HomeMy WebLinkAboutFOOTHILLS MALL MULTI-FAMILY - MAJOR AMENDMENT - MJA150002 - REPORTS - DRAINAGE REPORTDesign Procedure Form: Rain Garden (RG)
Sheet 2 of 2
Designer: Daniel Hull
Company: Olsson Associates
Date: April 24, 2015
Project: Major Amendment to a Portion of Foothills Mall Redevelopment Planning Area 3
Location: Modified Rain Garden 33
Choose One
5. Impermeable Geomembrane Liner and Geotextile Separator Fabric
0 YES
A) Is an impermeable liner provided due to proximity
O NO
of structures or groundwater contaminator?
Choose One
6. Inlet I Outlet Control
Q Sheet Flow- No Energy Dissipation Required
A) Inlet Control
® Concentrated Flats Energy Dissipation Provided
7. Vegetation
p Seed (Plan for frequent weed control)
40 Plantings
Sand Grown or Other High Infiltration Sod
Choose One
B. Irrigation
Q YES
A) Will the rain garden be irrigated?
® NO
Notes:
Exhibit F
Modified Rain Garden, RG33
lot 2
Rain Garden 33.0 Calcs.xism, RG 4/24/2015, 1 57 PM
Design Procedure Form: Rain Garden (RG)
Sheet 1 of 2
Designer: Daniel Hull
Company: Olsson Associates
Date: April 24, 2015
Project: Major Amendment to a Portion of Foothills Mall Redevelopment Planning Area 3
Location: Modified Rain Garden 33
1. Basin Storage Volume
A) Effective Imperviousness of Tributary Area, I,
1„ =
68.0 %
(100% 4 all paved and roofed areas upstream of rain garden)
B) Tributary Area's Imperviousness Ratio (i = Idl OO)
=
0.680
C) Water Quality Capture Volume (WQCV) for a 12-hour Drain Time
WQCV =
0.21 watershed inches
(WQCV= 0.8' (0.91' it- 1.19' i'+ 0.78' i)
D) Contributing Watershed Area (including rain garden area)
Area =
68,348 sq it
E) Water Quality Capture Volume (WQCV) Design Volume
Vwocv =
1,213 cu ft
Vol = (WQCV / 12)' Area
F) For Watersheds Outside of the Denver Regan, Depth of
dS =
0.00 in
Average Runoff Producing Storm
G) For Watersheds Outside of the Denver Region,
Vwxv 0TWR =
DA cu ft
Water Quality Capture Volume (WQCV) Design Volume
H) User Input of Water Quality Capture Volume (WQCV) Design Volume
VWOCV USER =
cu ft
(Only it a different WQCV Design Volume is desired)
2. Basin Geometry
A) WQCV Depth (12-inch maximum)
Dwmv =
12 in
8) Rain Garden Side Slopes (Z = 4 min., horiz. dist per unit vertical)
Z =
4.00 ft / ft
(Use "0" 1 rain garden has vertical walls)
C) Mimimum Flat Surface Area
AMA, =
809 sq ft
0) Actual Flat Surface Area
AAd, W =
993 sq ft
E) Area at Design Depth (Top Surface Area)
AT,p =
1692 sq ft
F) Rain Garden Total Volume
VT=
1,343 cu ft
(VT= ((Arm + Anm,x) / 2) ' Depth)
3. Growing Media
LhOoSe ne
Q 18" Rain Garden Growing Medal
10
Other (Explain):
4. Underdrain System
ChOO5e One
A) Are underdrains provided?
r
YES
0 NO
NO
B) Underdrain system orifice diameter for 12 hour drain time
i) Distance From Lowest Elevation of the Storage
y =
60.0 N
Volume to the Center of the Orifice
ii) Volume to Drain in 12 Hours
Vold=
1,213 cu ft
iii) Orifice Diameter, 3/8" Minimum
Dr, =
0.40 in
Exhibit F
Modified Rain Garden, RG33
1 of 2
Rain Garden 33.0 Calcs.xl5m, RG 412412015, 1.57 PM
5285 McWhinney Boulevard
160
Foothills Mall Multi -Family Exhibit E OAOLSSON Loveland, te CO 80538
Revised Rain Garden RG-33 ASSOCIATES TEL 970.431.7733
Existing Design
Lot
Area (SF)
AREA (AC)
Landscape
Paved
Roof
Walks
Porous
Paving
Percent
Impervious
Imperviousness
0%
100%
90%
90%
90%
NA
3
170,929
3.92
47,519
47,007
58,191
18,212
0
68%
4
112,588
2.58
36,461
1,162
66,796
8,169
0
61%
5
101,716
2.34
is,199
1,782
68,600
16,135
1 0
77%
6
134,248
3.08
33,514
2,263
89,864
8,607
0
68%
Total
519,481
8.84
132,693
52,214
283,451
51,123
1 0
68%
Proposed Design
Lot
Area (SF)
AREA (AC)
Landscape
Paved
Roof
Walks
Porous
Paving
Percent
Impervious
Imperviousness
0%
100%
90%
90%
90%
NA
3
170,929
3.92
49,881
47,583
59,234
2,515
11,716
67%
4
112,588
2.58
39,200
2S,094
32,372
8,583
7,339
61%
5
101,716
2.34
27,416
27,917
34,096
4,396
7,891
68%
6
134,248
3.08
27,217
48,433
41,840
3,884
1 12,874
75%
Total
519,481
8.84
143,714
149,027
167,542
19,378
39,820
68%
Foothills Mall Multi-Famliy
Exhibit D
Percent Imperviousness
5285 McWhinney Boulevard
Suite 160
OLSSON 9i Loveland, C080538
ASSOCIATES TEL 970.431, 7733
4 rurowe
r— "'A
x
RT OTN(r
IEFILLER 1
I
G
I li
nllli \ _
j ! LOT 3 '
I
IRIIIII�IIIIIf1
SAI f
s :
RAIN
ERORONO CURIS99 TO GARDEN 33.0
xuow RUROFF ro aM
TO Ru-(NROER Irm)
VA" Wall,
I .�
lyl�
IA, ✓ e
r ice.. r
-.r-- SAND
FILTER 1.0
FOOTHILLS REDEVELOPMENT
F-.,^_',;—"`—.
xr v
.awe �v inonm?swRRee�o- RR'ein�in°hCMol�uenluiw.
Cry aF roxl cawu.oaMlTa uxMen. mnn or rmaueo
._+.-
xLRV I1YFI
FOL
�!•
PLANNING AREA 3
• ""'
THIS NJNGAAWN OKY
FINAL PLANS
o ••.
� WILT IN vp RUSE
NAY 22. 2014MV1 ARS
H
RAIN
RESIoeNnaL
GARDEN 31.0
I
$,
R l00
OPY111C WAX
—
/
tool slq Arx: n.a.o«
TopIAI0. TTO W)IorOwMy --"_ _
9MR: EO.iwsaw, Er
DRAINAGE PLAN
BMP VOLUME SUMMARY
�).r�n ;w url • cx
LA. Sm+th Nh
L 1..: SM ;itl Rl w
d) ,x
-y
R.uwnrrcx v rs ,xe rk r F O O T H I L L S
e))^ sMc c'alslxucrFn uvnR
r� MY.Q. nu o�R Rws REDEVELOPMENT
cwsrwclro waFR ant � e. I n r c e
LEGEND
WALTON )'
uu rwnmux autrnxa
td
sw nme .M unoRwnrl
wn ao�oRwt Uval�
lnu
9[ D4, IC-Wl MMq+ nFlp IG
F
oraEep �� -a.r ■
' 1730
M9rM MAlIn; ]C AWpi )Imll)
.f9W9.1/I./i iW�, x1�lIY Y! NA
ISM. r, y, RMY6 A AtCM101.1rf
WO-001
C-3 2302
Exhibit C 5285 McWlenneV Boulevard
E
Foothills Mall Multi -Family O�OLSSON Suite 160
Lot Map ® TEL Lovef9 311..n33g
ASSOCIATES
35
F
5
201 � 17
(PS r to3
8
2sI 49 ~ T 37
— - \ Map taken from Storm Water Management Plan for Foothills Redevelopment,
r .prepared by R.A. Smith National, dated Revised December 5, 2013
5285 McWhinney Boulevard
Foothills Mall Multi-Famil Exhibit B Suite 160
y ICAOLSSON .'. Loveland. Co 80538
Existing Drainage Basins ASSOCIATES TEL 970.431.7733
E. DRAVE RD
0
J
Lot 3, 4, 5 and 61
PRINCIPAL
Ac
�;
SITE OUTLET
Lu
E. SwN.I w RD
(UNNAMED)
(
r
SITE i -
L1MI TS OF
J
FOOTHILLS
LARIMER COUNTY
LL
BASIN
DI TCH NO 2
MONROE
- - -
E. HO TOOTH
RD
Map taken from Storm Water Management Plan for Foothills Redevelopment,
prepared by R.A. Smith National, dated Revised December 5, 2013
5285 McWNnney Boulevard
Swim160
Foothills Mall Multi -Family Exhibit A O#kOLSSON Loveland. CO 80538
Vicinity Map ASSOCIATES TEL 970.431,7733
Addendum 1
Drainage Analysis for the
Major Amendment to a Portion of Foothills Mall Redevelopment Planning Area 3
(Lots 3, 4, 5, and 6 of Foothills Mall Redevelopment)
Page 2
The following calculations and supporting material are attached for your reference:
• Exhibit A — Vicinity Map
• Exhibit B — Existing Drainage Basins
• Exhibit C — Percent Imperviousness
• Exhibit D — Lot Map (Rain Garden Locations)
• Exhibit E — Revised Rain Garden, RG-33
• Exhibit F — Revised Rain Garden, RG33, Calculations
If you have any questions or need additional information, please contact me.
Sincerely,
Olsson Associates
Oti0?S
39337
' FSsroniPkl �
Daniel Hull, PE
Senior Project Engineer
Enclosures
CAOLSSON
A S S O C I A T E S
September 30, 2015
Stormwater Engineering
City of Fort Collins
281 North College Avenue
Fort Collins. CO 80524
RE: Addendum 1
Drainage Analysis for the
Major Amendment to a Portion of Foothills Mall Redevelopment Planning Area 3
(Lots 3, 4, 5. and c of Foothills Mall Redevelopment)
Dear Sir or Madam:
Olsson has completed an analysis of the drainage design for Lot 3, 4, 5 a--, 6 of Foothills Mall
Redevelopment to determine the changes from the original to the proposed design. The original
design is defined within the following drainage report: Storm Water Management Plan for
Foothills Redevelopment, prepared by R.A. Smith National, dated Revised December 5, 2013
(existing drainage report).
The lots fall within Basin 25 of the Existing Drainage Report. The original basin's
imperviousness was compared to the imperviousness of the proposed design to determine if
further analysis would be required. The original design's overall composite percent
imperviousness was determined to be 68 percent. The percent imperviousness of the proposed
design was calculated to be 6E percent. Based on the calculations, a reduction of the developed
runoff would be anticipated. See attached calculations and supporting material. Since the
intended drainage patterns will remain the same, detailed analysis will not be required.
In addition, the runoff for original design was intended to drain to sand filters and rain gardens
within the Foothills Mall Redevelopment: Sand Filters SF-1.0, SF-2.0. and SF-4.0; and Rain
Gardens RG-29 and RG-31. These drainage systems have been designed per the existing
drainage report and are being constructed as part of the Foothills Redevelopment Planning
Area 2 Final Plans. The rain garden and sand filter design's assumed the contributing area was
90 percent imperviousness. Based on that assumption, additional analyses will not be required.
Since rain garden RG-33 was being constructed as part of Foothills Redevelopment Planning
Area 3 Final Plans, analysis of the rain garden was completed for the proposed design. Based
on the analysis a rain garden will be provided in the northeast corner of Lot 3 meeting the
original intent.
5285 McWhinney Blvd., Suite 160 TEL 303.237.2072
Loveland, CO 80538 FAX 303.237,2659 www.olssonassociates.com