HomeMy WebLinkAboutEYE CENTER OF NORTHERN COLORADO - PDP - PDP150029 - CORRESPONDENCE -Additionally it should include the cut -sheets for the fixtures that are proposed?
Comment Number: 7 Comment Originated: 12/28/2015
02/03/2016: The LUCA fixture is not down directional. Please choose a fixture
that is down directional and fully shielded.
Also please add a not to the lighting plan sheets that the WST LED fixture will
not be installed in the inverted position.
12/28/2015: Are there not any light fixtures proposed on the building?
Comment Number: 10 Comment Originated: 02/03/2016
02/03/2016: Please remove the signage from the plans. Signs are approved
through a separate sign permit.
Comment Number: 11
Comment Originated: 02/03/2016
02/03/2016: Add a detail of the wall. The wall are not appearing on the
landscape plan. Please add these to verify the appropriate location.
E7
Department: Traffic Operation
Contact: Martina Wilkinson, 970-221-6887, mwilkinson@fcgov.com
Topic: General
Comment Number: 2
Comment Originated: 12/29/2015
12/29/2015: The site plan shows head -in parking along the east side of the
building. Because this connecting roadway will see quite a bit of traffic, the
functionality of backing out into traffic is not ideal. Since the proposal has more
parking spaces than the max, can they be eliminated? Or, if they can't be
eliminated, can speed tables be installed to slow down the north -south traffic
and caution drivers that cars may be backing out into the travel lane?
Comment Number: 3 Comment Originated: 02/02/2016
02/02/2016: The parking lots (both front and back) are laid out in a manner that
people parking in the outer aisles will need to snake their way between cars in
the closer aisle to get to the entrances. Can a sidewalk be constructed to
provide easy access from entrance to outer parking aisles?
Department: Water Conservation
Contact: Eric Olson, 970-221-6704, eolson@fcqov.com
Topic: General
Comment Number: 1
Comment Originated: 12/22/2015
12/22/2015: Irrigation plans are required no later than at the time of building
permit. The irrigation plans must comply with the provisions outlined in Section
3.2.1(J) of the Land Use Code. Direct questions concerning irrigation
requirements to Eric Olson, at 221-6704 or eolson@fcgov.com
Department: Water -Wastewater Engineering
Contact: Shane Boyle, 970-221-633% sbovle@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 12/30/2015
01/27/2016: Please check separation distances for all utilities. It appears the
proposed transformer does not meet minimum separation distances from the
water service and there are several instances where landscape separations are
not being met for both water and sewer services.
12/30/2015: Please ensure a minimum of 10' of separation between the curb
stop and the storm sewer.
Comment Number: 2 Comment Originated: 01/27/2016
01/27/2016: Please provide water usage calculations for the 3-inch meter.
Department: Zoning
Contact: Noah Beals, 970-416-2313, nbeals@fcgov.com
Topic: General
Comment Number: 6 Comment Originated: 12/28/2015
12/28/2015: The lighting plan needs to show the footcandles across the entire
property and 20ft beyond the property line.
7
Contact: Shane Boyle, 910-221-6339, sbovle@fcgov.com
Topic: Drainage Report
Comment Number: 6 Comment Originated: 01/27/2016
01/27/2016: Please provide verification that the required detention volume is
being met in the paver subgrade.
Topic: General
Comment Number: 5 Comment Originated: 12/30/2015
01/27/2016: Please see additional minor redlines.
12/30/2015: Please see additional minor redlines in the Drainage Report and
Utility Plans.
Department: Technical Services
Contact: Jeff County, 970-221-6588, jcounty�fcgov.com
Topic: Building Elevations
Comment Number: 2
Comment Originated: 12/30/2015
02/02/2016: There are line over text issues. See redlines.
12/30/2015: There are line over text issues. See redlines.
Comment Number: 15
Comment Originated: 02/02/2016
02/02/2016: The titles do not match the titles in the index on the Site Plan. See
redlines.
Comment Number: 16
Comment Originated: 02/02/2016
02/02/2016: There are text over text issues. See redlines.
Topic: Construction Drawings
Comment Number: 4 Comment Originated: 12/30/2015
02/02/2016: Not all notes have been removed.
12/30/2015: Please remove the reference to Windsong At Rock Creek. This
project has not been filed. See redlines.
Comment Number: 18 Comment Originated: 02/02/2016
02/02/2016: There is text that needs to be rotated 180 degrees. See redlines.
Topic: Lighting Plan
Comment Number: 17 Comment Originated: 02/02/2016
02/02/2016: The titles do not match the titles in the index on the Site Plan. See
redlines.
Topic: Site Plan
Comment Number: 14 Comment Originated: 02/02/2016
02/02/2016: The titles in the sheet index do not match the titles on the noted
sheets. See redlines.
0
Comment Number: 6
Comment Originated: 12/29/2015
12/29/2015: Please provide a one line diagram and a C-1 form to Light and
Power Engineering. The C-1 form can be found at:
http://zeus.fcgov.com/utils-procedures/files/EngWikiMikiPdfs/C/C-1 Form.pdf
Comment Number: 7
Comment Originated: 12/29/2015
12/29/2015: Please contact Light & Power Engineering if you have any
questions at 221-6700. Please reference our policies, development charge
processes, and use our fee estimator at
http://www.fcgov. com/uti I ities/b usi ness/b u ilde rs-and-developers.
Department: PFA
Contact: Jim Lynxwiler, 970-416-2869, ilynxwiler@poudre-fire.org
Topic: General
Comment Number: 3 Comment Originated: 02/02/2016
02/02/2016: MARKING
> IFC503.3: Where required by the fire code official, approved signs or other
approved notices that include the words NO PARKING - FIRE LANE shall be
provided for fire apparatus access roads to identify such roads or prohibit the
obstruction thereof. The means by which fire lanes are designated shall be
maintained in a clean and legible condition at all times ad be replaced or
repaired when necessary to provide adequate visibility.
SIGNS
> IFC D103.6: Where required by the fire code official, fire apparatus access
roads shall be marked with permanent NO PARKING - FIRE LANE signs
complying with Figure D103.6. Signs shall have a minimum dimension of 12
inches wide by 18 inches high and have red letters on a white reflective
background. Signs shall be posted on one or both sides of the fire apparatus
road as required by Section D103.6.1 or D103.6.2.
Department: Stormwater Engineering
Contact: Jesse Schlam, 970-218-2932, jschiam@fcgov.com
Topic: Erosion Control
Comment Number: 1
Comment Originated: 12/09/2015
01/22/2016: Repeat. Will look for in FDP rounds
12/09/2015: The site disturbs more than 10,000 sq-ft, therefore Erosion and
Sediment Control Materials need to be submitted for FDP. The erosion control
requirements are in the Stormwater Design Criteria under the Amendments of
Volume 3 Chapter 7 Section 1.3.3. Current Erosion Control Materials
Submitted do not meet requirements. Please submit; Erosion Control Plan,
Erosion Control Report, and an Escrow / Security Calculation. If you need
clarification concerning the erosion control section, or if there are any questions
please contact Jesse Schlam 970-218-2932 or email @ jschlam@fcgov.com
5
2012 International Energy Conservation Code (IECC)
2012 International Mechanical Code (IMC)
2012 International Fuel Gas Code (IFGC)
2012 International Plumbing Code (IPC) as amended by the State of Colorado
2014 National Electrical Code (NEC) as amended by the State of Colorado
Fort Collins has amendments to most of the codes listed above. See the
fcgov.com web page to view them.
Accessibility: State Law CRS 9-5 & ICC/ANSI A117.1-2009.
Snow Load Live Load: 30 PSF / Ground Snow Load 30 PSF.
Frost Depth: 30 inches.
Wind Load: 100- MPH 3 Second Gust Exposure B.
Seismic Design: Category B.
Climate Zone: Zone 5
Energy Code Use
1. Single Family; Duplex; Townhomes: 2012 IRC Chapter 11 or 2012 IECC.
2. Multi -family and Condominiums 3 stories max: 2012 IECC residential
chapter.
3. Commercial and Multi -family 4 stories and taller: 2012 IECC commercial
chapter.
Department: Light And Power
Contact: Coy Althoff, , CAlthoff@fcgov.com
Topic: General
Comment Number: 1
Comment Originated: 12/29/2015
12/29/2015: Primary electric distribution is currently running along the West
side of Ziegler Rd.
Comment Number: 2 Comment Originated: 12/29/2015
12/29/2015: Development charges, electric Capacity Fee, Building Site
charges and any system modification charges necessary will apply to this
development.
Comment Number: 3
Comment Originated: 12/29/2015
12/29/2015: Contact Light and Power Engineering to coordinate the
transformer and electric meter locations, please show the locations on the utility
plans.
Comment Number: 4 Comment Originated: 12/29/2015
12/29/2015: Transformers shall be within 10' of a paved surface and must have
8' clearance from the front and 3' clearance around the sides and back.
Comment Number: 5 Comment Originated: 12/29/2015
02/04/2016: Please show and label the street lights locations on the utility, site,
and landscape plans.
12/29/2015: Streetlights will be placed along public streets. A 40 feet
separation on both sides of the light is required between canopy trees and
streetlights. A 15 feet separation on both sides of the light is required between
ornamental trees and streetlights.
n
Ideally, we should De exploring how access points can be consoudated/shared
across adjoining properties, as depending on future development, their access
options may be hampered by not being able to share/consolidate.
Department: Environmental Planning
Contact: Rebecca Everette, 970-416-2625, reverette@fcgov.com
Topic: Landscape Plans
Comment Number: 6
Comment Originated: 02/01/2016
02/01/2016: The additional plantings and changes to the grading in the
detention pond look great. Thank you for making these updates. No additional
comments.
Department: Forestry
Contact: Tim Buchanan, 970-221-6361, tuchanan@fcqov.com
Topic: Landscape Plans
Comment Number: 4
Comment Originated: 12/31/2015
02/02/2016:
There appears to still be one tree on the east side of the building that is not
identified with a symbol.
12/31 /2015:
The Shade trees shown at some of the corners of the building with three
half-moon indentations on the perimeter of the symbol do not appear to be
identified in the plant list.
Department: Internal Services
Contact: Russell Hovland, 970-416-2341, rhovland@fcgov.com
Topic: Building Insp Plan Review
Comment Number: 1 Comment Originated: 12/28/2015
12/28/2015:
Building Permit Pre -Submittal Meeting:
Pre -Submittal meetings are required to assist the designer/builder by assuring,
early on in the design,
that the new commercial or multi -family projects are on track to complying with
all of the adopted City
codes and Standards listed below. The proposed project should be in the early
to mid -design stage for
this meeting to be effective and is typically scheduled after the Current Planning
conceptual review
meeting. Applicants of new commercial or multi -family projects are advised to
call 416-2341 to schedule
a pre -submittal meeting. Applicants should be prepared to present site plans,
floor plans, and elevations
and be able to discuss code issues of occupancy, square footage and type of
construction being proposed.
Construction shall comply with the following adopted codes as amended:
2012 International Building Code (IBC)
2012 International Residential Code (IRC)
3
Comment Number: 19
Comment Originated: 02/03/2016
02/03/2016: On the TBG site plan, please correct the reference to the maximum
allowable parking being 4.00 spaces per 1,000 square feet when it is 4.5 due to
the facility being considered a medical office building. Also, note that if there is
no parking allowed on Precision Drive, then a 20% bonus is allowed. The total
of 148 could then be increased to 177. The difference between the proposed
number of spaces (199) and the maximum allowed (177) is now reduced to 22.
Comment Number: 20 Comment Originated: 02/03/2016
02/03/2016: The comment response letter indicates that a Context Diagram
has been provided but this sheet is not included in the set delivered to the
Planning Department.
Comment Number: 21
Comment Originated: 02/03/2016
02/03/2016: On the Landscape Plan, there are two public street lights shown,
one along Ziegler and one along Precision. The spacing of the street trees is
such that there is 40 feet on either side of these street lights without a tree.
Please note that Light and Power allows Ornamental Trees to be placed to
within 15 feet of a street light so as to not create an 80-foot gap. Please add
two Ornamental Trees on either side of both street lights.
Comment Number: 22
Comment Originated: 02/03/2016
02/03/2016: The comment response letter indicates (number 5) that the
Wichita Blue Black Hills Spruce has been added but it is not included in the
Landscape Plan Schedule.
Department: Engineering Development Review
Contact: Marc Virata, 970-221-6567, mvirata@fcgov.com
Topic: General
Comment Number: 200
Comment Originated: 12/31/2015
02/05/2016: This appears to still be an issue when comparing to the plan that
Windsong is showing that goes to public hearing, but I'll presume will all be
coordinated at time of final plan.
12/31/2015: The plans don't seem to be coordinated with Windsong at Rock
Creek Drive in terms of how the north -south private drive is designed as this
project has it angled to the southeast, while Windsong appears to be aligned
directly north -south. The access easements depicted on the plats for the two
projects are also in different locations.
Comment Number: 205 Comment Originated: 12/31/2015
02/05/2016: The response is acknowledged. I would like to receive something
from MAVD acknowledging future development to the east is not able to utilize
the driveway from this development to Precision Drive as a shared access, and
acknowledges that the subdividing of the property will need to consider access
locations onto Precision Drive meeting City access spacing requirements. I can
reach out to MAVD on this if desired.
12/31/2015: The intent of the north -south driveway for Windsong at Rock Creek
south of the property, is to act as a driveway that can be shared between that
project and the undeveloped property to the east. This proposal has the
driveway access onto Precision Drive, close to the eastern boundary of its
property, yet does not provide access easement to the eastern boundary to
potentially allow for shared access to the undeveloped property to the east.
104
Fort Collins
Community Development and
Neighborhood Services
281 North College Avenue
PO Box 580
Fort Collins, CO 80522
970.221.6750
970.224.6134 - fax
lcgov. com/developmentreview
February 5, 2016
Cathy Mathis
TB Group
444 Mountain Ave
Berthoud, CO 80513
RE: Eye Center of Northern Colorado, PDP150029, Round Number 2
Please see the following summary of comments from City staff and outside reviewing
agencies for your submittal of the above referenced project. If you have questions about
any comments, you may contact the individual commenter or direct your questions through
the Project Planner, Ted Shepard, at 970-221-6343ortshepard@fcgov.com.
Comment Summary:
Department: Planning Services
Contact: Ted Shepard, 970-221-6343, tshepard@fcgov.com
Topic: General
Comment Number: 3.
Comment Originated: 12/30/2015
12/30/2015: (Carried Over) The site plan needs to call out and graphically
indicate the location and the dimensions of all Emergency Access Easements.
Comment Number: 4. Comment Originated: 12/30/2015
12/30/2015: (Carried Over) Either a Context Plan or an Enlarged Site Plan is
needed to show how the site (particularly the driveway location on Precision)
aligns with both Main Street Health and Wellness to the north Windsong at Rock
Creek to the south (particularly the new southwest E.A.E.).
Comment Number: 17 Comment Originated: 02/03/2016
02/03/2016: Please note that there are two site plans, one from TBG and one
from Marasco. Staff is assuming that the TBG site plan prevails and that the
Marasco site plan was included for informational purposes only and will not be a
part of the Final Plan submittal.
Comment Number: 18 Comment Originated: 02/03/2016
02/03/2016: On the TBG site plan, please add labeling for decorative screen
wall and the emergency access easement that is the north -south private drive
along the east side of the site.