HomeMy WebLinkAboutMANHATTAN TOWNHOMES, SECOND FILING - PDP/FDP - FDP150021 - CORRESPONDENCE - (3)Contact: Martina Wilkinson, 970-221-6887, mwilkinson(a)fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 07/14/2015
ll N F 07/14/2015: Given the fact that this property was previously approved for more
units than what is shown now, and that the anticipated traffic to be generated
does not meet the threshold for requiring a TIS, the Traffic Impact Study
requirement is waived.
Comment Number: 2 Comment Originated: 07/14/2015
H R 07/14/2015: Is there a connection from the internal parking lot to the trail? That
would be helpful for multi -modal mobility.
Comment Number: 3 Comment Originated: 07/14/2015
H FS 07/14/2015: It is unclear how Manhattan will be striped. Will parking be
accommodated along the property frontage? This should be shown, including
transitions to the existing roadway on both north and south side.
Department: Water -Wastewater Engineering
Contact: Wes Lamarque, 970-416-2418, wlamargue(a)fcgov.com
Topic: General
Comment Number: 1 Comment Originated:
07/16/2015
H R 07/16/2015: The maximum allowed units for a joint service is six. Please
revise where this is exceeded.
Comment Number: 2 Comment Originated:
07/16/2015
H R 07/16/2015: Connection 5 for the sanitary sewer needs to be a public sewer
heading west into the site. Also, please provide a manhole at the junction.
Comment Number: 3 Comment Originated:
07/16/2015
H R 07/16/2015: Will the existing 6-inch water line on the south end of the site be
private? If the line is to be public, a blowout is required at the eastern end.
Comment Number: 4 Comment Originated:
07/16/2015
H R 07/16/2015: Please see redlines for other comments.
IF NGVD29 UNADJUSTED DATUM IS REQUIRED FOR ANY PURPOSE,
THE FOLLOWING EQUATION SHOULD BE USED: NGVD29 UNADJUSTED
= NAVD88 - X.XX'.
Comment Number: 6 Comment Originated: 07/14/2015
HR 07/14/2015: There are line over text issues. See redlines.
Comment Number: 7 Comment Originated: 07/14/2015
HR 07/14/2015: There is text that needs to be masked. Mask all text in hatched
areas. See redlines.
Topic: Landscape Plans
Comment Number: 8
Comment Originated: 07/14/2015
H R 07/14/2015: Please change Manhattan Drive to Manhattan Avenue. See
redlines.
Topic: Plat
Comment Number: 9 Comment Originated: 07/14/2015
H R 07/14/2015: Please provide title commitment information as available.
Comment Number: 10 Comment Originated: 07/14/2015
t 'R 07/14/2015: Please label all found monuments. See redlines.
Comment Number: 11 Comment Originated: 07/14/2015
H R 07/14/2015: Because Tract B is a D,U & A Easement, the only Utility
Easements that needs to be dedicated separately are those portions of Lots
8-16, 17 & that small portion of Lot 7 as marked in red. See redlines.
Comment Number: 12 Comment Originated: 07/14/2015
H R 07/14/2015: Please provide a detail showing the area marked at the northeast
corner of Lot 36 on sheet 2. See redlines.
Comment Number: 13 Comment Originated: 07/14/2015
H R 07/14/2015. All easements must be labeled & locatable. See redlines.
Comment Number: 14 Comment Originated: 07/14/2015
H R 07/14/2015: There are line over text issues. See redlines.
Comment Number: 15 Comment Originated: 07/14/2015
HR 07/14/2015: Please label the Basis Of Bearings, and explain how you have
established the location of the corners. See redlines. If needed, please call John
to discuss.
Comment Number: 16 Comment Originated: 07/14/2015
H R 07/14/2015: Sheet 3 is not necessary. Please see the notes on sheet 3 and
decide if it is going to remain with the Plat, and make the changes as marked if
you choose to keep it. See redlines.
Topic: Site Plan
Comment Number: 17 Comment Originated: 07/14/2015
H R 07/14/2015. There are line over text issues. See redlines.
Department: Traffic Operation
Comment Number: 2 Comment Originated: 07/16/2015
HR 07/16/2015: More clarification and documentation is needed to make sure the
PDP is meeting the LID requirements. It appears the porous paver system may
be taking on more than 3 to 1 impervious surface.
Comment Number: 3 Comment Originated: 07/16/2015
H R 07/16/2015: Temporary erosion control is needed for the pipe outlets into the
regional detention pond.
Comment Number: 4
Comment Originated: 07/16/2015
H R 07/16/2015: The City of Fort Collins Stormwater Utility will no longer require a
landscape maintenance easement for the landscape improvements on City
property. Coordination with the Environmental Planner and Stormwater staff is
needed to determine a warranty period and development agreement language.
Comment Number: 5 Comment Originated: 07/16/2015
'H R 07/16/2015: Please see other minor comments on the redlines.
Department: Technical Services
Contact: Jeff County, 970-221-6588, jcounty(a�fcgov.com
Topic: Building Elevations
Comment Number: 1 Comment Originated: 07/14/2015
y r4 07/14/2015: Plan sheets that are in color are not acceptable.
Comment Number: 2 Comment Originated: 07/14/2015
H R 07/14/2015: Please add "Second Filing" to the title block on all sheets. See
redlines.
Comment Number: 3 Comment Originated: 07/14/2015
k R 07/14/2015: Please add sheet numbering to the plan sheets.
Topic: Construction Drawings
Comment Number: 4 Comment Originated: 07/14/2015
H R 07/14/2015: Please correct the sub -title to match the Subdivision Plat. See
redlines.
Comment Number: 5 Comment Originated: 07/14/2015
HR 07/14/2015: Please make sure the Benchmark Statement is in the EXACT
format shown below.
PROJECT DATUM: NAVD88
BENCHMARK # w/ DESCRIPTION
ELEVATION:
BENCHMARK # w/ DESCRIPTION
ELEVATION:
PLEASE NOTE: THIS PLAN SET IS USING NAVD88 FOR A VERTICAL
DATUM. SURROUNDING DEVELOPMENTS HAVE USED NGVD29
UNADJUSTED FOR THEIR VERTICAL DATUMS.
> Shall be designated on the plat as an Emergency Access Easement.
> Maintain the required 20 foot minimum unobstructed width & 14 foot minimum
overhead clearance.
> Be designed as a flat, hard, all-weather driving surface capable of supporting
40 tons.
> Dead-end fire access roads in excess of 150 feet in length shall be provided
with an approved area for turning around fire apparatus.
> The required turning radii of a fire apparatus access road shall be a minimum
of 25 feet inside and 50 feet outside. Turning radii shall be detailed on
submitted plans.
> Be visible by painting and/or signage, and maintained unobstructed at all
times.
> Additional access requirements exist for buildings greater than 30' in height.
Refer to Appendix D of the 2012 IFC or contact PFA for details.
International Fire Code 503.2.3, 503.2.4, 503.2.5, 503.3, 503.4 and Appendix
D; FCLUC 3.6.2(B)2006 and Local Amendments.
Comment Number: 2 Comment Originated: 07/12/2015
H R 07/12/2015: WATER SUPPLY
The proposed utility plan details 3 locations for hydrants. I would like to work
with the project team to reduce the number of hydrants where feasible. Please
contact me to discuss this in further detail.
Comment Number: 3
Comment Originated: 07/12/2015
HR07/12/2015: PREMISE IDENTIFICATION
An addressing plan is required. Unless the private drive is named, monument
signage may be required to allow way -finding. Code language provided below.
> IFC 505.1: New and existing buildings shall have approved address numbers,
building numbers or approved building identification placed in a position that is
plainly legible, visible from the street or road fronting the property, and posted
with a minimum of six-inch numerals on a contrasting background. Where
access is by means of a private road and the building cannot be viewed from
the public way, a monument, pole or other sign or means shall be used to
identify the structure.
Department: Stormwater Engineering
Contact: Jesse Schlam, 970-218-2932, jschlam .fcgov.com
Topic: Erosion Control
HR/INF Comment Number: 1 Comment Originated
07107/2015: The site disturbs more than 10,000 sq-ft, therefore Erosion and
Sediment Control Materials need to be submitted for FDP. The erosion control
requirements are in the Stormwater Design Criteria under the Amendments of
Volume 3 Chapter 7 Section 1.3.3. Please submit; Erosion Control Plan
(Redlines were Returned with the packet) , Erosion Control Report, and an
Escrow / Security Calculation. If you need clarification concerning this section,
or if there are any questions please contact Jesse Schlam 970-218-2932 or
email @ jschlam@fcgov.com
Contact: Wes Lamarque, 970.416-2418, wlamargue@fcgov.com
Topic: General
07/07/2015
secondary will need to be extended and re -pulled.
Comment Number: 3 Comment Originated: 06/26/2015
H, R 06/26/2015: The Utility plans show some gas meters where electric meters
need to be. Owner will need to coordinate meter locations with Light & Power
Engineering,
Comment Number: 4 Comment Originated: 06/26/2015
[~ R 06/26/2015: Contact Light & Power Engineering @ 970-221-6700 to
coordinate locations for electric lines. Electric lines are shown going in back lot.
Light & Power does front lot installations. With the smaller private drive it may
be difficult to fit all of the utilities in the easement.
Department: PFA
Contact: Jim Lynxwiler, 970-416-2869, jlynxwiler(a)poudre-fire.org
Topic: General
Comment Number:
Comment Originated: 07/12/2015
HR 07/12/2015: FIRE LANES
General fire access is required to within 150' of all exterior portions of all
buildings. This requirement has been met with the proposed site plan and
Emergency Access Easement to be dedicated.
One of the limiting factors from the past site plan review related to building
heights in excess of 30'. This requirement has been better defined in the last
2012 IFC revision, to the benefit of the applicant. Refer to Section D105 of
Appendix D for more information.
Code language and fire lane specifications provided below.
> IFC 503.1.1: Approved fire Lanes shall be provided for every facility, building
or portion of a building hereafter constructed or moved into or within the
jurisdiction. The fire apparatus access road shall comply with the requirements
of this section and shall extend to within 150 feet of all portions of the facility and
all portions of the exterior walls of the first story of the building as measured by
an approved route around the exterior of the building or facility. When any
portion of the facility or any portion of an exterior wall of the first story of the
building is located more than 150 feet from fire apparatus access, the fire code
official is authorized to increase the dimension if the building is equipped
throughout with an approved, automatic fire -sprinkler system.
> IFC D105.1: Where the vertical distance between the grade plane and the
highest roof surface exceeds 30 feet, approved aerial fire apparatus access
roads shall be provided. For purposes of this section, the highest roof surface
shall be determined by measurement to the eave of a pitched roof, the
intersection of the roof to the exterior wall, or the top of parapet walls, whichever
is greater.
FIRE LANE SPECIFICATIONS
A fire lane plan shall be submitted for approval prior to installation. In addition to
the design criteria already contained in relevant standards and policies, any
new fire lane must meet the following general requirements:
2012 International Plumbing Code (IPC) as amended by the State of Colorado
2014 National Electrical Code (NEC) as amended by the State of Colorado
Fort Collins has amendments to most of the codes listed above. See the
fcgov.com web page to view them.
Accessibility: State Law CRS 9-5 & ICC/ANSI Al17.1-2009.
Snow Load Live Load: 30 PSF / Ground Snow Load 30 PSF.
Frost Depth: 30 inches.
Wind Load: 100- MPH 3 Second Gust Exposure B.
Seismic Design: Category B.
Climate Zone: Zone 5
Energy Code Use
1. Single Family; Duplex; Townhomes: 2012 IRC Chapter 11 or 2012 IECC.
2. Multi -family and Condominiums 3 stories max: 2012 IECC residential
chapter.
3. Commercial and Multi -family 4 stories and taller: 2012 IECC commercial
chapter.
Manhattan townhomes project specific concerns:
HR 1. A P2904 or 13-D fire -sprinkler systems are required in all townhomes.
H R 2. Bedroom egress windows required below 4th floor regardless of
fire -sprinkler.
HR 3. All windows above the 1 st floor require minimum sill height of 24
HR 4. Building code and State statute CRS 9-5 requires project provide accessible
units.
HR 5. Upgraded insulation is required for buildings using electric heat or cooling.
HR 6. Exterior walls and roof must meet a STC (sound resistance) rating of 40 min.
if building located within 1000ft to train tracks.
HR 7. Low -flow Watersense plumbing fixtures (toilet, faucets, shower heads) are
required.
HR 8. Special combustion safety requirements for natural draft gas appliances.
H R 9. Low VOC interior finishes.
City of Fort Collins
Building Services
Plan Review
416-2341
Department: Light And Power
Contact: Rob Irish, 970-224-6167, rirish(a)fcqov.com
Topic: General
Comment Number: 1
Comment Originated: 06/26/2015
I: N F 06/26/2015: System modification charges will apply for any relocation or
modification to existing electric facilities.
Comment Number: 2 Comment Originated: 06/26/2015
H R 06/26/2015: The existing electric vault shown to be removed on the demolition
plan is actually a pad mount transformer. This transformer will be needed to
provide power to some of the buildings. Owner will need to coordinate a new
transformer location within 10' of an asphalt/concrete surface and all existing
Comment Number: 4 Comment Originated: 07/16/2015
H R 07/16/2015:
Distance between street trees appears to vary some. Adjust plan by providing a
regular street tree spacing or please communicate the design objective that the
project would like to achieve with some variation in spacing.
Comment Number: 5 Comment Originated: 07/16/2015
H R. 07/16/2015:
A street tree shown along Manhattan does not appear to match any symbol in
the plan list.
Comment Number: 6 Comment Originated: 07/16/2015
HR 07/16/2015:
Will mowing of the grass occur in the Buffer Enhancement Zone? If mowing is to
occur then evaluate the feasibility of placing shrubs in closely spaced groups
with the area between shrubs free of grass and mulched. Rough mowing
between individual shrubs can be challenging and often results in mower
damage to shrubs.
Comment Number: 7 Comment Originated: 07/16/2015
H R 07/16/2015:
Provide irrigation to trees and shrubs in the Buffer Enhancement Zone. Irrigation
to the trees and shrubs will be need until plants are established, which can be 5
years or more. Specify the length of time irrigation will be provided. Provide a
planting detail for trees and shrubs in the buffer enhancement zone.
Department: Internal Services
Contact: Russell Hovland, 970-416-2341, rhovland cDfcgov.com
Topic: Building Insp Plan Review
Comment Number: 1 Comment Originated: 07/10/2015
] N F 07/10/2015.
Pre -Submittal meetings are offered to assist the designer/builder by assuring,
early on in the design,
that the new commercial or multi -family projects are on track to complying with
all of the adopted City
codes and Standards listed below. The proposed project should be in the early
to mid -design stage for
this meeting to be effective and is typically scheduled after the Current Planning
conceptual review
meeting. Applicants of new commercial or multi -family projects are advised to
call 416-2341 to schedule
a pre -submittal meeting. Applicants should be prepared to present site plans,
floor plans, and elevations
and be able to discuss code issues of occupancy, square footage and type of
construction being proposed.
Construction shall comply with the following adopted codes as amended:
2012 International Building Code (IBC)
2012 International Residential Code (IRC)
2012 International Energy Conservation Code (IECC)
2012 International Mechanical Code (IMC)
2012 International Fuel Gas Code (IFGC)
applicant to meet the total area buffer requirements. Initially, we had discussed
a permanent easement for this area for the landscaping and associated
maintenance. Recent discussions with Stormwater have led us away from this
idea and instead we would like to see the applicant establish and maintain the
landscaping for a period of at least three years until it reaches an agreed upon
level of success, at which point the continued maintained will be turned over to
Stormwater.
Comment Number: 2
Comment Originated: 07/15/2015
H R 07/15/2015: Please see notes on landscape plan for buffer area to the south.
Suggestions include: 1.) activating the western spur with chokecherry, plums, as
well as possibly Twinberry honeysuckle and thimbleberry 2.) Avoid shading
shrubs and other plants with cottonwoods - chokecherry o.k. 3.) Move junipers
up away from the wetland edge and move moisture -loving plants down 4.)
Cluster rabbitbrush, snowberry, sumac and juniper to create and informal edge
with some gaps/view sheds 5.) Don't shade rabbitbrush 6.) currant,
chokecherry, and plum in the moisture transition area and move cottonwoods
closer to edge of wetland
HR Comment Number: 3 Comment Originated: 07/15/2015
07/15/2015: As for buffer enhancement plantings on Stormwater property: 1.)
Do not plant trees and shrubs in a line but cluster appropriately for the plants
moisture/shade requirements and to allow for mowing and maintenance 2.) Do
not plant cottonwoods and plums together, nor junipers and cottonwoods
together 3.) Cluster juniper with rabbitbrush, as well as possibly red osier
dogwood, sand cherry 4.) Instead of rabbitbrush in the northwest corner of this
area along edge, suggest wood's rose, snowberry and/or shrubby cinquefoil
Department: Forestry
Contact: Tim Buchanan, 970-221.6361, tbuchananga fcgov.com
Topic: Landscape Plans
H.)^,'. Comment Number: 1
Comment Originated: 07/16/2015
07/16/2015:
Use the newly developed landscape and other project notes on this
development. Notes are available from the City Planner.
Comment Number: 2
Comment Originated: 07/16/2015
H R 07/16/2015:
Show the accurate location of all existing trees. Identify existing trees by number
with species, size, condition, mitigation and intent to save, remove or transplant
stated. Some trees are of a transplantable size and should be closely evaluated
for transplanting on the project. Provide required number of upsized mitigation
trees.
Shade trees 3.0 inch caliper
Omamental trees 2.5 inch caliper
Conifer trees 8 feet height
Comment Number: 3 Comment Originated: 07/16/2015
R 07/16/2015.
Show locations of any street lights and space street trees away from street
lights to LUC standard 3.2.1 K.
redlines for locations.
H R Comment Number: 4 Comment Originated: 07/15/2015
07/15/2015: A portion of the trail sits outside of the existing 8' trail easement.
See redlines. This portion may need to be dedicated as an alignment. The
portion not used may need to be vacated as well.
HR Comment Number: 5 Comment Originated: 07/15/2015
07/15/2015: Please work with PFA to determine if internal streets will need to
be named. Please label these streets as Private Drives. Signs will need to be
posted to state that the private drives will be privately maintained.
H,R Comment Number: 6 Comment Originated: 07/15/2015
07/15/2015: A section of sidewalk next to lot 36 sits offsite. An offsite
easement will be needed.
HR Comment Number: 7
Comment Originated: 07/15/2015
07/15/2015: Permeable Pavers are not allowed in the 9' utility easement along
Manhattan Avenue. Please remove and recalculate area needed for permeable
pavers. A concrete collar will be needed at the edge of pavers at these
driveways.
HR Comment Number: 8
Comment Originated: 07/15/2015
07/15/2015: Since the portion to the south was part of the original plat, please
replace the small section of ribbon curb with vertical curb. See redlines.
H R Comment Number: 9 Comment Originated:
07/15/2015
07/15/2015: Please relabel the callout for an existing 30' Utility Easement as a
30' Utility Alignment. See redlines.
HR Comment Number: 10 Comment Originated:
07/15/2015
07/15/2015: The minimum gutter flowline grade is 0.5%. Please adjust.
HR Comment Number: 11 Comment Originated:
07/15/2015
07/15/2015: Please provide the striping plan for Manhattan Avenue. The
striping boundaries will need to be extended further north and south of the
property to show the transitions from a shared bike/parking lane to separate
bike and parking lanes. It is difficult to determine if the existing layout will work.
HR Comment Number: 12 Comment Originated:
07/15/2015
07/15/2015: It appears that the cross section of Manhattan Avenue as shown
on Sheet R1 is significantly less for the roadway to the south of the property. It
looks like it is about 1.67' less in this area. Did the roadway centerline change?
The cross section shown, shows a EOP width of 47.67, which no cross section
along the property meets this width.
HR Comment Number: 13 Comment Originated:
07/15/2015
07/15/2015: Please label ROW widths along Manhattan Avenue.
Department: Environmental Planning
Contact: Kelly Kimple, kkimple 5ftgov.com
Topic: General
Comment Number: 1
Comment Originated: 07/15/2015
H R 07/15/2015: As the applicant is not able to meet a standard 100' buffer for the
wetland, discussions with Stormwater have allowed for enhancements to
Stormwater property to the east of the development, which will allow the
Comment Number: 1 Comment Originated: 07/14/2015
HR 07/14/2015. Site Plan: Placing the buildings closer than the 15 foot building
setback will require a modification to this standard or alternative compliance.
How does the design mitigate the visual impacts of closer proximity to the
street, and how is the design equal to/better than a 15 foot setback?
Comment Number: 2 Comment Originated: 07/14/2015
rH R 07/1412015: We would like to see more refinement of the landscape plan, and
this can be part of the justification for comment 1. We need more evergreen
material and a stronger, more distinctive building foundation landscape
concept. A less is more approach might be a nice look where there's a mix of
cobble sizes in larger beds combined with a looser mix of plant material, and
with the material further away from the building foundations where possible.
This isn't the only approach, you could do standard mulch. Mainly we just need
the landscape plan to include more variety and significantly more evergreen
material. Also, the plan is very busy at 1.30 and very difficult to read the
different symbols with all of the other information (mulch hatching, etc.).
Comment Number: 3
Comment Originated: 07/14/2015
H P, 07/14/2015: Please see building elev. redlines. Also please show where the
AC units and meters will be located on the elevs. and all other plans, and how
they will be screened. This is mentioned in the planning objectives that this will
be architectural? If on the ends of the buildings this could be a feature to add
variety/visual interest to the building ends? For the formatting of the elevation drawings, the sheets need to
be to be drafted with linework only and include detailed materials notes and/or a material schedule. The
color elevations can be used with the PDP set in conjunction with the line drawings and also as a part of
the hearing presentation, but they need to be higher resolution. A material sample
board is also required that also includes paint samples.
Comment Number: 4 Comment Originated: 07/14/2015
[-: 07/14/2015: Buildings F and G are not served by a design that qualifies as a
major walkway spine. We would need to process a modification for this and
also connect the sidewalk east of the buildings.
Comment Number: 5 Comment Originated: 07/14/2015
H R 07/14/2015: The land use code supports the trail connection as a requirement
of the project, as a mid -block connection and in support of LUC 3.2.2.(C)(6) and
(7). This development project would be required to provide the final design and construction of the trail
spur. No payments were made to the city for this work with the past approval. Please acknowledge.
Department: Engineering Development Review
Contact: Marc Ragasa, 970.221.6603, mragasa(cDfcgov.com
Topic: General
HR Comment Number: 1 Comment Originated: 07/15/2015
07/15/2015: Sheets D1-D5 have different sheet titles than what is listed on the
Sheet Index. Please rename sheet titles to match sheet index
HR Comment Number: 2 Comment Originated: 07/15/2015
07/15/2015: The existing concrete patches in Manhattan Avenue need to be
replaced with asphalt.
HR Comment Number: 3 Comment Originated: 07/15/2015
07/15/2015: Access easements need to be depicted as to be vacated. See
Fort Collins
Community Development and
Neighborhood Services
281 North College Avenue
PO Box 580
Fort Collins, CO 80522
970.221.6750
970,224.6134 - fax
fcgov. com/developmentreview
July 20, 2015
Russell Baker
MANHATTAN LAND COMPANY, LLC
772 WHALERS WAY STE 200
Fort Collins, CO 80525
RE: Manhattan Townhomes Second Filing, FDP150021, Round Number 1
Please see the following summary of comments from City staff and outside reviewing
agencies for your submittal of the above referenced project. If you have questions about
any comments, you may contact the individual commenter or direct your questions through
the Project Planner, Jason Holland, at 970-224-6126 or Iholland a()fcgov.com.
Review Reference Code:
The following key code is included next to each staff comment or department category.
Please use this as reference when addressing comments.
INIF — COMMENT IS PROVIDED FOR YOUR INFORMATION, AND MUST BE
ADDRESSED WITH SUBSEQUENT PERMIT APPROVALS OR AGREEMENTS.
PLEASE RESPOND WITH THE INITIAL ROUND OF REVIEW AND NO ADDITIONAL
RESPONSE IS REQUIRED WITH SUBSEQUENT REVIEW.
HR — COMMENT MUST BE RESOLVED PRIOR TO SCHEDULING A HEARING.
FN — COMMENT MUST BE RESOLVED PRIOR TO MYLAR.
UNR — COMMENT REMAINS UNRESOLVED AND ADDITIONAL RESPONSE AND
REVISION IS REQUIRED PRIOR TO MYLAR ACCEPTANCE.
R=ES — COMMENT APPEARS TO BE RESOLVED AND NO FURTHER RESPONSE
OR REVISION IS REQUIRED PRIOR TO MYLAR ACCEPTANCE.
Comment Summary:
Department: Planning Services
Contact: Jason Holland, 970-224-6126, jholland(o)fcgov.com
Topic: General