HomeMy WebLinkAboutFOOTHILLS MALL MULTI-FAMILY - MAJOR AMENDMENT - MJA150002 - CORRESPONDENCE - (3)Department: Zoning
Contact: Noah Beals, 970-416-2313, nbeals@fcgov.com
Topic: General
Comment Number: 1 Comment Originated:
05/19/2015
05/19/2015: Architectural Elevations for all the building types are needed.
Comment Number: 2 Comment Originated:
05/19/2015
05/19/2015: Please change the Planning Signature Block. This should be the
Community Development and Neighborhood Services Director.
Comment Number: 3 Comment Originated:
05/19/2015
05/19/2015: When the existing zoning is identified please also include it is in
the TOD Overlay.
Comment Number: 4 Comment Originated:
05/19/2015
05/19/2015: The Cover sheet Yield Study totals do not match the individual site
plan totals.
Comment Number: 5 Comment Originated:
05/19/2015
05/19/2015: Where is the alternative compliance request or modification
request for the building setbacks on Lot 4.
Comment Number: 6 Comment Originated:
05/19/2015
05/19/2015: With 324 off-street parking spaces, the project is required 8
handicap spaces. I am only seeing 5.
Comment Number: 7 Comment Originated:
05/19/2015
05/19/2015: Will need to see a trash enclosure design. This will need to
include a walk-in access separate from the main -service gate.
Comment Number: 8 Comment Originated:
05/19/2015
05/19/2015: Where will the ac units be located? They should be shown on the
site and landscape.
05/19/2015: Please show curb stop on domestic services. Are the "circles°
curb stops? Please call out. What are the circles on fire lines? Curb stops are
not needed on fire lines greater than 2".
Comment Number: 5 Comment Originated: 05/19/2015
05/19/2015: Please provide calculations to support water service sizing.
Comment Number: 6 Comment Originated: 05/19/2015
05/19/2015: Please show that hydrants and curb stops are placed within ROW
or easement.
Comment Number: 7 Comment Originated: 05/19/2015
05/19/2015: Please detail fire service connections.
Comment Number: 8
Comment Originated: 05/19/2015
05/19/2015: Please show slopes on sanitary service lines and verify that
minimum slopes are met.
Comment Number: 9 Comment Originated: 05/19/2015
05/19/2015: Please detail connections throughout.
Comment Number: 10 Comment Originated: 05/19/2015
05/19/2015: Please provide construction details as appropriate. Details can be
downloaded at either http://citydocs.fcgov.com/?
dt=DETAIL+DRAWINGS&dn=UTILITIES&vid=189&cmd=showdt (.dwg format)
or
http://www.fcgov.com/utilities/business/bu ilders-and-developers/development-fo
rms-guidelines-regulations (.pdf format).
Comment Number: 11 Comment Originated: 05/19/2015
05/19/2015: Water and sewer mains must be within ROW or utility easement.
Minimum easement width are generally 20' for water mains and 30' for sewers
(adequate for sewer trenches up to -17' deep). Deeper sewers may
necessitate wider easements and shallow sewers may allow a narrower width.
Comment Number: 12 Comment Originated: 05/19/2015
05/19/2015: Please see redlines.
Comment Number: 13
Comment Originated: 05/19/2015
05/19/2015: Additional comments may apply as more details on the design
and plans are provided.
Comment Number: 14
Comment Originated: 05/28/2015
05/28/2015: Please include profiles for water mains 12" or larger and all
sanitary sewer mains.
Comment Number: 15
Comment Originated: 05/29/2015
05/29/2015: For Lot 3..
Please move the water service for Building 4 to the looped main.
Please provide mechanical memo to show that the dead end main serving
Building 1, 2 and 3 can support the number of units (I'm showing 41) as well as
fire flows.
Comment Number: 9 Comment Originated: 05/20/2015
05/20/2015: There are line over text issues. See redlines.
Topic: Site Plan
Comment Number: 10 Comment Originated: 05/20/2015
05/20/2015: Please revise the legal description as shown, and list only the Lots
affected by this Major Amendment. See redlines.
Department: Traffic Operation
Contact: Martina Wilkinson, 970-221-6887, mwilkinson@fcgov.com
Topic: General
Comment Number: 1
05/20/2015: no comments
Department: Water Conservation
Contact: Eric Olson, 970-221-67045
Topic: General
eolson@fcqov.com
Comment Originated: 05/20/2015
Comment Number: 1 Comment Originated: 05/18/2015
05/18/2015: A landscape plan shall contain accurate and identifiable
hydrozones, including a water budget chart that shows the total annual water
use, which shall not exceed fifteen (15) gallons per square foot over the site. If
you have questions contact Eric Olson at eolson@fcgov.com or 970-221-6704.
Comment Number: 2 Comment Originated: 05/18/2015
05/18/2015: Irrigation plans are required no later than at the time of building
permit. The irrigation plans must comply with the provisions outlined in Section
3.2.1(J) of the Land Use Code. Direct questions concerning irrigation
requirements to Eric Olson, at 221-6704 or eolson@fcgov.com
Comment Number:
Department: Water -Wastewater Engineering
Contact: Dan Mogen, , dmogen@fcgov.com
Topic: General
Comment Originated: 05/18/2015
Comment Number: 1 Comment Originated: 05/19/2015
05/19/2015: Were lines stubbed for previous building arrangement? If so,
please reuse these stubs or abandon them at the main.
Comment Number: 2 Comment Originated: 05/19/2015
05/19/2015: Please loop water mains to eliminate dead ends. Dead ends are
to be avoided wherever possible, and a hydrant must be placed at the dead end
if the main cannot be looped.
Comment Number: 3
Comment Originated: 05/19/2015
05/19/2015: Are hydrants existing? Please provide more detail if not and clarify
existing vs proposed.
Comment Number: 4 Comment Originated: 05/19/2015
Volume 3 Chapte, i Section 1.3.3. Current Erosion Control Materials
Submitted does not meet requirements. Please submit; Erosion Control Plan,
Erosion Control Report, and an Escrow / Security Calculation. If you need
clarification concerning this section, or if there are any questions please contact
Jesse Schlam 970-218-2932 or email @ jschlam@fcgov.com
Department: Technical Services
Contact: Jeff County, 970-221-6588, Icounty@fcgov.com
Topic: Building Elevations
Comment Number: 1 Comment Originated: 05/19/2015
05/19/2015: Plan sheets that are in color are not acceptable.
Topic: Construction Drawings
Comment Number: 2 Comment Originated: 05/19/2015
05/19/2015: Please update the Benchmark Statement to the following format.
PROJECT DATUM: NGVD29 UNADJUSTED (OLD CITY OF FORT COLLINS
DATUM)
BENCHMARK # w/ DESCRIPTION
ELEVATION:
BENCHMARK # w/ DESCRIPTION
ELEVATION:
NOTE: IF NAVD 88 DATUM IS REQUIRED FOR ANY PURPOSE, THE
FOLLOWING EQUATION SHOULD BE USED: NAVD88 = NGVD29
UNADJUSTED + X.XX'.
Comment Number: 3
Comment Originated: 05/19/2015
05/19/2015: Please revise the Basis Of Bearings. The Plat referenced has
been replatted by the Foothills Mall Redevelopment Subdivision.
Comment Number: 4 Comment Originated: 05/19/2015
05/19/2015: There is text that needs to be rotated 180 degrees. See redlines.
Comment Number: 5 Comment Originated: 05/19/2015
05/19/2015: The lighter background text & linework marked is not acceptable. It
will not scan or reproduce. Please darken it up. See redlines.
Topic: Landscape Plans
Comment Number: 6
Comment Originated: 05/19/2015
05/19/2015: Please remove the hatching from sheet LS 6 on the diagram on
sheet 5. See redlines.
Comment Number: 7
Comment Originated: 05/19/2015
05/19/2015: Please be consistent with the sheet numbering. The sheet
diagram shows LS numbers, and each sheet number does not include LS. See
redlines.
Comment Number: 8 Comment Originated: 05/20/2015
05/20/2015: The title of sheet 10 is labeled as a Site Plan. Please correct.
Comment Number: 2
Comment Originated: 05/19/2015
05/19/2015: WATER SUPPLY
Lot 3: Relocate hydrant at the drive entrance, north to the landscape area at the
northern property boundary per 5/15/2015 meeting.
Department: Stormwater Engineering
Contact: Dan Mogen, dmogen@fcgov.com
Topic: General
Comment Number: 2
Comment Originated: 05/19/2015
05/19/2015: The application for variance has been denied at this time;
therefore, LID requirements apply including 25% permeable pavement.
Comment Number: 3
Comment Originated: 05/19/2015
05/19/2015: Please provide a LID Table showing that LID requirements are
met. Sample table available upon request; please email Dan Mogen at
dmogen@fcgov.com
Comment Number: 4 Comment Originated: 05/19/2015
05/19/2015: Please provide a drainage plan that shows drainage basins and
flow routing along with calculations to support sizing of inlets, pipes, rain
gardens, etc.
Comment Number: 5 Comment Originated: 05/19/2015
05/19/2015: Please verify the proposed drainage plan for this site is consistent
with the approved plan for the overall Mall development. If not, please show that
adequate conveyance exists downstream to the outfall swale from the mall.
Comment Number: 6 Comment Originated: 05/19/2015
05/19/2015: A maintenance agreement is needed between the Mall &
Multi -family regarding the maintenance of sand filters and rain gardens. Please
include the agreement in the drainage report for reference.
Comment Number: 7
Comment Originated: 05/19/2015
05/19/2015: Please provide construction details as appropriate. Details can
be downloaded at either http://citydocs.fcgov.com/?
dt=DETAIL+DRAWINGS&dn=UTILITIES&vid=189&cmd=showdt (.dwg format)
or
http://www.fcgov. co m/uti I ities/bu sin ess/b u iders-and-developers/deve lopm ent-fo
rms-guidelines-regulations (.pdf format).
Comment Number: 8
05/19/2015: Please see redlines.
Comment Number: 9
Comment Originated: 05/19/2015
Comment Originated: 05/19/2015
05/19/2015: Additional comments may apply as more details on the design
and plans are provided.
Contact: Jesse Schlam, 970-218-2932, jschlam@fcgov.com
Topic: Erosion Control
Comment Number: 1 Comment Originated: 05/19/2015
05/19/2015: The site disturbs more than 10,000 sq-ft, therefore Erosion and
Sediment Control Materials need to be submitted for FDP. The erosion control
requirements are in the Stormwater Design Criteria under the Amendments of
labels by placing a, , M or other symbol to identify the mitigation gees.
Shade Trees 3.0 inch caliper
Ornamental Trees 2.5 inch caliper
Evergreen trees 8 feet height
Comment Number: 2
Comment Originated: 05/20/2015
05/20/2015:
Contact the City Forester for an on -site meeting to review any existing,
significant trees for retention. Significant trees need to be retained to the extent
reasonably feasible. Significant trees on the site should be identified on the
plans by species, size, condition, mitigation and intent to retain, transplant or
remove. Inventory information is available from Foothills Mall Tree Inventory.
Comment Number: 4
Comment Originated: 05/20/2015
05/20/2015:
Add the following note in larger print with a bold border to the landscape plan.
A free permit must be obtained from the City Forester before any street trees
are planted in parkways between the sidewalk and Curb or on the City Right of
Way behind the sidewalk. Street tree locations and numbers may change to
meet actual utility/tree separation standards. Landscape contractor must obtain
approval of street tree location after utility locates. Street trees must be
inspected and approved before planting. Failure to obtain this permit is a
violation of the Code of the City of Fort Collins.
Comment Number: 5
Comment Originated: 05/20/2015
05/20/2015:
Please add this note if it is not already on the plans.
Landscaping including street trees in each phase shall be or secured with a
letter of credit, escrow, or performance bond for 125% of the value of the
landscaping and installation prior to the issuance of certificate of occupancy for
any building. All City street trees must be installed established, of an approved
species and of acceptable condition prior to final release of financial security.
Comment Number: 5 Comment Originated: 05/20/2015
05/20/2015:
Provide a final landscape plan that provides identification of plant species, size
at planting and method of transplant. Provide for the Minimum Tree Species
Diversity in LUC 3.2.1 D 2 3 and record the percentage of each tree species
used in the plant list.
Department: PFA
Contact: Jim Lynxwiler, 970-416-2869, elynxwiler@poudre-fire.org
Topic: General
Comment Number: 1
Comment Originated: 05/19/2015
05/19/2015: FIRE ACCESS
PFA has been working with the project team to resolve some remaining fire
access details per our meeting of 5/15/2015. In particular, Lot 5: Widen fire lane
on west side of buildings 15 & 16, from 24' to 26'.
Comment Number: 5
Comment Originated: 05/19/2015
05/19/2015: Pavement Engineering has provided comment that they would
want as part of any development agreement for the project, acknowledgement
from the Developer/Owner that sidewalk maintenance (including snow
shovelling) is the responsibility of the abutting property owner.
Department: Environmental Planning
Contact: Kelly Kimple, kkimple@fcgov.com
Topic: General
Comment Number: 1
Comment Originated: 05/14/2015
05/14/2015: Environmental Planning has no comments on the Major
Amendment. We will review seed mixes at the time of final.
Department: Forestry
Contact: Tim Buchanan, 970-221-6361, tuchanan@fcgov.com
Topic: General
Comment Number: 3
Comment Originated: 05/20/2015
05/20/2015:
Please edit the street tree notes to include all of the following. Include these
notes under a separate heading Street Tree Notes.
1. A permit must be obtained from the City Forester before any trees or shrubs
as noted on this plan are planted, pruned or removed on the public right-of-way.
This includes zones between the sidewalk and curb, medians and other City
property. This permit shall approve the location and species to be planted.
Failure to obtain this permit may result in replacing or relocating trees and a
hold on certificate of occupancy.
2. Contact the City Forester to inspect all street tree plantings at the completion
of each phase of the development. All trees need to have been installed as
shown on the landscape plan. Approval of street tree planting is required before
final approval of each phase.
3. Street tree shall be supplied and planted by the developer using a qualified
landscape contractor.
4. The developer shall replace all dead and dying street trees after planting until
final maintenance inspection and acceptance by the City of Fort Collins Forestry
Division. All street trees in the project must be established of an approved
species and of acceptable le condition prior to acceptance.
5. Street tree locations and numbers may be adjusted to accommodate
driveway locations, utility standards, separation between trees, street signs and
street lights. Street trees shall be
Topic: Landscape Plans
Comment Number: 1
Comment Originated: 05/20/2015
05/20/2015:
Provide upsized mitigation trees for significant trees removed or to account for
mitigation trees allocated to the areas on these plans as recorded on previously
approved phase three mall plans. Upsized mitigation trees should be sized as
follows and can be trees proposed on the Foothills Mall Multi -Family Major
Amendment. Clearly identify mitigation trees in the plant list and on the direct
Comment Number: 33.
Comment Originated: 06/02/2015
06/02/2015: Since our meeting on May 27, 2015, and based conversations
with the consulting team, Staff is in agreement that the layout and arrangement
of buildings, and their relationship to the Mall Access Drive, are acceptable.
Staff has indicated that the team should focus on creating individual identity at
the pedestrian level by customizing the each building's entrance but re -orienting
the buildings is not necessary.
Department: Engineering Development Review
Contact: Marc Virata, 970-221-6567, mvirata@fcqov.com
Topic: Construction Drawings
Comment Number: 2 Comment Originated:
05/19/2015: I'm understanding with preliminary conversations with Bob Walter
with Alberta that they intend to have the interior ring road construction
completed fairly soon and would be concerned about utility tie-ins from this
project into the ring road occurring after their completion of the ring road
pavement. The interior roadway being private, does not have City Engineering
implications, however it may of interest to the developers in the area to have the
utility connections within the ring road shown on the civil plans for this project, be
instead indicated as revisions to the original Planning Area 3 set and installed
"at -risk" in advance of the planned paving of the ring road. City Engineering
permitting and inspection fees for the public infrastructure would be required in
conjunction with the approval of the revisions to the PA3 plans.
Comment Number: 3
05/19/2015
Comment Originated: 05/19/2015
05/19/2015: The civil drawings should be providing labelling information to
indicate and discern 1) what improvements would be installed with this project
that were originally shown to be installed with the PA3 plans, 2) what
improvements are to be installed by Alberta per either the PA2 or PA3 plans,
such as presumably the 64.7 feet of 6 inch sanitary sewer main in Stanford
Road.
Comment Number: 4
Comment Originated: 05/19/2015
05/19/2015: Project Note 1.b. indicates that utility stubs to the lots are to be
installed by Alberta per the PA3 plans. Is it the intention that the additional work
shown on the PA3 plans that are not utility stubs to the lots (such as the sanitary
tie-in to Stanford Road between lots 3 & 4) will also be done?
Topic: General
Comment Number: 1 Comment Originated: 05/19/2015
05/19/2015: The drawings (especially the civil set) would benefit from showing
existing easements dedicated with the plat for Foothills Mall Redevelopment
Subdivision. It seems that existing easements may need to be vacated in areas
and new easements dedicated in others. Lot 4 in particular appears to require
vacation of a large easement for the northern portion of the lot. Please provide
information on the anticipated easement dedications and vacations for review.
Per our Transportation Development Review Fee schedule, each deed of
dedication is $250 and each vacation is $400, along with Larimer County
recordation costs. A 2 week routing for review and approval by the utility
providers is needed for each utility easement vacation request.
Comment Number: 23.
Comment Originated: 05/20/2015
05/20/2015: For all three modules (end -facing elevations), there is no
distinguishing top element leading to a flat and sparse look. Please consider
options that address this component. Perhaps a parapet, projection or cornice
would add a level of detail that solves this problem.
Comment Number: 24. Comment Originated: 05/20/2015
05/20/2015: On the long -side elevations, as mentioned above, the facades
would benefit for adding more details to the windows. And, the same comment
applies to creating a distinct top element to mitigate height and mass. And, the
same comment applies to raising up the base material — ceramic panel
cladding.
Comment Number: 25.
Comment Originated: 05/20/2015
05/20/2015: Overall, staff is concerned about the reliance on the gray color
tones. The over -use of gray on recent multi -family buildings on a community
wide -basis is becoming quite noticeable. On a project of this scale, there
should be no reliance on anyone color tone. In fact, our visual preference
surveys indicate higher ratings for buildings that feature warmer color tones
versus cooler tones. Staff recommends that in order to comply with Section
3.8.30(F)(2), the design team use a broad palette of colors so that one color
tone does not dominate.
Comment Number: 26. Comment Originated: 05/20/2015
05/20/2015: In general, staff is looking for the project to be more varied, further
articulated with a richer mix of details, with warmer color tones.
Comment Number: 27. Comment Originated: 05/20/2015
05/20/2015: Please indicate the material and color of the stairwell screen walls.
Comment Number: 28.
Comment Originated: 05/20/2015
05/20/2015: On the architectural sheet, there is a depiction of a low screen wall
and pedestrian entry portal leading to the courtyard beyond. Please indicate on
the site plan where these elements occur. Again, to emphasize variety, each
entry portal should be unique and not repeated.
Comment Number: 29.
Comment Originated: 05/20/2015
05/20/2015: Prior to hearing, we need to review the materials and color with
sample boards.
Comment Number: 30.
Comment Originated: 06/02/2015
06/02/2015: Be sure to provide the appropriate number and properly sized
containers for recyclable materials. In addition, there are new techniques for
accommodating compostable materials. For further information, please contact
Caroline Mitchell, Environmental Planner, 221-6288, cmitchell@fcgov.com.
Comment Number: 31. Comment Originated: 06/02/2015
06/02/2015: As the locations for the electrical transformers become finalized,
please provide landscaping or solid screening so that they are not visible from
Stanford Road.
Comment Number: 32.
Comment Originated: 06/02/2015
06/02/2015: Where it is not possible to add internal private sidewalks due to
ownership by Alberta, please label as "not a part."
segments of inten iai sidewalks. At the south end, this walk mubc be six feet in
width to account for the 17-foot long stall length and must extend south to join
with new sidewalk (preceding comment) along the Mall Access Drive. At the
north end, there are no spaces so the walk can be reduced to five feet in width.
Comment Number: 14. Comment Originated: 05/20/2015
05/20/2015: For Lot 5, the same comment applies as to customizing
street -facing building entrances to address the issue of repetitiveness.
Comment Number: 15. Comment Originated: 05/20/2015
05/20/2015: A sidewalk must be added along the southerly Mall Access Drive.
This sidewalk must be detached with a parkway for street trees.
Comment Number: 16. Comment Originated: 05/20/2015
05/20/2015: Please add a connecting walkway between buildings A and B that
connects the driveway/garage access to the bus stop.
Comment Number: 17. Comment Originated: 05/20/2015
05/20/2015: At the southwest corner of building D-1, add short segment of
connecting walkway that links to the sidewalk along the north -south Mall Access
Drive.
Comment Number: 18. Comment Originated: 05/20/2015
05/20/2015: For all buildings, as mentioned previously, we will need to see how
the project complies with Section 3.8.30(F)(2) so that there is substantial
variation among repeated buildings.
Comment Number: 19.
Comment Originated: 05/20/2015
05/20/2015: On the architectural elevations, there needs to be additional
three -dimensionality and articulation, otherwise, the fagades appear to be flat.
Presently, the unadorned windows contribute to this lack of articulation and
need additional detail. Please add sills, lintels, additional framing or other
features that allow the windows to create shadow lines and overall visual
interest.
Comment Number: 20.
Comment Originated: 05/20/2015
05/20/2015: The ends of the buildings are divided into three modules. Please
provide more detail features for the two end modules. For the left module, the
base material should be raised up the top of the first floor. Presently, the
ceramic panel cladding is too low to act as a base material. Also, the materials
do not appear to add any depth to the fagade and the module appears flat and
uninteresting. As mentioned, window embellishment will help, but overall, the
massing is not broken down. Staff is concerned since the ends of the buildings
will be highly visible. Please explore solutions that address how the left module
can be further articulated.
Comment Number: 21.
Comment Originated: 05/20/2015
05/20/2015: For the right module, there is no distinct base. The three story
height and mass needs to be softened with a distinct base material and color
that is differentiated from the upper portions of the wall.
Comment Number: 22.
Comment Originated: 05/20/2015
05/20/2015: For the middle module, the fiber cement cladding appears to
feature seams that will for some depth and shadow lines. Please provide a
detail or sample that clearly indicates the width and depth of the seams.
Please indicate how these two heights are to be distributed. Is mere any variety
to the distribution? In other words, is there a chance that there can be varying
heights along the Mall Access Drive?
Comment Number: 4. Comment Originated: 05/20/2015
05/20/2015: For Lot Three, please provide a detailed narrative and schematic
that fully describes all the aspects of the Mall Access Drive and how it complies
with the requirements for a Street -Like Private Drive per Section 3.6.2(N)(1-6).
If addresses are taken off this private drive, then it should be named Foothills
Parkway.
Comment Number: 5. Comment Originated: 05/20/2015
05/20/2015: Please provide a unit count per building. Note that on Sheet 2 of
11, there are two unit counts indicated. Also, it would be helpful to label the
street -facing building entries as the graphic depiction is miniscule.
Comment Number: 6. Comment Originated: 05/20/2015
05/20/2015: For Building D-2 at the corner of Stanford Road and the Mall
Access Drive, the building is only nine feet set back from property line. This
building is called out to be a combination of two and three stories. Is the
building two stories at this nine foot setback condition? If not, and there are
three stories at the nine foot setback line, then the applicant is encouraged to
create a 45-degree angle at the building corner and accent this angle with
projecting bay windows on the upper floors. In addition, landscaping in this area
should be enhanced. Please provide a sight distance triangle for this
intersection and then upgrade the landscaping outside this triangle.
Comment Number: 7. Comment Originated: 05/20/2015
05/20/2015: Please add connecting walkways that link the sidewalk along the
Mall Access Drive to the two courtyards.
Comment Number: 8.
Comment Originated: 05/20/2015
05/20/2015: Along the north property line, please call out that the existing fence
is to remain and add a note as to transferring the property north of the fence to
the adjoining property owners.
Comment Number: 9. Comment Originated: 05/20/2015
05/20/2015: If under the original approval, Modifications of Standard were
granted that are carried forward on this Major Amendment, please state on the
plans in the form a General Note.
Comment Number: 10. Comment Originated: 05/20/2015
05/20/2015: For Lot 4, the same comment applies about establishing unique
features at each street -facing building entrance. Otherwise, there will excessive
repetitiveness along Stanford Road.
Comment Number: 11. Comment Originated: 05/20/2015
05/20/2015: All internal walkways at the head of the 17-foot long parking stalls
need to be six feet in width.
Comment Number: 12. Comment Originated: 05/20/2015
05/20/2015: On Lot 4, at the southerly Mall Access Drive, the public sidewalk
along Stanford must be continued. Since this would be a new walk, it must be
detached so that street trees can be planted in the parkway.
Comment Number: 13. Comment Originated: 05/20/2015
05/20/2015: In the parking lot, at the north and south ends, there are missing
City of
�F6rt Collins
Community Development and
Neighborhood Services
281 North College Avenue
PO Box 580
Fort Collins. CO 80522
970.221.6750
970.224.6134 - tax
fcgov. com/developmentreview
June 02, 2015
Dean Barber
McWhinney Real Estate Services Inc. c/o JPL Development
2725 Rocky Mountain Avenue
Loveland, CO 80538
RE: Foothills Mall Redevelopment Multi -Family, MJA150002, Round Number 1
Please see the following summary of comments from City staff and outside reviewing
agencies for your submittal of the above referenced project. If you have questions about
any comments, you may contact the individual commenter or direct your questions through
the Project Planner, Ted Shepard, at 970-221-6343ortshepard@fcgov.com.
Comment Summary:
Department: Planning Services
Contact: Ted Shepard, 970-221-6343, tshepard@fcgov.com
Topic: General
Comment Number: 1.
Comment Originated: 05/20/2015
05/20/2015: In general, for Lot Three, overall design mitigation needs to focus
on softening the regimentation of the alignment of the eight buildings and their
relationship to the Mall Access Drive. Otherwise, the pattern becomes
repetitious.
Comment Number: 2.
Comment Originated: 05/20/2015
05/20/2015: The applicant is reminded that in order to comply with Section
3.8.30(F)(2), there needs to be at least three distinctly different building models
throughout the entire project. Compliance with this standard will require a
demonstrable difference between the various building models and that such
variety is substantive and not merely consist of marginally different accent
features. For Lot 3, however, the applicant must go further and is encouraged
to further differentiate the eight buildings by providing a unique, street -facing
building entrance on a per building basis. There must be eight individual entry
canopies, materials, colors and accents that define each building in a distinctive
manner that enlivens the streetscape. Each entry can be depicted with a detail.
Otherwise, Lot Three is characterized by excessive repetitiveness.
Comment Number: 3. Comment Originated: 05/20/2015
05/20/2015: All buildings on Lot Three are labeled two and three stories.