Loading...
HomeMy WebLinkAboutMITSUBISHI @ 2712 S. COLLEGE AVE. - MJA - MJA120007 - CORRESPONDENCE - (5)Snow Load Live Load: 30 P& . Ground Snow Load 30 PSF. Frost Depth: 30 inches. Wind Load: 100- MPH 3 Second Gust Exposure B. Seismic Design: Category B. Climate Zone: Zone 5 Energy Code Use 1. Single Family; Duplex; Townhomes: 2009 IRC Chapter 11 or 2009 IECC Chapter 4 2. Multi -family and Condominiums 3 stories max: 2009 IECC Chapter 4. 3. Commercial and Multi -family 4 stories and taller: 2009 IECC Chapter 5. Fort Collins Green Code Amendments effective starting 1-1-2012. A copy of these requirements can be obtained at the Building Office or contact the above phone number. City of Fort Collins Building Services Plan Review 416-2341 City staff, would be prr,_ ,,it to facilitate the meeting. 3. Please see the Development Review Guide at www.fcgov.com/drg. This online guide features a color coded flowchart with comprehensive, easy to read information on each step in the process. This guide includes links to just about every resource you need during development review. 4. This development proposal will be subject to all applicable standards of the Fort Collins Land Use Code (LUC), including Article 3 General Development Standards. The entire LUC is available for your review on the web at http://www.colocode.com/ftcolIins/Ianduse/begin.htm. 5. If this proposal is unable to satisfy any of the requirements set forth in the LUC, a Modification of Standard Request will need to be submitted with your formal development proposal. Please see Section 2.8.2 of the LUC for more information on criteria to apply for a Modification of Standard. 6. Please see the Submittal Requirements and Checklist at: http://www.fcgov.com/developmentreview/applications.php. The request will be subject to the Development Review Fee Schedule that is available in the Community Development and Neighborhood Services office. The fees are due at the time of submittal of the required documents for the appropriate development review process by City staff and affected outside reviewing agencies. Also, the required Transportation Development Review Fee must be paid at time of submittal. 8. When you are ready to submit your formal plans, please make an appointment with Community Development and Neighborhood Services at (970)221-6750. Pre -Submittal Meetings for Buildinq Permits Pre -Submittal meetings are offered to assist the designer/builder by assuring, early on in the design, that the new commercial or multi -family projects are on track to complying with all of the adopted City codes and Standards listed below. The proposed project should be in the early to mid -design stage for this meeting to be effective and is typically scheduled after the Current Planning conceptual review meeting. Applicants of new commercial or multi -family projects are advised to call 416-2341 to schedule a pre -submittal meeting. Applicants should be prepared to present site plans, floor plans, and elevations and be able to discuss code issues of occupancy, square footage and type of construction being proposed. Construction shall comply with the following adopted codes as amended: 2009 International Building Code (IBC) 2009 International Residential Code (IRC) 2009 International Energy Conservation Code (IECC) 2009 International Mechanical Code (IMC) 2009 International Fuel Gas Code (IFGC) 2009 International Plumbing Code (IPC) as amended by the State of Colorado 2011 National Electrical Code (NEC) as amended by the State of Colorado Accessibility: State Law CRS 9-5 & ICC/ANSI Al17.1-2003. for their requirements well. 5. Any public improvements must be designed and built in accordance with the Larimer County Urban Area Street Standards (LCUASS). They are available online at: http://www.ladmer.org/engineering/GMARdStds/UrbanSt.htm 6. Sidewalk along the frontage of the frontage road will need to be provided. Engineering would not object to an attached sidewalk matching the width of the sidewalk installed on the property directly north a few years ago (I believe 5 feet), though verification with other City departments may be needed on the use of attached sidewalk. 7. The project will need to provide a manner in which pedestrians can traverse across the median separating the driveway directly north that's ADA compliant and maintains the width of the sidewalks that would tie into this crossing. 8. The design of the sidewalk as it reaches the southern boundary of the project may need to be evaluated further with perhaps the sidewalk needing a type III barricade at its termination, or perhaps the sidewalk should be designed to tie into an existing sidewalk network directly south. 9. This project is responsible for dedicating any right-of-way and easements that are necessary for this project. Access easement or right-of-way dedication will be needed in conjunction with the sidewalk required for the project. If right-of-way is proposed to be provided, the monument sign shown could not be located within right-of-way, and right-of-way would need to be continuously dedicated along the abutting frontage road right-of-way. 10. The monument sign, even if not located in right-of-way, may be of concern from a sight distance perspective and may need to be evaluated further. 11. Construction plans will be required. 12. A Development Agreement is required and will be recorded once the project is finalized with recordation costs paid for by the applicant. 13. A Development Construction Permit (DCP) will need to be obtained prior to starting any work on the site. Department: Electric Engineering Contact: Janet McTague, 970-224.6154, jmctague(&fcgov.com 1. Please call Light and Power at 221-6700 and ask for Engineering if electric needs change as a result of the change of use. Current Planning Contact: Seth Lorson, , slorson fcgov.com 1. The proposed change of use also changes the character of the property and therefore is required to be processed at a Major Amendment. In the General Commercial (CG) District Vehicle Sales is subject to review and approval by the Planning and Zoning Board (Type ll). 2. The proposed development project is subject to a Type 2 (Planning and Zoning Board) review and public hearing. The applicant for this development request is required to hold a neighborhood information meeting prior to formal submittal of the proposal. Neighborhood meetings offer an informal way to get feedback from your surrounding neighbors and discover any potential hiccups prior to the formal hearing. Please contact me, at 221-6750, to assist you in setting a date, time, and location. I and possibly other existing site is to direct downspouts to a landscape area. Anotl._ is if perimeter landscape buffers or parking lot medians are required, they could be used to treat the runoff in bio-retention areas or rain gardens. (http://www.udfcd.org/downloads/down_critmanual_vollll.htm) 5. 5. The drainage outfalls for the site are the Frontage Rd. in front and the alley in the rear. There are no storm drains near the site. 6. 6. The city wide Stormwater development fee (PIF) is $6,390.00/acre ($0.1467/sq.ft.) for new impervious area over 350 sq.-ft., and there is a $1,045.00/acre ($0.024/sq.ft.) review fee. No fee is charged for existing impervious area. These fees are to be paid at the time each building permit is issued. Information on fees can be found on the City's web site at http://www.fcgov.com/utilities/business/builders-and-developers/plant-investment-development-fees or contact Jean Pakech at 221- 6375 for questions on fees. There is also an erosion control escrow required before the Development Construction permit is issued. The amount of the escrow is determined by the design engineer, and is based on the site disturbance area or a minimum amount in accordance with the Fort Collins Stormwater Design Criteria. 7. 7. The design of this site must conform to the drainage basin design of the Spring Creek Basin Master Drainage Plan as well the City's Stormwater Design Criteria. Department: Environmental Planning Contact: Lindsay Ex, 970-224-6143, lex(cDfcgov.com 1. With respect to landscaping and design, the City of Fort Collins Land Use Code, in Article 3.2.1 (E)(2)(3), requires that you use native plants and grasses in your landscaping or re -landscaping and reduce bluegrass lawns as much as possible. Reveille Bluegrass is one option for having bluegrass lawns and using less water. 2. The applicant should make note of Article 3.2.1(C) that requires developments to submit plans that "...(4) protects significant trees, natural systems, and habitat". Note that a significant tree is defined as a tree having DBH (Diameter at Breast Height) of six inches or more. If any trees on site have a DBH of greater than six inches, a review of the trees shall be conducted with Tim Buchanan, City Forester (221-6361) to determine the status of the existing trees and any mitigation requirements as the result of development impacts. Department: Engineering Development Review Contact: Marc Virata, 970-221.6567, mvirata&fcgov.com 1. Larimer County Road Impact Fees and Street Oversizing Fees are due at the time of building permit. Please contact Matt Baker at 224-6108 if you have any questions. 2. The City's Transportation Development Review Fee (TDRF) is due at the time of submittal. For additional information on these fees, please see: http:l/www.fcgov.com/engineering/dev-review.php 3. Any damaged curb, gutter and sidewalk existing prior to construction, as well as streets, sidewalks, curbs and gutters, destroyed, damaged or removed due to construction of this project, shall be replaced or restored to City of Fort Collins standards at the Developer's expense prior to the acceptance of completed improvements and/or prior to the issuance of the first Certificate of Occupancy. 4. Please contact the City's Traffic Engineer, Joe Olson (224-6062) to schedule a scoping meeting and determine if a traffic study is needed for this project. In addition, please contact Transportation Planning LUC 3.10 This sectioi.. _.,es apply (see section for requirements) 3. LUC 3.2.5 This section on Trash/recycling enclosures does apply LUC 3.2.4 Requires a lighting plan (see section for requirements) LUC 3.2.1 Requires a landscape plan, should be complete with any mitigation or tree protection and address the required street tree (see section for other requirements). 4. LUC 3.2.2 This section speaks to parking requirements (see section for details). Reminder that parking is a maximum, it will be important to identify which spaces are parking and which are vehicle inventory display. Vehicle display areas must comply with landscaping in Sec. 3.2.1(E)(7) and 3.2.1(E)(4). 5. The purple element on the proposed north elevation is considered a sign and doesn't comply with the sign code (taller than 7', projects above the top of the fasica wall). Note that all signs and locations are processed through sign permits (re -facing a sign does require a sign permit). Department: Water -Wastewater Engineering Contact: Roger Buffington, 970-221.6854, rbuffington(&fcgov.com 1. There is a %/ inch water service extending to the site from the 8-inch main in College. If sidewalk will be constructed along the frontage, some coordination may be needed in the area of the curb stop and meter pit. 2. The water conservation standards for landscape and irrigation will apply. Information on these requirements can be found at: http://www.fcgov.com/standards 3. If there is need for a larger water service, development fees and water rights will be due at building permit. Department: Stormwater Engineering Contact: Glen Schlueter, 970-224-6065, gschlueter(a)fcgov.com 1. 1. It is important to document the existing impervious area since drainage requirements and fees are based on new impervious area. An exhibit showing the existing and proposed impervious areas with a table summarizing the areas is required prior to the time fees are calculated. 2. 2. A drainage letter should be sufficient to document the existing and proposed drainage patterns and any proposed changes. A grading plan is needed if any grading is required for the display pads or any landscape islands that may be required. 3. 3. It appears that most of the site is already impervious and two permeable display pads are proposed so there shouldn't be a need for water quantity detention. 4. 4. If the site is required to meet present Land Use Code requirements, onsite water quality treatment of the runoff is required. Water quality treatment methods are described in the Urban Storm Drainage Criteria Manual, Volume 3 — Best Management Practices (BMPs). A method that could be used on an Fort Collins Community Development and Neighborhood Services 281 North College Avenue PO Box 580 Fort Collins, CO 80522 970.221.6750 970.224.6134 - fax fcgov.com September 24, 2012 Linda Ripley Ripley Design Inc Fort Collins, CO Re: 2712 South College Avenue - Alpenglow Change of Use to Car Dealership Description of project: This is a change of use request for the site located at 2712 South College Avenue from Alpenglow Garden Supply to a Mitsubishi car dealship. As proposed, the request entails a new building facade, two permeable display car pads, new sidewalk and updated landscaping. The site is zoned CG- General Commercial. Please see the following summary of comments regarding the project request referrenced above. The comments offered informally by staff during the Conceptual Review will assist you in preparing the detailed components of the project application. Modifications and additions to these comments may be made at the time of formal review of this project. If you have any questions regarding these comments or the next steps in the review process, you may contact the individual commenter or direct your questions through the Project Planner, Seth Lorson, at 970-224-6189 or slorson@fcgov.com. Comment Summary: Department: Zoning Contact: Noah Beals, 970-416-2313, nbeals(a)fcgov.com Land Use code (LUC) 4.21 Auto sales is normally a Type 2 review in the General Commercial (CG) zone district. However, since this is an older PUD, the change will be processed as either a minor amendment or a major amendment. For it to be a minor amendment, staff needs to determine that the proposal isn't a change in character. Because of the glass front/overhead door showroom exterior changes opening to a view of a showroom with multiple cars, it doesn't look much different from a tpyical car dealership. If the 30 cars in the back lot are all or mostly inventory cars, then again it resembles a tpyical dealership. What are the plans for outdoor lighting? Will there be vehicle servicing? Staff will be able to determine the applicable process once we have more information. That decision may not be able to be made until after the conceptual review meeting, when staff has had an opportunity to discuss it further. 2. LUC 3.5.3 This section does apply (see section for requirements)