Loading...
HomeMy WebLinkAboutHARMONY COMMONS - PDP - PDP150027 - SUBMITTAL DOCUMENTS - ROUND 1 - TDR APPLICATIONShow Receipt Detail Page I of 1 RECEIPT CITY OF FORT COLLINS COMMUNITY DEVELOPMENT & NEIGHBORHOOD SERVICES 281 N. COLLEGE AVE 970.221.6760 PO BOX 580 970.224.6134 -fax Application: PDP150027 Application Type: Planning/Project Development Plan/NA/NA Address. 3420 TIMBERWOOD DR, FORT COLLINS, CO 80528 Receipt No. 250107 Payment Method Ref Number Amount Paid Payment Date Cashier ID Received Comments Check 160 $25,138.50 12/03/2015 MGLASGOW Pay by Brinkman Capital LLC check # 160 for Development Reveiw Fee ($5879.00), Sign posting fee ($50.00), Mailing fee ($447.00), PFA fee ($250.00)and Transportation Development Reveiw fee ($18512.50) Owner Info.: HARMONY TECHNOLOGY PARK LLC 2723 S STATE ST STE 250 ANN ARBOR, 48104 Project This is a project request to develop approximately 4 acres for a new Description: Convenience Shopping Center and an office building. https://ahn-v360.fcgov.comlportlets/feelreceiptV iew.do?mode=view&autoPrint=false&rec... 12/3/2015 Co is ire 1212i/15 Rt Collins Transportation Development Review Fee Date Received/ Paid Total Amount Paid �f Project Name: Harmony Commons Project Location: 3420 Ttmberwood Drive Date: 12.01.15 Type of Submittal Please indicate the type of application submitted by checking the box General Information: preceding the appropriate request(s). Owners Name(s): Harmony Technology Park, LLC 0 Overall Development Plan (ODP) ❑ Final Development Plan (FDP) This fee includes 2 rounds of review Fee structure amount due $500 each $1000 each ❑ Additional round of review $ 500 each ❑ Annexation $20X acres= +$250 = The maximum fee for each annexation document/ filing shall be $2,000 ❑ Minor Amendment $158 each ❑ Major Amendment $2,500 each ❑ Re -zone $200 each ❑ Modification to Land Use Code $200 each 0 Wireless Telecommunication Equipment (WTE) $65 each ❑ Road Projects acres (of roadway) X $3,500 = ❑ Vacation of Easement(s) *** # of vacations _ X S400 = ❑ Vacation of Right(s)-of-Way *** # of vacations _ X $800 = ❑ Dedication of Easements) and/or Right(s)-of-Way *** # of dedications X $250 = Project Development Plan (PDP) or Basic Development Review Project requiring Transportation Services Review and/or utility plan review. This fee includes 3 rounds of review. Detached Single Family $160 perunit # of units X $160 = Multifamily or other residential units $115 per unit # of units X $115 = Commercial, Industrial, Retail, and/or Non residential building square footage $0.25 per square foot 50,600 sq ft X $0.25 = $12,650 Size of the development (area being platted or if not being platted size of parcel accompanying all development improvements) $250 per acre 15.45 acres X $ 250 = $3,862.50 Project fee $2,000 each SZM Total of above amounts $18,512.50 If this fee amount exceeds $30,000 then the fee amount shall be adjusted with the following formula: $30,000 + %n (the amount over 30,000 The maximum fee for any residential ONLY project shall be $500 per residential unit. This check should be used to verify the fee amount (does not apply to mixed -use developments). PDP fee shall be the lesser of this amount or the above calculated amount. # of residential units X $500 = If this fee amount equals or exceeds $65,000 then the City Manager shall have the ability to reduce the fee amount. Street address: 2723 South State Street #250 City/State/Zip: Ann Arbor MI 48104 Telephone: Fax: Applicants/ Consultants Firm Name: Brinkman Development Contact: Todd Parker Street address: 3528 Precision Drive City/State/ Zip: Fort Collins CO 80528 Telephone: 970.672.1014 Fax: Certification: By signing this permit I acknowledge that I am acting with the knowledge, consent, and authority of the owners of the property (including all owners having legal or equitable interest in the real property, as defined in Section 1-2 of the City Code; and including common areas legally connected to or associated with the property which is the subject of this application) without whose consent and authority the requested action could not lawfully be accomplished. Pursuant to said authority, I hereby permit City officials to enter upon the property for purposes of inspection. Name ease print): d fa1 ter Signat re: Telephone: .1014 Foot Notes: When a development project involves a change of use for a building, the charge per square foot shall apply to the portion of the overall building size for which the change of use is proposed, provided that the new use generates more traffic than the existing use, as determined by the current Institute of Transportation Engineers Trip Generation. If the new use does not generate more traffic than the existing use then the charge per square foot for shall apply only to the net additional building size (if any). These fees do not include the cost of filing fees for the recording of the Development Agreement. When a Development Agreement or Amendment Agreement is entered into the Developer shall be responsible for the cost of recording the document. Said filing fees shall be calculated and provided when the signed document is retuned to the City for signatures and filing. Reduction for affordable housing — a copy of the City letter certifying/ authorizing the *** This fee does not include the cost of filing fees. Filing affordable housing shall be provided with this application. Amount of reduction to be fees shall be determined at the time of final document applied submittal and will be required prior to filing. Total owed for PDP $18,512.50 cc: Christie White, Engineering 2012 form Development Review Engineering