damaged curb, gutter and sidewalk existing prior to construction, as well
as streets, sidewalks, curbs and gutters, destroyed, damaged or removed due
to construction of this project, shall be replaced or restored to City of Fort
Collins standards at the Developer's expense prior to the acceptance of
completed improvements and/or prior to the issuance of the first Certificate of
Occupancy."
Comment Number: 15
Comment Originated: 02/12/2016
02/12/2016: Please work with PFA to determine what signage or easement
vacations are needed for the drive/parking areas that are within the Emergency
Access Easement.
Department: Forestry
Contact: Tim Buchanan, 970-221-6361, tuchanan@fcgov.com
Topic: Landscape Plans
Comment Number: 1
Comment Originated: 01/19/2016
02/08/2016:
01 /19/2016:
List the percentage of each tree species used and check that quantities meet
the minimum species diversity standard LUC 3.2.1 D 3.
Department: Light And Power
Contact: Coy Althoff, CAlthoff@fcgov.com
Comment Number: 1
Comment Originated: 02/17/2016
02/17/2016: Both single phase and 3-phase power is available to this site.
Light & Power has electric facilities in the underground vault at the corner of
Bear Mountain Dr. and Timberline Rd. that can be utilized for serving this property.
Comment Number: 2 Comment Originated: 02/17/2016
2
Fort of
Community Development and
Neighborhood Services
281 North College Avenue
PO Box 580
Fort Collins, CO 80522
970,221.6750
970.224.6134 - tax
kgov. com/developmentreview
February 19, 2016
One Fifty Five LLC
720 S Oklahoma St
Kennewick, WA 99336
RE: Dutch Brothers Coffee - Timberline Center Major Amendment, MJA150008,
Round Number 2. Please seethe following summary of comments from City staff and outside reviewing
Agencies. If you have questions about any comments, you may contact the individual commenter or
direct your questions through the Project Planner, Ted Shepard, at 970-221-6343 or tshepard@fcgov.com.
Comment Summary:
Department: Planning Services
Contact: Ted Shepard, 970-221-6343, tshepard@fcgov.com
Topic: General
Comment Number: 13
Comment Originated: 01/13/2016
02/16/2016: In order to meet the allowable exception to the build -to line along
Bear Mountain Drive, which would have the effect of placing the building no
further back than 15 feet from the property line, the details of the patio area
need to be established on one of the plan sheets. This could be done on the
Site Plan or as a separate detail. Components may include, but not be limited
to tables, chairs, picnic tables, trash containers, seat walls, and the like.
Comment Number: 14
Comment Originated: 02/16/2016
02/16/2016: The applicant's response indicates that seven bike parking
spaces are provided but only one rack is indicated on the site plan. It is not
clear how seven bikes can be parked at one rack. Please clarify.
Comment Number: 15 Comment Originated: 02/16/2016
02/16/2016: Please provide information on how many cars can be stacked
behind the order window without impacting the private north -south drive.
Comment Number: 16
Comment Originated: 02/16/2016
02/16/2016: Please show the approximate location of the directional signage
for the drive -through lane.
Comment Number: 17
Comment Originated: 02/16/2016
02/16/2016: On the Cover Sheet, please add to note number seven: "Under
canopy light fixtures must be flush -mount with flat lens."