HomeMy WebLinkAboutTOWNHOMES AT LIBRARY PARK - FDP - FDP140014 - CORRESPONDENCE - REVISIONS (4)The services will be placed in the public Utility Easement running
separate service. down the center of the project.
Comment Number: 5
Comment Originated: 05/27/2015
05/27/2015: The west side of Lot 10 will have to have a utility easement since
there is electrical feeding to the meter. This should be symmetrical to Lot 1
where there is a utility easement on the west side.
Comment Number: 6 Comment Originated: 05/27/2015
05/27/2015: The electrical line running south off of Lot 10 to the electric vault
'EV' does not exist and needs to be removed. This vault does not exist. The
service is being fed from a secondary box in the alley which is coming off of an
open delta bank transformer set located in Right of Way across the alley.
Comment Number: 7 This electric vault is proposed for this project and will need to be installed.
05/27/2015: Gas needs to maintain a minimum distance of 3 ft separation.
Right now the drawings only show 2 ft separation on the west side of the
buildings. The gas and electric are spaced at the minimum distance of 3 feet
Comment Number: 8 Comment Originated: 05/27/2015
05/27/2015: Before electrical design can be started, Light & Power will need
the following information. Acknowledged.
-Approved Plat
-Approved Site Plan
-Utility Plan
-Landscape Plan
-AutoCAD drawings of Utility & Site Plan
-Who the invoice will be billed to.
Department: Technical Services
Contact: Jeff County, 970-221-6588, Icounty(�fcQov.com
Topic: Plat
Comment Number: 15
Comment Originated: 06/02/2015
06/02/2015: Please make the changes to the Owner & Lienholder signature
blocks as marked. See redlines. Changes have made to these blocks.
Comment Number: 16 Comment Originated:
06/02/2015
06/02/2015: Please add new title commitment information if available.
A new title commitment will be updated prior to mylars.
Comment Number: 17 Comment Originated:
06/02/2015
06/02/2015: Please label the easement along the alley on Lot 1. Is this part of
the Private Access & Maintenance Easement? See redlines. These easement have been labeled.
Comment Number: 18 Comment Originated:
06/02/2015
06/02/2015: All easements must be labeled & locatable. See redlines.
See revised plans for easement callouts
Comment Number: 19 Comment Originated:
06/02/2015
06/02/2015: All reception numbers for documents recorded by separate
document must be added prior to mylars. Reception numbers will be added prior to mylars
Comment Number: 20
Comment Originated: 06/02/2015
06/02/2015: Please increase the text size of the easement dimensions. See
redlines. The text size has been increased.
3
06/11/2014: The placement of storm drain lines along Olive Street and
Mathews Street right-of-way appear to be private and if so would not be allowed
to be placed in right-of-way.
Comment Number: 9 Comment Originated: 06/11/2014
O8/13/2014: Will need to check with Martina.
O6/11/2014: I'll defer to Traffic Operations, but the placement of the
eastem-most diagonal (handicap) parking along Olive Street appears to be too
close to the crosswalk and would result in backup maneuvers onto the
crosswalk.
Comment Number: 13 Comment Originated: 06/02/2015
06/02/2015: There are discrepancies between the documents (civil, site and plat)
regarding the dedication of easement types within the platted boundary. The
plat shows a 20 foot private access & maintenance easement along the middle
of the property and a 5 foot private access easement along the northern
boundary. The civil plan call this out respectively as a 20 foot utility and private
access easement and a 5 foot utility and private access easement. The site
plan calls out a 20 foot private access and maintenance easement, but then
doesn't call out the 5 foot easement. Please look to have this coordinated. With
the civil plan calling out utility easement as one of the easement types, is this
intended to be a private utility easement, as this could otherwise be conveyed
on the plat itself. Overall, I'll be curious to see how these (presumably) private
easement are able to be 'conveyed' at this time as I didn't think easement can
be conveyed when the grantor and grantee are presumably the same entity.
The Plat has been revised and both civil and site plans
Topic: Plat have been adjusted to match the plat
Comment Number: 2
Comment Originated: 06/11/2014
06/02/2015: Seeing that the plat also calls out a 5 foot private access easement
by separate, we'll also need to track the providing of the recording/reception
number information prior to filing of the plat. In looking at this further, I think the
comment originally below of calling out the private access easement as an
exemption to easement dedicated to the City should just be removed at this
point since its dedication is occurring by separate document anyway. Otherwise
though, the dedication statement should perhaps be further revised to call out
the private access easement.
O8/13/2014: With the response indicating that it is to be recorded by separate
document, the plat should be providing recordation/reception number
information.
06/11/2014: The 20' "private access & maintenance easement" would need to
called out as an exemption to the certificate of dedication for easements
conveyed to the City. This would need to be a private easement not conveyed to
the City. The private easement will be recorded prior to mylar of the plat. They
have been removed from the exemptions portion of the text.
Department: Light And Power
Contact: Todd Vedder, 970-224-6152, tvedder@fcgov.com
Topic: General
Comment Number: 4
Comment Originated: 05/27/2015
05/27/2015: Since each town home is located on its own separate lot, there will
have to be a common easement provided in order to have all the meters gained
on one end of the building. Otherwise each town home will have to have its own
Fort Collins
Community Development and
Neighborhood Services
281 North College Avenue
PO Box 580
Fort Collins, CO 80522
970.221.6750
P/ NJ E
FJ 773 C- a n M EN i J
970.224,6134 - fax
fcgov.corn/developmentreview
July 02, 2015
Brad Florin ' 0
NOCO Townhomes, Inc. � � 1.7 Its'
P.O. Box 270070
Fort Collins, CO 80527
RE: Townhomes at Library Park - Final Plan, FDP140014, Round Number 3
Please see the following summary of comments from City staff and outside reviewing
agencies for your submittal of the above referenced project. If you have questions about
any comments, you may contact the individual commenter or direct your questions through
the Project Planner, Ted Shepard, at 970-221-6343ortshepard@fcgov.com.
Comment Summary:
Department: Engineering Development Review
Contact: Marc Virata, 970-221-6567, mvirata@fcgov.com
Topic: Construction Drawings
Comment Number: 14 Comment Originated: 06/02/2015
06/02/2015: Please add LCUASS detail 1601 to the details sheet. Note that
there has been an update to LCUASS construction details per the following link:
(http://Iarimer.org/engineering/G MARdStds/2014%2OChang es/Standard_Drawi
ngs.html). Details have been added
Topic: General
Comment Number: 7 Comment Originated: 06/11/2014
06/02/2015: I'd suggest adding the reception number to the documents with it
already having been recorded (civil and site plan). The Reception No. has been added.
08/13/2014: Wasn't this completed and recorded?
06/11/2014: There now needs to be an easement obtained from the property
owner to the north for the work occurring on their property depicted on the
landscape plan and grading sheet of the civil set.
Comment Number: 8 Comment Originated: 06/11/2014
06/02/2015: The response indicates a variance has been submitted, was this
provided? I'm not finding anything in the resubmittal.08/13/2014: Carried over
pending further review. A formal variance has not been submitted. An option
was agreed upon through exhibit. A formal variance will
be prepared and submitted.