Comment Number: 2 Comment Originated. 05/19/2014
05/19/2014. Need notes adding stating the mechanical units will be screened from view and
that lighting will be shielded and down directional.
Response: Noted.
Topic: Site Plan
Comment Number: 1 Comment Originated: 05/19/2014
05/19/2014: The 'proposed land use' in the Land Use Data table states that this is "multi -family
residential However, the use is actually "attached single-family dwellings" and should be
stated as such.
Response: Revised
Response: Redl,.. _., were received and all previous redlines si,..id be revised.
Topic: Site Plan
Comment Number: 10
06/09/2014: No comments.
Department: Water Conservation
Contact: Eric Olson, 970-221-6704, eolson fcgov.com
Comment Originated: 06/09/2014
Topic: General
Comment Number: 1. Comment Originated: 06/10/2014
06/10/2014: Irrigation plans are required no later than at the time of building permit. The
irrigation plans must comply with the provisions outlined in Section 3.2.1(J) of the Land Use
Code. Direct questions concerning irrigation requirements to Eric Olson, at 221-6704 or
eolson(a fcgov.com
Response: Acknowledged
Department: Water -Wastewater Engineering
Contact: Roger Buffington, 970-221-6854, rbuffington(a fcgov.com
Topic: Construction Drawings
Comment Number: 1 Comment Originated: 06/10/2014
06/10/2014: The water meters are in each unit; therefore, the meters adjacent to Mathews not
needed.
Response: The master meters have been removed.
Comment Number: 2 Comment Originated: 06/10/2014
06/10/2014: Correct the discrepancies on the size of water service materials.
Response:: The water sized discrepancy has been revised.
Comment Number: 3 Comment Originated: 06/10/2014
06/10/2014: Show the sewer clean -outs on the lines extending to each unit. Since these are in
hardscaped areas, label as traffic rated and include the traffic rated clean -out detail.
Response: Sewer cleanouts have been added and labeled as traffic rated
Comment Number: 4 Comment Originated: 06/10/2014
06/10/2014: Since the curb stops on the lines to the individual units will be in a traffic area, the
curb stops will need to be placed in the top section of a valve box. We will come up with a
detail for this installation.
Response: This detail has been added
Comment Number: 5 Comment Originated. 06/10/2014
06/10/2014: Add note (see redlines) indicating that the common private service lines (water
and sewer) will be maintained by the H.O.A.
Response: The note has been added to the Utility Plan.
Topic: Plat
Comment Number: 6 Comment Originated: 06/10/2014
06/10/2014: The curb stops on the service lines to the individual units must be within a utility
easement.
Response: A Utility Easement has been added to the plat.
06/12/2014: Some of the piping and inlet details need some clarification. Please call Wes
Lamarque at 416-2418 for additional information.
Response: Additional details have been added to the plans.
Department: Technical Services
Contact: Jeff County, 970.221-6588,
Topic: Building Elevations
Comment Number: 1
05/29/2014: No comments.
Topic: Construction Drawings
Comment Number: 2
jcountyt?a.fcgov.com
Comment Originated: 05/29/2014
Comment Originated: 05/29/2014
05/29/2014: The City has moved to the NAVD 1988 vertical datum. Please state the project
datum on sheets & , and provide an equation to get from NAVD88 to NGVD29 unadjusted, i.e.
NAVD88 = NGVD29 Unadjusted +
Response: Both datums have been added to the plans and the project datum has been specified.
equation has been added
Comment Number: 3 Comment Originated: 05/29/2014
05/29/2014: The benchmark shown is not the closest to the project.
Response: The bench mark has been revised and a second bench mark has been added.
Comment Number: 4 Comment Originated: 05/29/2014
05/29/2014: There are line over text issues. See redlines.
Response: All line over text issues have been resolved
Comment Number: 5 Comment Originated. 05/29/2014
05/29/2014: Please tie the coordinate values on sheet C2.00 to the property boundary.
Response: Coordinates have been added to the property corners.
Comment Number: 6 Comment Originated: 05/29/2014
05/29/2014: There are text over text issues. See redlines.
Response: All text over text issues have been resolved
Comment Number: 7 Comment Originated: 05/29/2014
05/29/2014. There is text that needs to be rotated 180 degrees. See redlines.
Response: The text has been rotated 1800.
Topic: Landscape Plans
Comment Number: 8 Comment Originated: 05/29/2014
05/29/2014: There are line over text issues. See redlines.
Response: BHA
Topic: Plat
Comment Number: 9 Comment Originated: 06/03/2014
06/03/2014: No changes were made from the previous reviews. Please make changes as
previously marked. If changes are not made or you disagree with comments, please provide
written response of why corrections were not made.
A datum
Topic: General
Comment Number: 1 Comment Originated: 06/10/2014
06/10/2014: FIRE SPRINKLER SYSTEM
The most recent plans for the site show all residential units at four stories. Due to the height of
the north building and lack of aerial fire apparatus access, a full NFPA13 sprinkler system was
discussed and required noted in the Conceptual Review meeting on August 9, 2013. See staff
comment letter dated 9/23/13.
Response: In a meeting between Ron Gonzales (Poudre Valley Fire Department), Mike Crane (Western
States Fire) and KEPHART on 6/12/14 and a subsequent meeting with Russ Hovland (Ft. Collins Building
Department) it has been decided by all parties that the project will be designed to a Full NFPA 13 sprinkler
system throughout (on both units designed under the 2012 IBC and 2012 IRC codes) to respond to the Fire
Department's concern of access to the North building. It was also decided there is no need for a standpipe
and pump on the project. Russ Hovland also indicated that after August 1, Fort Collins is requiring NFPA 13
systems on all projects, and this project will be designed to meet this new requirement.
Department: Stormwater Engineering
Contact: Jesse Schlam, 970-218-2932, ischlam@fcgov.com
Topic: Erosion Control
Comment Number: 1
Comment Originated: 06/11/2014
06/11/2014. The site disturbs more than 10,000 sq-ft Erosion Control Materials Submitted dose
not meet requirements. Please submit; Corrections to Erosion Control Plan, Erosion Control
Report, and an Escrow / Security Calculation. If you need clarification concerning this section,
or if there are any questions please contact Jesse Schlam 970-218-2932 or email @
ischlam fcgov.com
Response: An erosion control report and plan has been included within the set.
Contact: Wes Lamarque, 970-416-2418, wlamargue(a fcgov.com
Topic: General
Comment Number: 2 Comment Originated: 06/11/2014
06/11/2014: Please add a drainage easement where the porous pavers are located.
Response: A drainage easement has been added to the plans and plat.
Comment Number: 3 Comment Originated: 06/11/2014
06/11/2014: Please include the Drainage Plan in the Utility Plan set.
Response. A drainage plan has been prepared and included within the set.
Comment Number: 4 Comment Originated: 06/12/2014
06/12/2014: The spillway appears to be higher than the far east two F.F. elevations. Please
revise.
Response: The spillway is 0.5' below the finish floor elevation and has been sized to pass 133 percent of the
100-year storm.
Comment Number: 5 Comment Originated: 06/12/2014
06/12/2014: Coordination needs to take place with the storm sewer in the right-of-way.
Response: An encroachment permit will be required and is in the process with the Engineering Department.
Comment Number: 6 Comment Originated: 06/12/2014
particular water and sewer lines. '
Response: The waterline services have been shift to the north to avoid installation within the drip line.
Comment Number: 6
06/11 /2014:
Comment Originated: 06/11 /2014
Along Mathews is it possible to add an additional street tree between the north exiting Siberian
Elm and the proposed new Honey Locust tree? Please add if feasible.
Response: Added
Comment Number: 7
06/11 /2014:
01 /22/2014:
Comment Originated: 06/11/2014
Provide a tree inventory and evaluation of all trees on site including the large off -site maple
located at the north east corner of the project. The inventory should number all existing trees.
Information on each tree should include species, size, condition, intent to retain or remove and
mitigation. This information should be provided in a table on the landscape plan. Contact the
City Forester for an on -site meeting to obtain information for the tree inventory and evaluation.
Response: A meeting was held on -site with the City Forester to evaluate existing tree conditions and the
number of trees required for mitigation (3). All four trees on the planting plan meet the mitigation tree
requirements, exceeding the mitigation requirements for the project.
Department: Light And Power
Contact: Doug Martine, 970-224-6152, dmartine cDfcgov.com
Topic: General
Comment Number: 1 Comment Originated: 05/19/2014
05/19/2014: The electric transformer shown on the utility plan will be in a sub -surface electric
vault. This arrangement will be possible only on the following conditions:
• Maximum of 5 dwelling units in each building (10 total units).
" No use of electric space heating, and each meter to not exceed 150 amps.
• No three-phase power required.
Response: Per our email correspondence, the use of a sub -surface electric vault will suffice for the needs of
this project.
Comment Number: 2 Comment Originated: 05/19/2014
05/19/2014: Electric meters must be 'ganged' together outdoors on the west side of each
building.
Response: Acknowledged.
Comment Number: 3
Comment Originated: 05/19/2014
05/19/2014: In order to finalize the electric utility plan, Light & Power Engineering
(970-221-6700) will need:
• A paper or pdf of the signed and recorded subdivision plat.
• An AutoCad (v.2008) drawing of the final utility plan sent to Terry Cox at TCOX@FCGOV.COM.
• The name & address of who to invoice for the electric development charges.
. The name
Response: Upon approval, CAD files will be sent to Terry Cox.
Department: PFA
Contact: Jim Lynxwiler, 970-416-2869, jlynxwiler(cDpoudre-fire.org
discing or other a_ cible method, at a rate of at least three (3) (.,,,rc yards of soil amendment
per one thousand (1,000) square feet of landscape area.
2.A permit must be obtained from the City forester before any trees or shrubs as noted on this
plan are planted. pruned or removed on the public right-of-way. This includes zones between
the sidewalk and curb, medians and other city property. This permit shall approve the location
and species to be planted. Failure to obtain this permit may result in replacing or relocating
trees and a hold on certificate of occupancy.
3.Contact the City Forester to inspect all street tree plantings at the completion of each phase of
the development. All trees need to have been installed as shown on the landscape plan.
Approval of street tree planting is required before final approval of each phase.
4.Minor changes in street tree species and locations may be made during construction as
required by site conditions or availability of material. Overall quality and design concept shall
be consistent with approved landscape plans. Any changes will be provided to the Landscape
Architect for review and approval as well as the City of Fort Collins.
5.Street Trees shall be supplied and planted by the developer using a qualified landscape
contractor.
6.The Developer shall replace dead or dying street trees after planting until final maintenance
inspection and acceptance by the City of Fort Collins Forestry Division. All street trees in the
project must be established, of an approved species and of acceptable condition prior to
acceptance.
7.AII tree pruning and removal shall be performed by a tree service business that holds a
current City of fort Collins arborist license as required by code.
8.Tree Utility separations:
Forty feet between shade trees and streetlight. Fifteen feet between ornamental trees and
streetlights
Twenty feet between shade and /or ornamental trees and traffic control signs and devices
Ten feet between trees and water or sewer mains
Six feet between trees and water or sewer service lines
our feet between trees and gas lines
Eight feet between trees and driveways or alleys
Response. Revised
Comment Number: 4 Comment Originated: 06/11/2014
06/11/2014:
01 /22/2014:
Off -site tree removal permission continued previous comment:
Prior to final plan approval written permission by the property owner to the north to remove the
large maple tree located off -site must be provided to the City Project Planner. Permission
should be granted to the developer of the project. Approved plans can not authorize removal
of this tree without written approval of the property owner where the tree is located.
Response: Written agreement will be provided prior to final plan approval.
Comment Number: 5
Comment Originated: 06/11/2014
06/11/2014:
Confirm that there will not be any utility excavation associated with project within the drip line of
the four existing Siberian Elms in the Parkway.
01 /22/2014:
Design any new underground utility locations to stay out from the drip line of the 4 mature
Siberian Elms to retain in the parkway. Check all new utility locations to protect these 4 trees in
06/11/2014: The placement of storm drain lines along Olive Street and Mathews Street
right-of-way appear to be private and if so would not be allowed to be placed in right-of-way.
Response: We are in the process of obtaining an encroachment permit through your office
Comment Number: 9
Comment Originated: 06/11/2014
06/11/2014: I'll defer to Traffic Operations, but the placement of the easternmost diagonal
(handicap) parking along Olive Street appears to be too close to the crosswalk and would
result in backup maneuvers onto the crosswalk.
Response: No comments from Traffic Operations at this point
Topic: Plat
Comment Number: 2
Comment Originated: 06/11/2014
06/11/2014: The 20"'private access & maintenance easement" would need to called out as an
exemption to the certificate of dedication for easements conveyed to the City. This would need
to be a private easement not conveyed to the City.
Response: Easement is called out to be dedicated by separate documents. This easement will be recorded
prior to recording of the plat.
Department: Forestry
Contact: Tim Buchanan, 970-221-6361, tbuchanan(cDfcgov.com
Topic: Landscape Plans
Comment Number: 1
06/11/2014:
Comment Originated: 06/11/2014
Please change the two Sensation Boxelders used as street trees to a species found on the
street tree list. Shumard Oak is recommended for these two trees.
Response: Revised
Comment Number: 2
06/11/2014:
Comment Originated: 06/11/2014
Include all the seven tree protection specifications in LUC 3.2.1 G including the table
associated with specification number 7. Current tree protection notes 2, 3, 1, 12, and 13 appear
to be associated with another project so please remove from the list of specifications.
Response: Revised
Comment Number: 3
06/11/2014:
Plant notes:
Comment Originated: 06/11/2014
Please edit note number 5 to say street trees to be maintained by the City of Fort Collins after
approval and establishment.
Add six feet between water and sewer service lines to note number 6.
Add a sentence to the end of note number 11 that says in effect that cultivation will not occur
within the drip line of any existing tree.
01/22/2014: Incorporate the following notes if not already added.
As final plans are developed please include these Landscape notes and other standard
landscape notes that can be obtained from the project planner.
1.The soil in all landscape areas, including parkways and medians, shall be thoroughly
loosened to a depth of not less than eight (8) inches and soil amendment shall be thoroughly
incorporated into the soil of all landscape areas to a depth of at least six (6) inches by tilling,
Topic: Construction [,,..wings
Comment Number: 4
Comment Originated: 06/11/2014
06/11/2014: The cross-section sheet on the civil plan needs to show the cross -slope for the
full -width of Olive Street to understand how the establishment of new curb and gutter on the
north side will achieve intended cross -slopes for the full width of Olive Street in the future.
Response: The cross -sections have been revised to include the southern half of Olive Street.
Comment Number: 5
Comment Originated: 06/11/2014
06/11/2014: Please ensure the plan sheets depict the widening of the sidewalk on either side
of the metal culvert as illustrated on the detail.
Response: The widening of the sidewalk has been revised to better depict the detail included within
the plans
Comment Number: 10
Comment Originated: 06/11/2014
06/11/2014: The plans need to specify the installation of LCUASS standard truncated dome
access ramps across Olive and Mathews.
Response: The installation of the truncated domes is shown on the Horizontal Control Plan. LCUASS
standard truncated domes have been included within the details.
Comment Number: 11 Comment Originated: 06/11/2014
06/11/2014: The interface of the permeable system at the Olive Street right-of-way will need
additional detail and review.
Response: A concrete cutoff wall has been added to the plan along with a detail.
Topic: General
Comment Number: 1 Comment Originated: 06/11/2014
06/11/2014: The plans show an electric transformer in the right-of-way between the sidewalk
and curb along Olive Street that's shown as below grade. Heads -up that if this were to be
above grade this would not be allowed and would need to be below grade, or relocated.
Response: Through email correspondence between the Owner and Light & Power, a sub -surface electric
vault with suffice for this project.
Comment Number: 3 Comment Originated: 06/11/2014
06/11/2014: The specified gate for fire access off of Mathews Street would need to indicate that
it swings into the property and not out into right-of-way.
Response: A note has been added to the Utility Plans. The fence style will match the metal fence at the
adjacent Park View Apartments, and has been indicated on the site plan.
Comment Number: 6
Comment Originated: 06/11/2014
06/11/2014: The proposed bike racks in Olive Street parking shown on the plans need to be
removed as they're encroachments in public right-of-way and can't be used to meet (or imply to
meet) a bike parking requirement. This can potentially be permitted via an encroachment permit
process coordinated with Engineering Inspection and Parking Services.
Response: The bike racks have been removed from the plans.
Comment Number: 7
Comment Originated: 06/11/2014
06/11/2014: There now needs to be an easement obtained from the property owner to the north
for the work occurring on their property depicted on the landscape plan and grading sheet of
the civil set.
Response: An easement for work within the northern property will be recorded with the County prior to the
recording of this plat.
Comment Number: 8 Comment Originated: 06/11/2014
Comment NumbG,: 15 �,jmment Originated: 06/10/2014
06/10/2014: Please provide a rendered perspective so that we can make sure that the building
continues to be as articulated as indicated at the P.D.P.
Response: KEPHART, Owner and Ted Shepard had a meeting 7/23/2014 to discuss changes to the exterior
elevations. KEPHART provided the Planning Services with 11x17 colored renderings of the most current and
up-to-date elevations. Ted Shepard indicated that these renderings satisfied his questions and he was OK
with the elevation style and articulation that is currently shown. An additional 11x17 set of renderings,
provided during the meeting, will accompany this resubmittal.
mment Number: 16 Comment Originated: 06/11/2014
06/10/2014: Please add a standard General Note that all lighting shall be fully shielded and
down -directional.
Response: Noted.
Comment Number: 17 Comment Originated: 06/11/2014
06/11/2014. Please return all redlines.
Response: Acknowledged
Topic: Landscape Plans
Comment Number: 10 Comment Originated: 06/10/2014
06/10/2014. The mulch beds in the parkways will have foot traffic as people parking along the
street will traverse the parkways to get to the sidewalk. Be sure to specify a mulch product that
will not break down easily and applied to a sufficient depth to withstand foot traffic. The soil
should be amended to ensure that the trees receive moisture. Please add a note to the
Landscape Plan indicating the purpose, function and design of the two mulch beds.
Response: The parkway mulch beds are being used to best protect the existing tree in the parkway at the
direction of the City Forester. Similar treatments have been used at the nearby Library project, so we are
designing these to match a similar neighborhood character. The mulch has been indicated on the plans as 4"
depth wood mulch. This increased depth will help with foot traffic, and we have provided stepping stones in
locations immediately adjacent to building doors that would most likely be used for cut -through paths. Soil
amendment notes are included on the plans.
Comment Number: 11
Comment Originated: 06/10/2014
06/10/2014: Along both frontages, there seems to be a deliberate attempt to not plant shrubs
over the storm sewer line. While trees are discouraged over storm sewers, shrubs present no
such similar issues. Please consider spreading the shrubs out accordingly to take full
advantage of the width that is available. Perhaps by doing so, additional plant material can be
added.
Response: The plants are being held away from the building foundation based on the recommendations from
the soils report, not to avoid the storm sewer lines. The locations of the plants provide a simple but
ornamental 'front yard' landscape treatment in this narrow area, but using low-water, drip -irrigated plantings
set as far from the foundation as possible.
Comment Number: 12
Comment Originated: 06/10/2014
06/10/2014: Of the 34 Deciduous Shrubs, 28 are a variety of Spirea. It seems the plant palette
could be expanded to create more interest and variety.
Response: Revised.
Department: Engineering Development Review
Contact: Marc Virata, 970-221-6567, mvirata(a.fcgov.com
Topic: General
Comment Number: 1
Comment Originated: 06/10/2014
06/10/2014: On the plat, please consider adding the sub -title: "Being a replat of Lots 1 and 2 of
Block 132 of the City of Fort Collins."
Response: The sub- title has been revised.
Comment Number: 2
Comment Originated: 06/10/2014
06/10/2014. On the plat, do you want to note that the existing lot line is to be vacated by this
plat? Also, do you want to make a note of the off -site easement that will be granted for the
benefit of this project? Finally, please note that Lot 2 is mislabled as Lot 22.
Response: Lot 2 has been relabeled.
Comment Number: 3
Comment Originated: 06/10/2014
06/10/2014: On the Site Plan, please indicate that the off -site easement along the north
property line is intended for the use and enjoyment of the residents and please state what long
term maintenance agreement is between the grantor and the grantee.
Response: The site plan has been revised to indicate this language. The common area maintenance will be
governed by the HOA; specific language regarding the maintenance of the easement is being drafted and
reviewed by both parties.
Comment Number: 4 Comment Originated: 06/10/2014
06/10/2014: On the Site Plan, please clarify the details of the six-foot high metal pickett fence,
with gate, for fire access. Is this gate intended to accommodate fire equipment such as fire
trucks or simply a person access gate? Be sure to specify that the fence ends at the buildings.
Response: A 'person -gate' is indicated in the 6' ht fence to allow fire access from the east.
Comment Number: 5 Comment Originated: 06/10/2014
06/10/2014. On the Site Plan, please add a note that trash and recycling shall be by individual
unit owner and that there will be on centralized or common containers.
Response: This note has been added to the site plan.
Comment Number: 6
Comment Originated: 06/10/2014
06/10/2014: On the Site and Landscape Plans, please indicate the location of the outdoor
condensing units for each unit. If these are to be roof -mounted, please state in a general note.
Response: A note has been added indicating the roof -mounted units.
Comment Number: 7
Comment Originated: 06/10/2014
06/10/2014: There may be an issue with locating the electrical transformer within the public
right-of-way. If not so allowed, could it be shifted to the north and placed within the off -site
easement?
of electric service will only require the use of a sub -surface electric vault, which is
ved within the public 'ght-of-way.
iment Number: 8 Comment Originated: 06/10/2014
0/2014: Please ise the Land Use Data table to indicate that these units are defined by
1:4, Land Used as "Single Family Attached Dwellings." Note that the Code does not
recognize the term "Townhome." Since the use was granted per the Addition of a Permitted
Use by the P & Z Board, the proper terms must be used.
Response: Revised
Comment Number: 9 Comment Originated: 06/10/2014
06/10/2014: Please remove the topographical contour lines from the Site Plan.
Response. Revised.
F6rt Collins
Community Development and
Neighborhood Services
281 North College Avenue
PO Box 580
Fort Collins. CO 80522
970.221.6750
970.224 6134 -fax
fcgov com/developmentreview
June 13, 2014
Responses July 23, 2014
Brad Florin
NOCO Townhomes, Inc.
P.O. Box 270070
Fort Collins, CO 80527
RE: Townhomes at Library Park PDP with Addition of a Permitted Use, FDP140014, Round Number 1
Please see the following summary of comments from City staff and outside reviewing agencies for your
submittal of the above referenced project. If you have questions about any comments, you may contact the
individual commenter or direct your questions through the Project Planner, Ted Shepard, at 970-221-6343 or
tshepard@fcgov.com.
Comment Summa
Department: Planning Services
Contact: Ted Shepard, 970-221-6343, tshepard(cDfcgov.com
Topic: Building Elevations
Comment Number: 13 Comment Originated: 06/10/2014
06/10/2014: In general, the elevations have been revised since the P.D.P. I suggest we meet
to go over the changes in detail
Response: KEPHART, Owner and Ted Shepard had a meeting 7/23/2014 to discuss changes to the exterior
elevations. KEPHART provided the Planning Services with 11 x17 colored renderings of the most current and
up-to-date elevations. Ted Shepard indicated that these renderings satisfied his questions and he was OK
with the elevation style and articulation that is currently shown.
Comment Number: 14 Comment Originated: 06/10/2014
06/10/2014: Be sure to call out the extent of the standing seam metal roof. There are areas of
the roof that are not labeled. Also, be sure to indicate the color. The same comment applies
to the base masonry. This material needs to be further specified with greater detail, including
color.
Response: Standing seam metal roof locations and color has been indicated on the Architectural Elevation
sheets. More detailed information concerning the building's base masonry has been indicated on elevations.