Comment Number: 3 Comment Originated: 12/16/2015
12/16/2015: The fire hydrant is required to be within the utility easement.
Comment Number: 4
Comment Originated: 12/16/2015
12/16/2015: The meter pit for the 3-inch service is a vault per the City detail.
Please show this vault on the utility plan with the correct dimensions to verify
enough space is being provided.
11
Comment Number: 25 Comment Originated: 12/14/2015
12/14/2015: There is text that needs to be masked. Mask all text in hatched
areas. See redlines.
Comment Number: 26 Comment Originated: 12/14/2015
12/14/2015: There are duplicated text issues. See redlines.
Department: Traffic Operation
Contact: Martina Wilkinson, 970-221-6887, mwilkinson@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 12/17/2015
12/17/2015: The submitted traffic study information has been reviewed and the
conclusions accepted.
Comment Number: 2 Comment Originated: 12/17/2015
12/17/2015: Note that the western access needs to be physically restricted to
create a right -in, right -out. A center median is preferred.
Comment Number: 3
Comment Originated: 12/17/2015
12/17/2015: Can you provide a striping plan to show the eastbound left turn on
Rock Creek?
Department: Water Conservation
Contact: Eric Olson, 970-221-6704, eolson@fcgov.com
Topic: General
Comment Number: 1
Comment Originated: 12/08/2015
12/08/2015: Perovskia Atriplicifolia (Russian Sage) has been removed from
the City of Fort Collins Plant List. Please replace with a plant variety from the
current list. If you have questions contact Eric Olson at eolson@fcgov.com or
970-221-6704.
Comment Number: 2
Comment Originated: 12/08/2015
12/08/2015: Irrigation plans are required no later than at the time of building
permit. The irrigation plans must comply with the provisions outlined in Section
3.2.1(J) of the Land Use Code. Direct questions concerning irrigation
requirements to Eric Olson, at 221-6704 or eolson@fcgov.com
Department: Water -Wastewater Engineering
Contact: Wes Lamarque, 970-416-2418, wlamargue@fcgov.com
Topic: General
Comment Number: 1
Comment Originated: 12/16/2015
12/16/2015: Please provide a full design for the 24-inch waterline with all
design features labeled. Water mains 12-inches and larger require plan and
profiles.
Comment Number: 2 Comment Originated: 12/16/2015
12/16/2015: The 3-inch domestic service is required to be a 4-inch tap, 4-inch
gate valve, and a 4x3 reducer. Please label service per City standards on the
10
12/14/2015: There are line over text issues. See redlines.
Comment Number: 11 Comment Originated: 12/14/2015
12/14/2015: There is text that needs to be masked. Mask all text in hatched
areas. See redlines.
Topic: Plat
Comment Number: 12 Comment Originated: 12/14/2015
12/14/2015: Please make sure all plat language is current.
Comment Number: 13 Comment Originated: 12/14/2015
12/14/2015: Are there any Lienholders for this property? If so, please add a
signature block. If not, please add a note stating there are none, and include
response in written comments.
Comment Number: 14 Comment Originated: 12/14/2015
12/14/2015: Please provide current acceptable monument records for the
aliquot corners shown. These should be emailed directly to Jeff at
jcounty@fcgov.com
Comment Number: 15 Comment Originated: 12/14/2015
12/14/2015: Please label all surrounding properties with "Unplatted" or the
subdivision name. This includes properties across right of ways. See redlines.
Comment Number: 16 Comment Originated: 12/14/2015
12/14/2015: Please add dedication information for all street rights of way. See
redlines.
Comment Number: 17 Comment Originated: 12/14/2015
12/14/2015: All curves must have 5 pieces of data per submittal requirement
3(c). See redlines.
Comment Number: 18 Comment Originated: 12/14/2015
12/14/2015: What is the status of the Temporary Construction, Grading & Utility
Easement (Rec. 20150029090) along Precision Drive? If it is still valid, it must
be locatable.
Comment Number: 19 Comment Originated: 12/14/2015
12/14/2015: Please move all boundary information to the outside of the
boundary per submittal requirement 3(c).
Comment Number: 20 Comment Originated: 12/14/2015
12/14/2015: All easements must be labeled & locatable. See redlines.
Comment Number: 21 Comment Originated: 12/14/2015
12/14/2015: Who owns & maintains Outlot A? What is the usage?
Topic: Site Plan
Comment Number: 22 Comment Originated: 12/14/2015
12/14/2015: There are line over text issues. See redlines.
Comment Number: 23 Comment Originated: 12/14/2015
12/14/2015: There is text that needs to be rotated 180 degrees. See redlines.
Comment Number: 24 Comment Originated: 12/14/2015
12/14/2015: There are text over text issues. See redlines.
9
Comment Number: 1
12/14/2015: No comments.
Topic: Construction Drawings
Comment Number: 2
Comment Originated: 12/14/2015
Comment Originated: 12/14/2015
12/14/2015: The City has moved to the NAVD88 vertical datum, and as of
January 1, 2015 all projects are required to be on NAVD88 datum. Please
provide the following information in the EXACT format shown below.
PROJECT DATUM: NAVD88
BENCHMARK # w/ DESCRIPTION
ELEVATION:
BENCHMARK # w/ DESCRIPTION
ELEVATION:
PLEASE NOTE: THIS PLAN SET IS USING NAVD88 FOR A VERTICAL
DATUM. SURROUNDING DEVELOPMENTS HAVE USED NGVD29
UNADJUSTED FOR THEIR VERTICAL DATUMS.
IF NGVD29 UNADJUSTED DATUM IS REQUIRED FOR ANY PURPOSE,
THE FOLLOWING EQUATION SHOULD BE USED: NGVD29 UNADJUSTED
= NAVD88 - X.XX'.
Comment Number: 3 Comment Originated: 12/14/2015
12/14/2015: All benchmark statements need to match on all sheets.
Comment Number: 4 Comment Originated: 12/14/2015
12/14/2015: There are line over text issues. See redlines.
Comment Number: 5 Comment Originated: 12/14/2015
12/14/2015: Please correct the sheet number on sheet 6. See redlines.
Comment Number: 6 Comment Originated: 12/14/2015
12/14/2015: There is text that needs to be rotated 180 degrees. See redlines.
Comment Number: 7 Comment Originated: 12/14/2015
12/14/2015: There is text that needs to be masked. Mask all text in hatched
areas. See redlines.
Comment Number: 8 Comment Originated: 12/14/2015
12/14/2015: Please tie the coordinate values shown for utilities to the project
boundary. We would prefer that this be done by adding property corner values
to each sheet, or showing the property corner values on the horizontal control
plans and adding a note to each sheet with coordinate values.
Comment Number: 9 Comment Originated: 12/14/2015
12/14/2015: There are text over text issues. See redlines.
Topic: Landscape Plans
Comment Number: 10
M
Comment Originated: 12/14/2015
responses to the facility. See comment #2 below.
Comment Number: 2 Comment Originated: 12/09/2015
12/09/2015: FIRE ACCESS
While fire access at the south entrance may not need to be dedicated in order
to meet minimum access requirements by code, the project team should bear in
mind that one engine and at least one ambulance will respond to all medicals at
the facility. Prior experience with other assisted care facilities in the area would
suggest this will be a regular occurrence and the final access plan should allow
for room needed to park both an engine and ambulance in close proximity to the
access entrance. This access point need not be the front door but in most
facilities, it is. Further discussion is needed.
Comment Number: 3
Comment Originated: 12/09/2015
12/09/2015: FIRE ACCESS TERMINUS AT NORTH LOT LINE
The fire marshal has approved the plan to create 340' dead-end fire lane with
the provision that it will ultimately connect with the adjacent lot to the north. What
needs to be done now to assure this connectivity will take place in the future?
Department: Stormwater Engineering
Contact: Jesse Schlam, 970-218-2932, jschlam@fcgov.com
Topic: Erosion Control
Comment Number: 1 Comment Originated: 12/07/2015
12/07/2015: The site disturbs more than 10,000 sq-ft, therefore Erosion and
Sediment Control Materials need to be submitted for FDP. The erosion control
requirements are in the Stormwater Design Criteria under the Amendments of
Volume 3 Chapter 7 Section 1.3.3. Current Erosion Control Materials
Submitted do not meet requirements. Please submit; Erosion Control Plan,
Erosion Control Report, and an Escrow / Security Calculation. If you need
clarification concerning the erosion control section, or if there are any questions
please contact Jesse Schlam 970-218-2932 or email @ jschlam@fcgov.com
Contact: Wes Lamarque, 970-416-2418, wlamargue@fcgov.com
Topic: General
Comment Number: 2 Comment Originated: 12/16/2015
12/16/2015: The detention pond sizing needs to be calculated using the City's
rainfall and method. This may increase the volume slightly compared to what is
being proposed.
Comment Number: 3
Comment Originated: 12/16/2015
12/16/2015: Clarification is needed regarding the LID table in the plan set to
confirm the PDP is meeting the LID requirements.
Comment Number: 4 Comment Originated: 12/16/2015
Drainage easements are required for the water quality and quantity detention
basins.
Department: Technical Services
Contact: Jeff County, 970-221.6588, (county@fcgov.com
Topic: Building Elevations
7
Contact: Rob Irish, 970-224.6167, rirish@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 12/15/2015
12/15/2015: Electric Capacity Fee and Building Site charges will apply to this
development. Please click on the following link for Estimated Light & Power
charges and the Light & Power Fee calculator.
http://www.fcgov.com/utilities/business/builders-and-developers/plant-investmen
t-development-fees
Comment Number: 2 Comment Originated: 12/15/2015
12/15/2015: Light & Power has existing electric facilities located along the S.
side of Rock Creek Drive and along the W. side of Ziegler Road. Power will
need to be brought across Rock Creek Dr. to feed this site and extended North
along Ziegler Rd. to feed future development.
Comment Number: 3 Comment Originated: 12/15/2015
12/15/2015: Any relocation or modification to existing electric facilities will incur
system modification charges.
Comment Number: 4 Comment Originated:
12/15/2015: Transformer and meter locations will need to be coordinated with
Light & Power Engineering. Transformer location needs to be within 10' of an
asphalt surface accessible by a line truck. A minimum clearance of 8' must be
maintained in front of the transformer doors and a minimum of 3' on the sides
and back. Certain building materials and or building design may require more
clearance. Please click on the following link for Electric Construction, Policies,
Practices and Procedures.
http://www.fcgov.com/utilities/business/builders-and-developers/development-fo
rms-guidelines-regulations
Comment Number: 5 Comment Originated:
12/15/2015: The proposed transformer location on the Site plan will need to be
modified to meet the clearance requirements in front of the doors and
accessibility requirements.
Comment Number: 6 Comment Originated:
12/15/2015: A C-1 Form and a One -line diagram will need to be submitted to
Light & Power Engineering for review. Please click on the following link for the
C-1 Form.
http://www.fcgov.com/utilities/business/builders-and-developers/development-fo
rms-guidelines-regulations
Department: PFA
Contact: Jim Lynxwiler, 970416-2869, iynxwiler@aoudre-fire.org
Topic: General
Comment Number: 1
12/15/2015
12/15/2015
12/15/2015
Comment Originated: 12/09/2015
12/09/2015: EMERGENCY ACCESS EASEMENT
Please label the Emergency Access Easement on the plat as an EAE rather
than EA. The EAE stub south of the main entrance, off of Rock Creek Dr. is not
required, however a broader discussion is needed with regard to medical
all of the adopted amity
codes and Standards listed below. The proposed project should be in the early
to mid -design stage for
this meeting to be effective and is typically scheduled after the Current Planning
conceptual review
meeting. Applicants of new commercial or multi -family projects are advised to
call 416-2341 to schedule
a pre -submittal meeting. Applicants should be prepared to present site plans,
floor plans, and elevations
and be able to discuss code issues of occupancy, square footage and type of
construction being proposed.
Construction shall comply with the following adopted codes as amended:
2012 International Building Code (IBC)
2012 International Residential Code (IRC)
2012 International Energy Conservation Code (IECC)
2012 International Mechanical Code (IMC)
2012 International Fuel Gas Code (IFGC)
2012 International Plumbing Code (IPC) as amended by the State of Colorado
2014 National Electrical Code (NEC) as amended by the State of Colorado
Fort Collins has amendments to most of the codes listed above. See the
fcgov.com web page to view them.
Accessibility: State Law CRS 9-5 & ICC/ANSI A117.1-2009.
Snow Load Live Load: 30 PSF / Ground Snow Load 30 PSF.
Frost Depth: 30 inches.
Wind Load:100- MPH 3 Second Gust Exposure B.
Seismic Design: Category B.
Climate Zone: Zone 5
Energy Code Use
1. Single Family; Duplex; Townhomes: 2012 IRC Chapter 11 or 2012 IECC.
2. Multi -family and Condominiums 3 stories max: 2012 IECC residential
chapter.
3. Commercial and Multi -family 4 stories and taller: 2012 IECC commercial
chapter.
Windsong at rock creek— project specific concerns:
1. Fire -sprinkler systems are required. A new code amendment effective in
2014 will require a full NFPA-13 sprinkler system and not allow a 13-R system.
2. Bedroom egress windows required below 4th floor regardless of
fire -sprinkler.
3. Building code and State statute CRS 9-5 requires project provide accessible
units.
4. Upgraded insulation is required for buildings using electric heat or cooling.
6.
7. Low -flow Watersense plumbing fixtures (toilet, faucets, shower heads) are
required.
8. Special combustion safety requirements for natural draft gas appliances.
9. Low VOC interior finishes.
Department: Light And Power
onsite and has been consistently parking along Rule Drive, which, has the
capability for on -street parking, while Rock Creek Drive here, does not.
Comment Number: 9 Comment Originated: 12/16/2015
12/16/2015: Please label on the horizontal control plan for the civil set and also
the site and landscape plans, the widths of both the sidewalks and parkways
along Rock Creek Drive and Ziegler Road.
Topic: Plat
Comment Number: 10
Comment Originated: 12/16/2015
12/16/2015: The plat language for certificate of dedication along with the
maintenance and repair guarantee is outdated and needs to be updated to the
current language.
Contact: Sheri Langenberger, 970-221-6573,
Topic: General
Comment Number: 1
slangenberger@fcgov.com
Comment Originated: 11/27/2015
11/27/2015: The TDRF paid were not based on the area being platted. As
such an additional $3,840.35 is due for the PDP fees.
Department: Environmental Planning
Contact: Rebecca Everette, 970-416-2625, reverette@fcgov.com
Topic: Landscape Plans
Comment Number: 1
Comment Originated: 12/09/2015
12/09/2015: Please provide the species to be used in the prairie wetland seed
mix for review. I can work with the Natural Areas Department to develop
customized seed mixes for this site, if that interests you.
Comment Number: 2
Comment Originated: 12/09/2015
12/09/2015: For the blended lawn areas, please use a seed mix that does not
contain smooth brome or other invasive species.
Topic: Lighting Plan
Comment Number: 3
Comment Originated: 12/09/2015
12/09/2015: For the light fixtures, please clarify the intended color temperature
for each fixture. The labels do not appear to match up between the lighting plan
and the cut sheets that were provided. Cooler color temperatures are harsher at
night and cause more disruption to circadian rhythms for both humans and
wildlife. Please use warmer color temperature options (2700K or 3000K) for the
LED light fixtures. Please also consider fixtures with dimming capabilities.
Department: Internal Services
Contact: Russell Hovland, 970-416-2341, rhovland@fcgov.com
Topic: Building Insp Plan Review
Comment Number:
Comment Originated: 12/15/2015
12/15/2015:
Building Permit Pre -Submittal Meeting:
Pre -Submittal meetings are required to assist the designer/builder by assuring,
early on in the design,
that the new commercial or multi -family projects are on track to complying with
4
Comment Number: 15.
Comment Originated: 12/16/2015
12/16/2015: As mentioned at Conceptual Review, with the advantage of having
a southern exposure, the mechanical systems of the facility should be designed
to be "solar ready' should the decision be made to install solar equipment.
Department: Engineering Development Review
Contact: Marc Virata, 970-221-6567, mvirata@fcgov.com
Topic: Construction Drawings
Comment Number: 2 Comment Originated: 12/16/2015
12/16/2015: Please provide an overall context map depicting the full -width of
Rock Creek Drive and show what is the offset between the new north -south
drive aisle and the Fossil Ridge driveway.
Comment Number: 3
Comment Originated: 12/16/2015
12/16/2015: The full -width context of Rock Creek Drive and Fossil Ridge
Driveway should then also show how a left turn lane is provided for eastbound
Rock Creek to the northbound private drive as noted in the traffic study.
Comment Number: 4
Comment Originated: 12/16/2015
12/16/2015: Please depict/indicate that the portions of the two driveways in
right-of-way are constructed in concrete.
Comment Number: 5 Comment Originated: 12/16/2015
12/16/2015: Larimer County's Approval Block on the civil plans should be
removed.
Topic: General
Comment Number: 6
Comment Originated: 12/16/2015
12/16/2015: The site's direct access onto Rock Creek Drive should be limited
to right -on, right -out per the traffic study. It appears to be full access (unless a
median in Rock Creek Drive is proposed). Additional clarification is needed. It
would seem that the access could be changed to right -out only, as main access
into the site could occur from the main north -south private drive.
Comment Number: 7
Comment Originated: 12/16/2015
12/16/2015: Please show split directional access ramps and truncated dome
detection for the northeast corner of Rock Creek Drive and Ziegler Road.
Additionally, please depict access ramps with truncated dome detection for the
east -west movement across the main north -south private drive at Rock Creek
Drive (this includes the access ramp on the east side of that driveway).
Comment Number: 8
Comment Originated: 12/16/2015
12/16/2015: The new north -south drive -aisle intended to be shared with future
development of the MAVD overall property is private and not reviewed for
roadway design by Engineering. Given however that there is no parking allowed
along the street frontages for the project (Rock Creek Drive and Ziegler Road)
for spillover parking situations, and there are two disjointed parking fields for
this project, connected by this drive aisle, I'm wondering if the 24 foot width for
two way traffic should be widened to at least accommodate onstreet parking on
the west side of the drive -aisle in between the two parking lot/driveways. We've
had a previous long term care facility also along an arterial roadway (Lemay
Avenue and Rule Drive) that has shown their parking needs not being met
3
Precision Drive and Rock Creek Drive. Combined, this streetscape is 800 feet
in length. Toward this end, please reduce the quantity of Wichita Blue Black
Hills Spruce and add Fastigiate Norway Spruce. Note that we are asking Eye
Center to make a similar adjustment to match your Wichita Blue's.
Comment Number: 5. Comment Originated: 12/16/2015
12/16/2015: Staff recommends enriching the mix of Evergreen Trees by adding
the Colorado Blue Spruce to the Landscape Plan, particularly along Ziegler
Road.
Comment Number: 6.
Comment Originated: 12/16/2015
12/16/2015: On the Wall / Berm Detail, why can't the screen wall simply carry
across the Cement Board Siding (Horiz. — 7" Reveal) to match the building's
siding (upper portion)? On the Elevations sheet, the screen wall detail indicates
"siding to match building" but on the detail, the siding is different.
Comment Number: 7. Comment Originated: 12/16/2015
12/16/2015: On the Site Lighting Plan Schedule, please add a column for
Quantity.
Comment Number: 8. Comment Originated:
12/16/2015
12/16/2015: Please label the westerly driveway as Right-in/Right-out Only, or
Right -out Only, depending on how this issue is resolved based on the Rock
Creek Striping Plan to be submitted to Engineering.
Comment Number: 9. Comment Originated:
12/16/2015
12/16/2015: Please label the "Column and Trellis" feature at the next to the
westerly drive -way.
Comment Number: 10. Comment Originated:
12/16/2015
12/16/2015: At the time of submittal for Final Plan, please provide a detail for
the retaining wall. We need to see the height of the wall and type of material
selected for the wall.
Comment Number: 11. Comment Originated:
12/16/2015
12/16/2015: Please add "Recycling" to the label for the "Refuse Enclosure."
Comment Number: 12. Comment Originated:
12/16/2015
12/16/2015: The 25-foot E.A.E. in the northwest comer is needed to serve both
the subject site and the Eye Center of Northern Colorado to the north. This
E.A.E. will be matched with the Eye Center. Please extend the hard surface
north to the property line. The consulting engineers for both projects need to
make sure that the grading and elevation of the two drives align both horizontally
and vertically.
Comment Number: 13. Comment Originated:
12/16/2015
12/16/2015: Along both Ziegler and Rock Creek, there are a series of
Ornamental Trees that must be changed to Street Trees. Ornamentals in the
parkway are to be used only in the case of being placed 15 from street lights.
Otherwise, all trees in the parkway must be Street Trees.
Comment Number: 14. Comment Originated:
12/16/2015
12/16/2015: Will the facility allow for pet therapy visits? If so, please provide a
waste station (plastic bags dispenser, trash container, etc.) in the vicinity of the
front entrance.
010
City of
art Collins
Community Development and
Neighborhood Services
281 North College Avenue
PO Box 580
Fort Collins, CO 80522
970.221.6750
970.224.6134 - fax
kgov. com/developmentreview
December 18, 2015
Lenity Architecture/JR Engineering
3150 Kettle Ct SE
Salem, OR 97301
RE: Windsong at Rock Creek, PDP150024, Round Number 1
Please see the following summary of comments from City staff and outside reviewing
agencies for your submittal of the above referenced project. If you have questions about
any comments, you may contact the individual commenter or direct your questions through
the Project Planner, Ted Shepard, at 970-221-6343ortshepard@fcgov.com.
Comment Summary:
Department: Planning Services
Contact: Ted Shepard, 970-221-6343, tshepard@fcgov.com
Topic: General
Comment Number: 1.
Comment Originated: 12/16/2015
12/16/2015: We have two plats in at the same time. Windsong at Rock Creek
contains 18.7 acres and includes Outlot A at 15.36 acres. But, concurrently, we
have a plat in for Eye Center of Northern Colorado, immediately north of
Windsong, which is a portion of Outlot A, but does not indicate that it is a
"Replat of a Portion of Outlot A of Windsong at Rock Creek." Both plats include
overlapping land area. The plats indicate that the owner is Harmony
Technology Park LLC. The owner should be aware that these two plats need to
be rectified. Perhaps one plat could take precedence over. Or, has the owner
considered consolidating these two plats into one?
Comment Number: 2. Comment Originated: 12/16/2015
12/16/2015: The site plan needs to match the plat by graphically indicating the
location and calling out the dimensions of all Emergency Access Easements.
Comment Number: 4.
Comment Originated: 12/16/2015
12/16/2015: Staff is coordinating the streetscaping along Ziegler Road
between both Windsong the development proposal to the north, Eye Center of
Northern Colorado, in order to establish a high quality landscape between