HomeMy WebLinkAboutTOWNHOMES AT LIBRARY PARK - FDP - FDP140014 - CORRESPONDENCE - REVISIONS (5)Department: Zoning Contact: Peter Barnes, 970-416-2355, pbarnes(a)fcgov.com Topic: General Comment Number: 2 Comment Originated. 05/19/2014 05/19/2014. Need notes adding stating the mechanical units will be screened from view and that lighting will be shielded and down directional. Response: Noted. Topic: Site Plan Comment Number: 1 Comment Originated: 05/19/2014 05/19/2014: The 'proposed land use' in the Land Use Data table states that this is "multi -family residential However, the use is actually "attached single-family dwellings" and should be stated as such. Response: Revised Response: Redl,.. _., were received and all previous redlines si,..id be revised. Topic: Site Plan Comment Number: 10 06/09/2014: No comments. Department: Water Conservation Contact: Eric Olson, 970-221-6704, eolson fcgov.com Comment Originated: 06/09/2014 Topic: General Comment Number: 1. Comment Originated: 06/10/2014 06/10/2014: Irrigation plans are required no later than at the time of building permit. The irrigation plans must comply with the provisions outlined in Section 3.2.1(J) of the Land Use Code. Direct questions concerning irrigation requirements to Eric Olson, at 221-6704 or eolson(a fcgov.com Response: Acknowledged Department: Water -Wastewater Engineering Contact: Roger Buffington, 970-221-6854, rbuffington(a fcgov.com Topic: Construction Drawings Comment Number: 1 Comment Originated: 06/10/2014 06/10/2014: The water meters are in each unit; therefore, the meters adjacent to Mathews not needed. Response: The master meters have been removed. Comment Number: 2 Comment Originated: 06/10/2014 06/10/2014: Correct the discrepancies on the size of water service materials. Response:: The water sized discrepancy has been revised. Comment Number: 3 Comment Originated: 06/10/2014 06/10/2014: Show the sewer clean -outs on the lines extending to each unit. Since these are in hardscaped areas, label as traffic rated and include the traffic rated clean -out detail. Response: Sewer cleanouts have been added and labeled as traffic rated Comment Number: 4 Comment Originated: 06/10/2014 06/10/2014: Since the curb stops on the lines to the individual units will be in a traffic area, the curb stops will need to be placed in the top section of a valve box. We will come up with a detail for this installation. Response: This detail has been added Comment Number: 5 Comment Originated. 06/10/2014 06/10/2014: Add note (see redlines) indicating that the common private service lines (water and sewer) will be maintained by the H.O.A. Response: The note has been added to the Utility Plan. Topic: Plat Comment Number: 6 Comment Originated: 06/10/2014 06/10/2014: The curb stops on the service lines to the individual units must be within a utility easement. Response: A Utility Easement has been added to the plat. 06/12/2014: Some of the piping and inlet details need some clarification. Please call Wes Lamarque at 416-2418 for additional information. Response: Additional details have been added to the plans. Department: Technical Services Contact: Jeff County, 970.221-6588, Topic: Building Elevations Comment Number: 1 05/29/2014: No comments. Topic: Construction Drawings Comment Number: 2 jcountyt?a.fcgov.com Comment Originated: 05/29/2014 Comment Originated: 05/29/2014 05/29/2014: The City has moved to the NAVD 1988 vertical datum. Please state the project datum on sheets & , and provide an equation to get from NAVD88 to NGVD29 unadjusted, i.e. NAVD88 = NGVD29 Unadjusted + Response: Both datums have been added to the plans and the project datum has been specified. equation has been added Comment Number: 3 Comment Originated: 05/29/2014 05/29/2014: The benchmark shown is not the closest to the project. Response: The bench mark has been revised and a second bench mark has been added. Comment Number: 4 Comment Originated: 05/29/2014 05/29/2014: There are line over text issues. See redlines. Response: All line over text issues have been resolved Comment Number: 5 Comment Originated. 05/29/2014 05/29/2014: Please tie the coordinate values on sheet C2.00 to the property boundary. Response: Coordinates have been added to the property corners. Comment Number: 6 Comment Originated: 05/29/2014 05/29/2014: There are text over text issues. See redlines. Response: All text over text issues have been resolved Comment Number: 7 Comment Originated: 05/29/2014 05/29/2014. There is text that needs to be rotated 180 degrees. See redlines. Response: The text has been rotated 1800. Topic: Landscape Plans Comment Number: 8 Comment Originated: 05/29/2014 05/29/2014: There are line over text issues. See redlines. Response: BHA Topic: Plat Comment Number: 9 Comment Originated: 06/03/2014 06/03/2014: No changes were made from the previous reviews. Please make changes as previously marked. If changes are not made or you disagree with comments, please provide written response of why corrections were not made. A datum Topic: General Comment Number: 1 Comment Originated: 06/10/2014 06/10/2014: FIRE SPRINKLER SYSTEM The most recent plans for the site show all residential units at four stories. Due to the height of the north building and lack of aerial fire apparatus access, a full NFPA13 sprinkler system was discussed and required noted in the Conceptual Review meeting on August 9, 2013. See staff comment letter dated 9/23/13. Response: In a meeting between Ron Gonzales (Poudre Valley Fire Department), Mike Crane (Western States Fire) and KEPHART on 6/12/14 and a subsequent meeting with Russ Hovland (Ft. Collins Building Department) it has been decided by all parties that the project will be designed to a Full NFPA 13 sprinkler system throughout (on both units designed under the 2012 IBC and 2012 IRC codes) to respond to the Fire Department's concern of access to the North building. It was also decided there is no need for a standpipe and pump on the project. Russ Hovland also indicated that after August 1, Fort Collins is requiring NFPA 13 systems on all projects, and this project will be designed to meet this new requirement. Department: Stormwater Engineering Contact: Jesse Schlam, 970-218-2932, ischlam@fcgov.com Topic: Erosion Control Comment Number: 1 Comment Originated: 06/11/2014 06/11/2014. The site disturbs more than 10,000 sq-ft Erosion Control Materials Submitted dose not meet requirements. Please submit; Corrections to Erosion Control Plan, Erosion Control Report, and an Escrow / Security Calculation. If you need clarification concerning this section, or if there are any questions please contact Jesse Schlam 970-218-2932 or email @ ischlam fcgov.com Response: An erosion control report and plan has been included within the set. Contact: Wes Lamarque, 970-416-2418, wlamargue(a fcgov.com Topic: General Comment Number: 2 Comment Originated: 06/11/2014 06/11/2014: Please add a drainage easement where the porous pavers are located. Response: A drainage easement has been added to the plans and plat. Comment Number: 3 Comment Originated: 06/11/2014 06/11/2014: Please include the Drainage Plan in the Utility Plan set. Response. A drainage plan has been prepared and included within the set. Comment Number: 4 Comment Originated: 06/12/2014 06/12/2014: The spillway appears to be higher than the far east two F.F. elevations. Please revise. Response: The spillway is 0.5' below the finish floor elevation and has been sized to pass 133 percent of the 100-year storm. Comment Number: 5 Comment Originated: 06/12/2014 06/12/2014: Coordination needs to take place with the storm sewer in the right-of-way. Response: An encroachment permit will be required and is in the process with the Engineering Department. Comment Number: 6 Comment Originated: 06/12/2014 particular water and sewer lines. ' Response: The waterline services have been shift to the north to avoid installation within the drip line. Comment Number: 6 06/11 /2014: Comment Originated: 06/11 /2014 Along Mathews is it possible to add an additional street tree between the north exiting Siberian Elm and the proposed new Honey Locust tree? Please add if feasible. Response: Added Comment Number: 7 06/11 /2014: 01 /22/2014: Comment Originated: 06/11/2014 Provide a tree inventory and evaluation of all trees on site including the large off -site maple located at the north east corner of the project. The inventory should number all existing trees. Information on each tree should include species, size, condition, intent to retain or remove and mitigation. This information should be provided in a table on the landscape plan. Contact the City Forester for an on -site meeting to obtain information for the tree inventory and evaluation. Response: A meeting was held on -site with the City Forester to evaluate existing tree conditions and the number of trees required for mitigation (3). All four trees on the planting plan meet the mitigation tree requirements, exceeding the mitigation requirements for the project. Department: Light And Power Contact: Doug Martine, 970-224-6152, dmartine cDfcgov.com Topic: General Comment Number: 1 Comment Originated: 05/19/2014 05/19/2014: The electric transformer shown on the utility plan will be in a sub -surface electric vault. This arrangement will be possible only on the following conditions: • Maximum of 5 dwelling units in each building (10 total units). " No use of electric space heating, and each meter to not exceed 150 amps. • No three-phase power required. Response: Per our email correspondence, the use of a sub -surface electric vault will suffice for the needs of this project. Comment Number: 2 Comment Originated: 05/19/2014 05/19/2014: Electric meters must be 'ganged' together outdoors on the west side of each building. Response: Acknowledged. Comment Number: 3 Comment Originated: 05/19/2014 05/19/2014: In order to finalize the electric utility plan, Light & Power Engineering (970-221-6700) will need: • A paper or pdf of the signed and recorded subdivision plat. • An AutoCad (v.2008) drawing of the final utility plan sent to Terry Cox at TCOX@FCGOV.COM. • The name & address of who to invoice for the electric development charges. . The name Response: Upon approval, CAD files will be sent to Terry Cox. Department: PFA Contact: Jim Lynxwiler, 970-416-2869, jlynxwiler(cDpoudre-fire.org discing or other a_ cible method, at a rate of at least three (3) (.,,,rc yards of soil amendment per one thousand (1,000) square feet of landscape area. 2.A permit must be obtained from the City forester before any trees or shrubs as noted on this plan are planted. pruned or removed on the public right-of-way. This includes zones between the sidewalk and curb, medians and other city property. This permit shall approve the location and species to be planted. Failure to obtain this permit may result in replacing or relocating trees and a hold on certificate of occupancy. 3.Contact the City Forester to inspect all street tree plantings at the completion of each phase of the development. All trees need to have been installed as shown on the landscape plan. Approval of street tree planting is required before final approval of each phase. 4.Minor changes in street tree species and locations may be made during construction as required by site conditions or availability of material. Overall quality and design concept shall be consistent with approved landscape plans. Any changes will be provided to the Landscape Architect for review and approval as well as the City of Fort Collins. 5.Street Trees shall be supplied and planted by the developer using a qualified landscape contractor. 6.The Developer shall replace dead or dying street trees after planting until final maintenance inspection and acceptance by the City of Fort Collins Forestry Division. All street trees in the project must be established, of an approved species and of acceptable condition prior to acceptance. 7.AII tree pruning and removal shall be performed by a tree service business that holds a current City of fort Collins arborist license as required by code. 8.Tree Utility separations: Forty feet between shade trees and streetlight. Fifteen feet between ornamental trees and streetlights Twenty feet between shade and /or ornamental trees and traffic control signs and devices Ten feet between trees and water or sewer mains Six feet between trees and water or sewer service lines our feet between trees and gas lines Eight feet between trees and driveways or alleys Response. Revised Comment Number: 4 Comment Originated: 06/11/2014 06/11/2014: 01 /22/2014: Off -site tree removal permission continued previous comment: Prior to final plan approval written permission by the property owner to the north to remove the large maple tree located off -site must be provided to the City Project Planner. Permission should be granted to the developer of the project. Approved plans can not authorize removal of this tree without written approval of the property owner where the tree is located. Response: Written agreement will be provided prior to final plan approval. Comment Number: 5 Comment Originated: 06/11/2014 06/11/2014: Confirm that there will not be any utility excavation associated with project within the drip line of the four existing Siberian Elms in the Parkway. 01 /22/2014: Design any new underground utility locations to stay out from the drip line of the 4 mature Siberian Elms to retain in the parkway. Check all new utility locations to protect these 4 trees in 06/11/2014: The placement of storm drain lines along Olive Street and Mathews Street right-of-way appear to be private and if so would not be allowed to be placed in right-of-way. Response: We are in the process of obtaining an encroachment permit through your office Comment Number: 9 Comment Originated: 06/11/2014 06/11/2014: I'll defer to Traffic Operations, but the placement of the easternmost diagonal (handicap) parking along Olive Street appears to be too close to the crosswalk and would result in backup maneuvers onto the crosswalk. Response: No comments from Traffic Operations at this point Topic: Plat Comment Number: 2 Comment Originated: 06/11/2014 06/11/2014: The 20"'private access & maintenance easement" would need to called out as an exemption to the certificate of dedication for easements conveyed to the City. This would need to be a private easement not conveyed to the City. Response: Easement is called out to be dedicated by separate documents. This easement will be recorded prior to recording of the plat. Department: Forestry Contact: Tim Buchanan, 970-221-6361, tbuchanan(cDfcgov.com Topic: Landscape Plans Comment Number: 1 06/11/2014: Comment Originated: 06/11/2014 Please change the two Sensation Boxelders used as street trees to a species found on the street tree list. Shumard Oak is recommended for these two trees. Response: Revised Comment Number: 2 06/11/2014: Comment Originated: 06/11/2014 Include all the seven tree protection specifications in LUC 3.2.1 G including the table associated with specification number 7. Current tree protection notes 2, 3, 1, 12, and 13 appear to be associated with another project so please remove from the list of specifications. Response: Revised Comment Number: 3 06/11/2014: Plant notes: Comment Originated: 06/11/2014 Please edit note number 5 to say street trees to be maintained by the City of Fort Collins after approval and establishment. Add six feet between water and sewer service lines to note number 6. Add a sentence to the end of note number 11 that says in effect that cultivation will not occur within the drip line of any existing tree. 01/22/2014: Incorporate the following notes if not already added. As final plans are developed please include these Landscape notes and other standard landscape notes that can be obtained from the project planner. 1.The soil in all landscape areas, including parkways and medians, shall be thoroughly loosened to a depth of not less than eight (8) inches and soil amendment shall be thoroughly incorporated into the soil of all landscape areas to a depth of at least six (6) inches by tilling, Topic: Construction [,,..wings Comment Number: 4 Comment Originated: 06/11/2014 06/11/2014: The cross-section sheet on the civil plan needs to show the cross -slope for the full -width of Olive Street to understand how the establishment of new curb and gutter on the north side will achieve intended cross -slopes for the full width of Olive Street in the future. Response: The cross -sections have been revised to include the southern half of Olive Street. Comment Number: 5 Comment Originated: 06/11/2014 06/11/2014: Please ensure the plan sheets depict the widening of the sidewalk on either side of the metal culvert as illustrated on the detail. Response: The widening of the sidewalk has been revised to better depict the detail included within the plans Comment Number: 10 Comment Originated: 06/11/2014 06/11/2014: The plans need to specify the installation of LCUASS standard truncated dome access ramps across Olive and Mathews. Response: The installation of the truncated domes is shown on the Horizontal Control Plan. LCUASS standard truncated domes have been included within the details. Comment Number: 11 Comment Originated: 06/11/2014 06/11/2014: The interface of the permeable system at the Olive Street right-of-way will need additional detail and review. Response: A concrete cutoff wall has been added to the plan along with a detail. Topic: General Comment Number: 1 Comment Originated: 06/11/2014 06/11/2014: The plans show an electric transformer in the right-of-way between the sidewalk and curb along Olive Street that's shown as below grade. Heads -up that if this were to be above grade this would not be allowed and would need to be below grade, or relocated. Response: Through email correspondence between the Owner and Light & Power, a sub -surface electric vault with suffice for this project. Comment Number: 3 Comment Originated: 06/11/2014 06/11/2014: The specified gate for fire access off of Mathews Street would need to indicate that it swings into the property and not out into right-of-way. Response: A note has been added to the Utility Plans. The fence style will match the metal fence at the adjacent Park View Apartments, and has been indicated on the site plan. Comment Number: 6 Comment Originated: 06/11/2014 06/11/2014: The proposed bike racks in Olive Street parking shown on the plans need to be removed as they're encroachments in public right-of-way and can't be used to meet (or imply to meet) a bike parking requirement. This can potentially be permitted via an encroachment permit process coordinated with Engineering Inspection and Parking Services. Response: The bike racks have been removed from the plans. Comment Number: 7 Comment Originated: 06/11/2014 06/11/2014: There now needs to be an easement obtained from the property owner to the north for the work occurring on their property depicted on the landscape plan and grading sheet of the civil set. Response: An easement for work within the northern property will be recorded with the County prior to the recording of this plat. Comment Number: 8 Comment Originated: 06/11/2014 Comment NumbG,: 15 �,jmment Originated: 06/10/2014 06/10/2014: Please provide a rendered perspective so that we can make sure that the building continues to be as articulated as indicated at the P.D.P. Response: KEPHART, Owner and Ted Shepard had a meeting 7/23/2014 to discuss changes to the exterior elevations. KEPHART provided the Planning Services with 11x17 colored renderings of the most current and up-to-date elevations. Ted Shepard indicated that these renderings satisfied his questions and he was OK with the elevation style and articulation that is currently shown. An additional 11x17 set of renderings, provided during the meeting, will accompany this resubmittal. mment Number: 16 Comment Originated: 06/11/2014 06/10/2014: Please add a standard General Note that all lighting shall be fully shielded and down -directional. Response: Noted. Comment Number: 17 Comment Originated: 06/11/2014 06/11/2014. Please return all redlines. Response: Acknowledged Topic: Landscape Plans Comment Number: 10 Comment Originated: 06/10/2014 06/10/2014. The mulch beds in the parkways will have foot traffic as people parking along the street will traverse the parkways to get to the sidewalk. Be sure to specify a mulch product that will not break down easily and applied to a sufficient depth to withstand foot traffic. The soil should be amended to ensure that the trees receive moisture. Please add a note to the Landscape Plan indicating the purpose, function and design of the two mulch beds. Response: The parkway mulch beds are being used to best protect the existing tree in the parkway at the direction of the City Forester. Similar treatments have been used at the nearby Library project, so we are designing these to match a similar neighborhood character. The mulch has been indicated on the plans as 4" depth wood mulch. This increased depth will help with foot traffic, and we have provided stepping stones in locations immediately adjacent to building doors that would most likely be used for cut -through paths. Soil amendment notes are included on the plans. Comment Number: 11 Comment Originated: 06/10/2014 06/10/2014: Along both frontages, there seems to be a deliberate attempt to not plant shrubs over the storm sewer line. While trees are discouraged over storm sewers, shrubs present no such similar issues. Please consider spreading the shrubs out accordingly to take full advantage of the width that is available. Perhaps by doing so, additional plant material can be added. Response: The plants are being held away from the building foundation based on the recommendations from the soils report, not to avoid the storm sewer lines. The locations of the plants provide a simple but ornamental 'front yard' landscape treatment in this narrow area, but using low-water, drip -irrigated plantings set as far from the foundation as possible. Comment Number: 12 Comment Originated: 06/10/2014 06/10/2014: Of the 34 Deciduous Shrubs, 28 are a variety of Spirea. It seems the plant palette could be expanded to create more interest and variety. Response: Revised. Department: Engineering Development Review Contact: Marc Virata, 970-221-6567, mvirata(a.fcgov.com Topic: General Comment Number: 1 Comment Originated: 06/10/2014 06/10/2014: On the plat, please consider adding the sub -title: "Being a replat of Lots 1 and 2 of Block 132 of the City of Fort Collins." Response: The sub- title has been revised. Comment Number: 2 Comment Originated: 06/10/2014 06/10/2014. On the plat, do you want to note that the existing lot line is to be vacated by this plat? Also, do you want to make a note of the off -site easement that will be granted for the benefit of this project? Finally, please note that Lot 2 is mislabled as Lot 22. Response: Lot 2 has been relabeled. Comment Number: 3 Comment Originated: 06/10/2014 06/10/2014: On the Site Plan, please indicate that the off -site easement along the north property line is intended for the use and enjoyment of the residents and please state what long term maintenance agreement is between the grantor and the grantee. Response: The site plan has been revised to indicate this language. The common area maintenance will be governed by the HOA; specific language regarding the maintenance of the easement is being drafted and reviewed by both parties. Comment Number: 4 Comment Originated: 06/10/2014 06/10/2014: On the Site Plan, please clarify the details of the six-foot high metal pickett fence, with gate, for fire access. Is this gate intended to accommodate fire equipment such as fire trucks or simply a person access gate? Be sure to specify that the fence ends at the buildings. Response: A 'person -gate' is indicated in the 6' ht fence to allow fire access from the east. Comment Number: 5 Comment Originated: 06/10/2014 06/10/2014. On the Site Plan, please add a note that trash and recycling shall be by individual unit owner and that there will be on centralized or common containers. Response: This note has been added to the site plan. Comment Number: 6 Comment Originated: 06/10/2014 06/10/2014: On the Site and Landscape Plans, please indicate the location of the outdoor condensing units for each unit. If these are to be roof -mounted, please state in a general note. Response: A note has been added indicating the roof -mounted units. Comment Number: 7 Comment Originated: 06/10/2014 06/10/2014: There may be an issue with locating the electrical transformer within the public right-of-way. If not so allowed, could it be shifted to the north and placed within the off -site easement? of electric service will only require the use of a sub -surface electric vault, which is ved within the public 'ght-of-way. iment Number: 8 Comment Originated: 06/10/2014 0/2014: Please ise the Land Use Data table to indicate that these units are defined by 1:4, Land Used as "Single Family Attached Dwellings." Note that the Code does not recognize the term "Townhome." Since the use was granted per the Addition of a Permitted Use by the P & Z Board, the proper terms must be used. Response: Revised Comment Number: 9 Comment Originated: 06/10/2014 06/10/2014: Please remove the topographical contour lines from the Site Plan. Response. Revised. F6rt Collins Community Development and Neighborhood Services 281 North College Avenue PO Box 580 Fort Collins. CO 80522 970.221.6750 970.224 6134 -fax fcgov com/developmentreview June 13, 2014 Responses July 23, 2014 Brad Florin NOCO Townhomes, Inc. P.O. Box 270070 Fort Collins, CO 80527 RE: Townhomes at Library Park PDP with Addition of a Permitted Use, FDP140014, Round Number 1 Please see the following summary of comments from City staff and outside reviewing agencies for your submittal of the above referenced project. If you have questions about any comments, you may contact the individual commenter or direct your questions through the Project Planner, Ted Shepard, at 970-221-6343 or tshepard@fcgov.com. Comment Summa Department: Planning Services Contact: Ted Shepard, 970-221-6343, tshepard(cDfcgov.com Topic: Building Elevations Comment Number: 13 Comment Originated: 06/10/2014 06/10/2014: In general, the elevations have been revised since the P.D.P. I suggest we meet to go over the changes in detail Response: KEPHART, Owner and Ted Shepard had a meeting 7/23/2014 to discuss changes to the exterior elevations. KEPHART provided the Planning Services with 11 x17 colored renderings of the most current and up-to-date elevations. Ted Shepard indicated that these renderings satisfied his questions and he was OK with the elevation style and articulation that is currently shown. Comment Number: 14 Comment Originated: 06/10/2014 06/10/2014: Be sure to call out the extent of the standing seam metal roof. There are areas of the roof that are not labeled. Also, be sure to indicate the color. The same comment applies to the base masonry. This material needs to be further specified with greater detail, including color. Response: Standing seam metal roof locations and color has been indicated on the Architectural Elevation sheets. More detailed information concerning the building's base masonry has been indicated on elevations. Further, Sherwin Williams colors have been selected and indicated at all Stucco locations.