Loading...
HomeMy WebLinkAboutARROWHEAD COTTAGES - MJA/FDP - FDP160004 - REPORTS - STORMWATER-RELATED DOCUMENTS (3)caa emdxcs s x PWMVArM _ / t A 0 Ol]f.t6 (NORTHERN ENGINEERING IEoeNo: vwa®maaw —.� EAEIYp fbllM — —. — — EnE�E.osrcaiawea woea®amM Mv¢� reertixev�veu {BlEI6EP/.YHIE .E'Eib1F..E.16,� �1 IMHEf� 1 Mtll• tlRlT 50% On -Site Treatment by UD Requirement New On -Site Impervious Area 0.495 1 Ac. Paver Area Traditional Pa eme r .11 Ac. Other Impervious Su aces Roo s, Concrete Walks, etc. 0.336 Ac. Require Minimum Impervious Area to be Treated 0.247 Paver LID Treatment Paver area 0.041 Ac. Run-on area for P r 0,016 Ac. Im ervious Area TreateJ by LID Pavers 0,058 Ac. Rain Garden Treatment Impervious Area Treated y Rain Garden Q.086 Ac. Bio Swale with So Bottom Treatment Impervious Area Treate b 0io Swa a 0.104 Ac. Total On -Site Im ervious Area Treated 0.247 Ac. Percent o On.Site Impervious Area Treated 50.0 % 25% Permeable Pavement Requirement New Pv m n r a .15 Required Minimum Area o Permeable Pavement 1 Ac.. To al Perm all P m n r A. Actual %of Permeable Pavement Provided 2 .1 1 % ARROWHEAD COTTAGES FORT COLLINS, CO NORTHERN ENGINEERING Arrowhead Cottages An exhibit has been provided to illustrate the topics outlined, and calculations supporting the LID techniques. Please feel free to contact me if you have any questions. Sincerely, Danny Weber, PE Project Engineer ATTACHMENTS: Low Impact Development (LID) Treatment Exhibit LID Report NORTHERN ENGINEERING LID Conformance Report Date: March 25, 2016 Project: Arrowhead Cottages Fort Collins. CO Attn: Stormwater Staff City of Fort Collins Stormwater Utility 700 Wood Street Fort Collins, CO 80521 Stormwater Staff: Project No. 374-020 This letter serves to document conformance of the above referenced project with City of Fort Collins Low Impact Development (LID) requirements. In particular, the project is meeting Section 3.1 of the Fort Collins Stormwater Amendments to the Urban Drainage and Flood Control District Criteria Manual, including Section 3.1 (a)(1) requiring that no less than 50% of any newly added impervious area be treated using one or more LID techniques and Section 3.1(a)(2) requiring that no less than 25% of all new paving use a permeable pavement technology that is considered an LID technique. Section 3.1(a)(1) The project as a whole is proposing 0.495 acres of new on -site impervious area. This results in a minimum required LID treatment area of 0.247 acres. The project is treating 0.058 acres of on -site impervious area by pavers (directly or indirectly). 0.041 acres of permeable pavers will receive 0.016 acres of adjacent impermeable runoff. The project is treating 0.086 acres of on -site impervious areas using a Rain Garden. Roof drains will be collected by an underground storm sewer system and direct runoff from these areas to a rain garden located immediately west of the garage. This rain garden will be adequately sized to treat stormwater during a minor event. During larger events, the rain garden will overtop into the existing nearby detention facility. The project is treating 0.098 acres of on -site impervious area using a Bio-swale with Soft Bottom. The primary source of impervious area is the south half of Building 2, which will directly drain into the Bio-swale Low Impact Design feature. The bio-swale will have a designed section that will treat stormwater during minor events. An underdrain will collect the treated stormwater and discharge into the Centre Avenue Right - of -Way. Larger events will overtop directly into the adjacent Centre Avenue Right -of -Way. The total on -site project area treated by LID techniques is 0.247 acres, which is 50.0% of the total new impervious area. Section 3.1(a)(2) The project as a whole is proposing 0.159 acres of new impervious paving. This results in a minimum required permeable paving area of 0.040 acres. The project has evaluated various areas for pavers to provide LID treatment to multiple areas of the Site. The total area of permeable pavers provided by the project is 0.041 acres, which is 26.1% of the total new paving. 301 N. Howes Street, Suite 100, Fort Collins, CO 80521 1 970.221.4158 I www.northernengineering.com